会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • SYSTEM AND METHOD FOR CONTROLLING SIGNALING DEVICES ALONG RAILROAD TRACKS IN ELECTRIFIED TERRITORY
    • 系统和方法,用于沿着电气区域的铁路轨道控制信号装置
    • WO2017222544A1
    • 2017-12-28
    • PCT/US2016/039166
    • 2016-06-24
    • SIEMENS INDUSTRY, INC.
    • HOGAN, Brian JosephEDDS, A. NathanBAMFIELD, Richard
    • B61L1/18B61L7/10B61L23/16
    • B61L23/168B61L23/166
    • A system (100) and method is provided that facilitates controlling signaling devices along railroad tracks in electrified territory. The system may include a first track circuit transmitter (116) connectable to a first end (160) of a first block (162) of a railroad track (180). A first processor (104) may be configured to determine a first signaling aspect (112) corresponding to a visible light signal outputted by a first signaling device (110) and cause the first track circuit transmitter to transmit a first code (166) corresponding to the first signaling aspect via a first AC carrier signal (164) through rails (182, 184) of the first block of the railroad track. The system may also include a first track circuit receiver (134) connectable to a second end (168) of the first block of the railroad track, which is configured to receive the first AC carrier signal through the rails of the first block of the railroad track and demodulate the first code from the first AC carrier signal. A second processor (124) may be configured to determine a second signaling aspect (132) based at least in part on the first code that was demodulated and cause a second signaling device (130) to output a visible signal corresponding to the second signaling aspect.
    • 提供了一种系统(100)和方法,该系统(100)和方法有助于控制沿电气领域中的铁轨的信号装置。 该系统可以包括可连接到铁路轨道(180)的第一块(162)的第一端(160)的第一轨道电路发射器(116)。 第一处理器(104)可以被配置为确定对应于由第一信令设备(110)输出的可见光信号的第一信令方面(112),并且使第一轨道电路发射机发送对应于第一信号的第一码(166) 所述第一信令方面经由第一AC载波信号(164)通过所述铁路轨道的所述第一块的轨道(182,184)。 该系统还可以包括可连接到铁轨的第一块的第二端(168)的第一轨道电路接收器(134),其被配置为通过铁路的第一块的轨道接收第一AC载波信号 跟踪并解调来自第一AC载波信号的第一码。 第二处理器(124)可以被配置为至少部分地基于被解调的第一码来确定第二信令方面(132),并且使得第二信令设备(130)输出与第二信令方面相对应的可见信号
    • 6. 发明申请
    • METHOD AND DEVICE FOR EVALUATION OF MEASUREMENT DATA IN RAILWAY TRACK CIRCUITS
    • 方法和设备是用于评估数据登录铁路轨道电路
    • WO2008052643A2
    • 2008-05-08
    • PCT/EP2007008808
    • 2007-10-10
    • SIEMENS SCHWEIZ AGELLENBERGER PETERSCHLUER TOBIAS
    • ELLENBERGER PETERSCHLUER TOBIAS
    • B61L1/18
    • B61L1/187B61L23/166
    • A device and a method for operation of railway track circuits are disclosed, which have an associated section length which is restricted at both ends by track isolation. The following procedure is used for reliable identification of the states of FREE, BUSY and DISTURBED within a predetermined time limit. A transmitted signal is fed into the rail body at one of the two section ends. The received signal is output at the opposite end, and is passed on for analysis. The transmitted signal that is fed in is sinusoidal. The frequency is switched cyclically between two discrete values. Three evaluation channels are operated at the receiving end. The information is A/D-converted for all three channels. Two channels have a bandpass input filter, which is matched to pass the channel (1) with the frequency that is currently being transmitted, for the other channel (2) with the frequency which is not being transmitted. The busy state is detected by the channel (1). The currently occurring disturbance influence is measured by the channel (2). The channel (3) carries out sampling in the respective transmission interval, and evaluates the calculated FFT results. Further data is obtained from this information. Data that may be mentioned in this case includes isolation shock bridging, disturbance influences and further process-relevant variables.
    • 中公开的装置和轨道电路,其具有由一个绝缘轨道两侧上限定的相关联的部分的长度的操作的方法。 免费,BUSY和嘈杂在如下给定时间限制的状态的可靠检测被移动。 在传输信号的两个部分的端部中的一个被供给到导轨主体。 在相反侧,接收的信号被耦合出并馈送到分析。 所注入的发送信号是正弦的。 频率被循环地切换在两个离散值之间。 在接收侧的三个评价信道操作。 的信息被转换为所有三个通道A / D。 对于当前频率的信道(1)被发送,对其它信道(2)的尚未发送适于通过两个信道的频率通过的带通Eingangsf有ILTER。 与信道被检测到(1)的拥塞状态。 与通道(2)被测量,当前的实际干扰。 信道(3)是在每个传输时间间隔取样,并从计算所计算的FFT结果。 从这个信息中,获得额外的数据。 拿的都是绝缘接头桥接,干扰等过程相关的大。
    • 9. 发明公开
    • VERFAHREN UND EINRICHTUNG ZUM AUSWERTEN VON MESSDATEN IN EISENBAHNGLEISSTROMKREISEN
    • 方法和设备是用于评估数据登录铁路轨道电路
    • EP2084048A2
    • 2009-08-05
    • EP07818881.0
    • 2007-10-10
    • Siemens Schweiz AG
    • ELLENBERGER, PeterSCHLUER, Tobias
    • B61L1/18
    • B61L1/187B61L23/166
    • A device and a method for operation of railway track circuits are disclosed, which have an associated section length which is restricted at both ends by track isolation. The following procedure is used for reliable identification of the states of FREE, BUSY and DISTURBED within a predetermined time limit. A transmitted signal is fed into the rail body at one of the two section ends. The received signal is output at the opposite end, and is passed on for analysis. The transmitted signal that is fed in is sinusoidal. The frequency is switched cyclically between two discrete values. Three evaluation channels are operated at the receiving end. The information is A/D-converted for all three channels. Two channels have a bandpass input filter, which is matched to pass the channel (1) with the frequency that is currently being transmitted, for the other channel (2) with the frequency which is not being transmitted. The busy state is detected by the channel (1). The currently occurring disturbance influence is measured by the channel (2). The channel (3) carries out sampling in the respective transmission interval, and evaluates the calculated FFT results. Further data is obtained from this information. Data that may be mentioned in this case includes isolation shock bridging, disturbance influences and further process-relevant variables.