会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明公开
    • SHIPBORNE TRUSS COMBINED IN-SITU TESTING PLATFORM
    • 化学工业杂志在新加坡麻省理工学院
    • EP2933379A1
    • 2015-10-21
    • EP13892027.7
    • 2013-11-14
    • CCCC Third Harbor Consultants Co., Ltd
    • HU, JianpingNIU, JiandingCHENG, ZekunCHENG, LiminCHEN, ZhiyongLI, XiaojieCAI, HongboDONG, ShuhaiWANG, NianxiDONG, JiaosheHU, ZhenmingWU, Chaodong
    • E02D1/00B63B35/44
    • E21B15/02B63B17/00B63B35/44E21B7/122
    • A shipborne truss combined in-situ testing platform comprising: a truss load bearing frame (400), formed by vertically connecting a plurality of truss modules (410) in series; an operation platform (200), fixed at an upper end of the truss load bearing frame (400), a machine frame seat (204) used for installing an in-situ testing device (201) being disposed on the operation platform (200); a drive shoe (500) fixed at a lower end of the truss load bearing frame (400), the bottom of the drive shoe (500) being provided with shoe teeth (503); a catheter (600), successively penetrating the operation platform (200), the truss load bearing frame (400), and the drive shoe (500) along an up-down direction; and a centering device (300), comprising a plurality of soft ropes (302), one end of the soft rope (302) being connected to the upper end of the truss load bearing frame (400) or the operation platform (200).
    • 一种船载桁架组合原位测试平台,包括:桁架承载框架(400),其通过串联垂直连接多个桁架模块(410)而形成; 固定在桁架承载架(400)的上端的操作平台(200),用于安装在操作平台(200)上的现场测试装置(201)的机架座(204) ; 固定在所述桁架承载架(400)的下端的驱动靴(500),所述驱动靴(500)的底部设有鞋齿(503); 沿着上下方向连续地穿过操作平台(200),桁架承载框架(400)和驱动靴(500)的导管(600) 以及定心装置(300),其包括多根软绳(302),所述软绳(302)的一端连接到所述桁架承载框架(400)的上端或所述操作平台(200)。
    • 10. 发明公开
    • Offshore drilling installation and method for offshore drilling
    • Offshore-Bohranlage und Verfahren zum Offshore-Bohren
    • EP2955317A1
    • 2015-12-16
    • EP14194709.3
    • 2014-11-25
    • FUGRO ENGINEERS B.V.
    • Looijen, Peter
    • E21B7/128E21B7/12
    • B63B35/4413E21B7/122E21B7/128
    • Offshore drilling installation comprising a platform selected from the group comprising a vessel, a pontoon, a jack-up, and further comprising a drill string drivingly connected with said platform and optionally provided with a heave motion compensator, wherein at its lower end the drill string is provided with a drill bit, and wherein a seabed template suspended with lift wires from the platform is placed on a seabed, and wherein clamping means mounted in the seabed template are provided for fixing the drill string relative to the seabed template, which clamping means are embodied as a chuck which is arranged for clamping the drill string whilst enabling the drill string's rotation.
    • 海上钻井设备包括从包括船舶,浮筒,自升式起重机的组中选择的平台,并且还包括与所述平台驱动连接的钻柱,并且可选地设置有升降运动补偿器,其中在其下端具有钻柱 设置有钻头,并且其中将悬挂有来自所述平台的电梯电线的海底模板放置在海床上,并且其中设置安装在所述海底模板中的夹紧装置用于固定所述钻柱相对于所述海床模板,所述夹紧装置 被实施为卡盘,其被布置用于夹持钻柱同时使得钻柱的旋转。