会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 9. 发明申请
    • COMPLETION FOR DOWNHOLE APPLICATIONS
    • 完成倒塌应用
    • US20130048307A1
    • 2013-02-28
    • US13469967
    • 2012-05-11
    • Dinesh R. Patel
    • Dinesh R. Patel
    • E21B23/00E21B19/16
    • E21B17/023E21B17/028
    • A technique facilitates connection and disconnection of an upper completion with respect to a lower completion. An overall completion system comprises the upper completion releasably engaged with the lower completion. The upper completion and the lower completion may comprise hydraulic line segments and electrical line segments which are coupled via at least one hydraulic wet connect and at least one inductive coupler, respectively. The hydraulic line segments may comprise hydraulic control line segments, chemical injection line segments, or a variety of other types of hydraulic line segments that may be selectively engaged and disengaged by the at least one hydraulic wet connect.
    • 一种技术有助于相对于较低完成的上完成的连接和断开。 总体完成系统包括可完成与较低完成可释放地接合的上部完成。 上完成和下完成可以包括分别通过至少一个液压湿连接和至少一个电感耦合器耦合的液压线段和电线段。 液压管线段可以包括液压控制管线段,化学注入管段或各种其它类型的液压管段,其可通过至少一个液压湿式连接件选择性地接合和分离。