会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明授权
    • Method of operating a wind power station
    • 运行风力发电站的方法
    • US07619321B2
    • 2009-11-17
    • US10553429
    • 2004-03-31
    • Aloys Wobben
    • Aloys Wobben
    • F03D9/00H02P9/04
    • F03D7/0268F03D80/00F03D80/20F05B2200/12F05B2270/19Y02B10/30Y02E10/723
    • When planning and setting up wind power installations, the visual detractions to be expected on the part of the wind power installation on the environment play an increasingly important part in approval and acceptance. The shadow casting caused by the wind power installation on the adjoining properties is often perceived by the residents as being very troublesome.A wind power installation is provided by means of which shadow casting regulation is improved. That is achieved by a method of operating a wind power installation wherein a first light intensity is detected in a region of direct light irradiation and a second light intensity is detected in a shadowed region, and wherein the wind power installation is shut down if the difference between the first light intensity and the second light intensity is greater than a predetermined value.
    • 在规划设置风力发电设备时,风力发电设备在环境方面的视觉偏差在批准和验收中起着越来越重要的作用。 风力发电设备造成的相邻物业的影子通常被居民认为是非常麻烦的。 提供了风力发电设备,通过该设备改善了阴影投射调节。 这是通过操作风力发电设备的方法实现的,其中在直接光照射的区域中检测到第一光强度并且在阴影区域中检测到第二光强度,并且其中如果差异 在第一光强度和第二光强度之间大于预定值。