会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明公开
    • Method of working connection end of deformed bar for reinforcing concrete, deformed bar worked by the method and structure of connecting deformed bar
    • 一种生产用于增强混凝土的变形钢筋的连接端的方法,通过该方法和结构,用于连接一个变形钢筋制造变形钢筋
    • EP0947642A3
    • 2000-01-12
    • EP99302528.7
    • 1999-03-31
    • Chung, Gyeng Ok
    • Chung, Gyeng OkYoo, Chung Ki
    • E04C5/16E04C5/03B21B1/16
    • E04C5/165B21B1/163E04C5/03
    • With an object of providing a method of working a connection end portion of deformed bar for reinforcing concrete considerably reducing working expense by enhancing easiness of working by promoting mechanical strength of a connection portion by being able to work the connection portion without destructing a steel skeleton structure of a connection portion between pieces of steel bar, deformed bar worked by the method and a connection structure of deformed bar, the invention provides a method of working a connection end portion of deformed bar for reinforcing concrete featured in comprising a swaging step in which in deformed bar for reinforcing concrete featured in swaging at least a connection end portion at normal temperature and forming a rolled thread portion at an outer peripheral face of the connection end portion of the deformed bar subjected to the swaging step in which at least one connection end portion is swaged at a normal temperature such that a maximum diameter of the connection end portion is equal to or slightly larger than a diameter of a cylindrical body of the deformed bar or slightly smaller than a diameter of the deformed bar depending on a degree of working; and    a rolling step of forming a thread portion having a diameter substantially equal to a swaging diameter at an outer peripheral face of the connection end portion of the deformed bar which has been subjected to the swaging step.