    • Optimized methodology for dispositioning missed scheduled tasks
    • 处理错过的计划任务的优化方法
    • US08141081B2
    • 2012-03-20
    • US12017136
    • 2008-01-21
    • Zhengwen HeWilliam Roy YonkerChristopher Zaremba
    • Zhengwen HeWilliam Roy YonkerChristopher Zaremba
    • G06F9/46G06F13/00
    • G06F9/4881
    • The present invention provides for a method and system for the disposition of tasks which failed to run during their originally scheduled time. The determination of whether to run missed or delayed tasks is based on calculated ratios rather than on fixed window sizes. A Lateness Ratio is calculated to determine if the time elapsed between the missed task and the scheduled run time is small enough to still allow a late task to run. A Closeness Ratio is calculated to determine if the next available run time for the missed task is close enough to the next scheduled execution of the task that the missed task will be run in place of the upcoming scheduled task. Each ratio is compared to a user defined ratio limit, so if the calculated ratio does not exceed the limit, then the missed task is executed at the first available opportunity.
    • 本发明提供了一种用于处理在原始预定时间内未能运行的任务的方法和系统。 是否运行错过或延迟任务的确定是基于计算的比率而不是固定的窗口大小。 计算延迟比率,以确定错过的任务和计划的运行时间之间经过的时间是否足够小,以至于仍然允许迟到的任务运行。 计算闭合率以确定未完成任务的下一个可用运行时间是否足够接近任务的下一个计划执行,以使运行未完成任务代替即将到来的计划任务。 将每个比率与用户定义的比率限制进行比较,因此如果计算的比率不超过限制,则在第一个可用机会执行错过的任务。
    • 2. 发明申请
    • OPTIMIZED METHODOLOGY FOR DISPOSITIONING MISSED SCHEDULED TASKS
    • 处理未完成调度任务的优化方法
    • US20090187908A1
    • 2009-07-23
    • US12017136
    • 2008-01-21
    • Zhengwen HeWilliam R. YonkerChristopher Zaremba
    • Zhengwen HeWilliam R. YonkerChristopher Zaremba
    • G06F9/46
    • G06F9/4881
    • The present invention provides for a method and system for the disposition of tasks which failed to run during their originally scheduled time. The determination of whether to run missed or delayed tasks is based on calculated ratios rather than on fixed window sizes. A Lateness Ratio is calculated to determine if the time elapsed between the missed task and the scheduled run time is small enough to still allow a late task to run. A Closeness Ratio is calculated to determine if the next available run time for the missed task is close enough to the next scheduled execution of the task that the missed task will be run in place of the upcoming scheduled task. Each ratio is compared to a user defined ratio limit, so if the calculated ratio does not exceed the limit, then the missed task is executed at the first available opportunity.
    • 本发明提供了一种用于处理在原始预定时间内未能运行的任务的方法和系统。 是否运行错过或延迟任务的确定是基于计算的比率而不是固定的窗口大小。 计算延迟比率,以确定错过的任务和计划的运行时间之间经过的时间是否足够小,以至于仍然允许迟到的任务运行。 计算闭合率以确定未完成任务的下一个可用运行时间是否足够接近任务的下一个计划执行,以使运行未完成任务代替即将到来的计划任务。 将每个比率与用户定义的比率限制进行比较,因此如果计算的比率不超过限制,则在第一个可用机会执行错过的任务。