会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Vertical shaft turbomachine
    • 垂直轴涡轮机
    • US09163526B2
    • 2015-10-20
    • US13579140
    • 2011-02-23
    • Frederic Batlle
    • Frederic Batlle
    • F01D25/16F02C7/06
    • F01D25/16F02C7/06F05D2220/329F05D2250/315Y02T50/671
    • A turbomachine includes a compressor, a first shaft, a second shaft, a first turbine, and a second turbine. The first shaft carries at least one turbine wheel belonging to one of the elements selected from the first and second turbines. The second shaft carries at least one turbine wheel belonging to the other element selected from the first and second turbines. The first and second shafts are oriented substantially vertically in normal utilization situations of the turbomachine. The first shaft is held by a first single bearing while the second shaft is held by a second single bearing.
    • 涡轮机包括压缩机,第一轴,第二轴,第一涡轮和第二涡轮机。 第一轴承载属于从第一和第二涡轮机选择的元件之一的至少一个涡轮机叶轮。 第二轴承载属于从第一和第二涡轮机选择的另一元件的至少一个涡轮机叶轮。 在涡轮机的正常使用情况下,第一和第二轴基本垂直地定向。 第一轴由第一单个轴承保持,而第二轴由第二单个轴承保持。
    • 10. 发明授权
    • Coal fired power generation plant
    • 燃煤发电厂
    • US07478524B2
    • 2009-01-20
    • US11467601
    • 2006-08-28
    • Franz Kreitmeier
    • Franz Kreitmeier
    • F02C6/00
    • F01K7/16F01K23/062F01K23/16F02C3/205F02C6/18F05D2250/315F05D2270/082
    • A power generation plant includes a conventional steam turbo train, a high temperature turbo train, and a coal fired boiler (1) with a fluidized bed combustor. The high temperature turbo train is particularly arranged vertically and in parallel with the coal fired boiler (1) and separately from the conventional turbo train. Transfer flow lines (4, 5, 6) are run from the boiler (1) to the high temperature turbines over minimal lengths. The arrangement of the two turbo trains separately from one another and the vertical arrangement of the high temperature turbo train are advantageous in terms of plant efficiency and fabrication and maintenance thereof.
    • 发电厂包括常规蒸汽轮机,高温涡轮增压机和具有流化床燃烧器的燃煤锅炉(1)。 高温涡轮列车特别布置成与燃煤锅炉(1)垂直并且与传统涡轮增压器分开。 转移流水线(4,5,6)以最小长度从锅炉(1)运行到高温涡轮机。 两个涡轮列车彼此分开的布置以及高温涡轮列车的垂直布置在设备效率及其制造和维护方面是有利的。