会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Power plant and associated starting method
    • 发电厂及相关启动方式
    • US06725663B2
    • 2004-04-27
    • US10216900
    • 2002-08-13
    • Velimir BakranPeter Keller-SornigIlja Tuschy
    • Velimir BakranPeter Keller-SornigIlja Tuschy
    • F01K734
    • F02C7/08F02C6/16Y02E60/15
    • The invention relates to a power plant (1), with at least one turbo group (2) comprising at least one turbine (3) and at least one main burner (5) which is arranged upstream of the turbine (3), with at least one recuperator (11) which is arranged, on the one hand, in a first flow path (15) leading gas toward the turbo group (2) and, on the other hand, in a second flow path (12) leading the gas away from the turbo group (2), with at least one auxiliary burner (19) which is arranged outside the second flow path (12) and which is connected on the outlet side, at or upstream of the recuperator (11), to the second flow path (12).
    • 本发明涉及一种发电厂(1),其中至少一个涡轮组(2)包括至少一个涡轮机(3)和至少一个主燃烧器(5),该主燃烧器设置在涡轮机(3)的上游, 另一方面,至少一个换热器(11)一方面设置在使气体朝向涡轮组(2)的第一流动路径(15)中,另一方面在引导气体的第二流路(12)中 远离涡轮组(2)的至少一个辅助燃烧器(19)设置在第二流动通道(12)的外侧,并且连接在出口侧,在换热器(11)的上游, 第二流路(12)。