    • METHOD OF CONSTRUCTING UNDERGROUND GALLERY BY USING PNEUMATIC TRANSFER SYSTEM, AND STRATUM DISPOSAL METHOD
    • 用于生产地下画廊通过使用气动传输系统以及中层处置程序
    • EP1443177A4
    • 2005-04-13
    • EP02775513
    • 2002-11-08
    • KAJIMA CORP
    • OKUTSU KAZUOTAKAMURA HISASHIHANE KOJIMATSUI NOBUYUKIHAYAKAWA YASUYUKIFURUICHI MITSUAKI
    • E21D13/02B09B1/00B65G51/04E21D1/00E21D9/13E21F13/04E21F17/16G21F9/34G21F9/36E21D9/12
    • G21F9/36E21D1/00E21D9/13E21F17/16G21F9/34
    • A method of constructing underground galleries using a pneumatic transfer system and a stratum disposal method are provided, wherein in constructing disposal galleries, mountain tunnels or the like in a stratum disposal site or in performing stratum disposal of waste matter, the carrying-out of excavation chips or the like and carrying-in of materials and equipment or the like and the carrying-in and positioning of waste matter can be effected safely, quickly and reliably at low cost, and the quality of buffer material for waste matter can be secured. In construction, an air carrying pipeline 10 is used while extending the air carrying pipeline 10 downward as desired during the excavation of a vertical shaft 2a so as to carry out vertical shaft excavation chips a to the ground and carry in materials and equipment including vertical shaft spray concrete b to the underground site. Alternatively, the vertical shaft itself is used as the air carrying pipeline 10, and by using the air carrying pipeline 10 extending from the vertical shaft 2a to an underground gallery 3, excavation chips a from the underground gallery 3 are carried out to the ground and materials and equipment for the underground gallery are carried in to the underground site. In operation, the air carrying pipeline 10 is used to carry in a carrying container 11 having the waste matter A and a buffer material B, which are integrated together, stored therein, to the underground side, and the integrated waste matter A and buffer material B are positioned and buried in a disposal hole 7.
    • 提供构建使用气动传输系统和地层处置方法地下画廊的方法,worin在构造地层处置场和隧道的处置画廊:如山隧道或在执行地层处置的废物,搬出的 挖掘芯片或类似物,所述的材料和设备或类似物并搬入和废物定位搬入可以安全地进行,快速而可靠地以低成本,以及用于废物物质的缓冲材料的质量可被固定 , 在施工中,在空气中携带管道(10),而扩展携带管道(10)的空气被用于向下的垂直轴(2)的挖掘过程中如所希望的,以便进行垂直轴挖掘碎片(a)到地面,并携带 在材料和设备,包括垂直轴喷雾混凝土(b)向所述地下部位。 可替代地,垂直轴本身被用作空气承载管道(10),并且通过使用带有管道(10)从垂直轴(2a)的延伸到空气中,在地下廊(3)中,从挖掘碎片(a) 地下画廊(3)都进行了地面,材料和设备的地下画廊地下网站都进行。 在手术中,空气承载管道(10)被用于在搬运容器(11)与所述废物物质(A)和缓冲材料(13)来进行集成在一起及所存,向地下部位以及综合废物 物(A)和缓冲材料(B)被定位和埋在废弃孔(7)。