会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • CONTROL OF A WIND POWER PLANT
    • 风力发电厂的控制
    • WO2017118460A1
    • 2017-07-13
    • PCT/DK2016/050451
    • 2016-12-20
    • VESTAS WIND SYSTEMS A/S
    • GARCIA, Jorge MartinezNAYEBI, KouroushVALCAN, Dumitru-MihaiWEI, Mu
    • F03D7/02F03D7/04H02J3/38
    • F03D7/0284F03D7/048F05B2270/1071F05B2270/337H02J3/386Y02E10/723
    • The present invention relates to a method for controlling a wind power plant, WPP, comprising a plurality of wind turbine generators, WTGs, connected to an electrical grid, the method comprising: setting a plant power reference (Ptotal) according to an electrical value of the electrical grid;determining an inertia delta power reference (IRdeltaP)required for the WPP to meet a power demand in response to a change in the electrical value;adding the inertia delta power reference and the plant power reference (Ptotal) to form a power reference (Ptotalref);deriving an overboost reference (PrefOB) as the difference between the power reference (Ptotalref) and an available power value;dispatching the power reference (Ptotalref) to each wind turbine generator;dispatching the overboost reference (PrefOB) to each wind turbine generator. The invention also relates to a wind power plant control system and a wind power plant comprising a control system.
    • 风力发电站WPP的控制方法技术领域本发明涉及一种用于控制风力发电站WPP的方法,该风力发电站WPP包括连接到电网的多个风力涡轮发电机WTG,该方法包括:设置工厂功率参考(WPG) Ptotal);确定所述WPP响应于所述电气值的变化而满足电力需求所需的惯性增量功率参考(IRdeltaP);将所述惯性增量功率参考和所述设备功率 参考(Ptotal)以形成功率参考(Ptotalref);获得作为功率参考(Ptotalref)和可用功率值之间的差值的过增压参考(Pref0B);将功率参考(Ptotalref)调度到每个风力涡轮发电机;调度 每台风力发电机的过压参考(PrefOB)。 本发明还涉及包括控制系统的风力发电站控制系统和风力发电站。
    • 7. 发明申请
    • IMPROVEMENTS RELATING TO THE INTERCONNECTION OF MULTIPLE RENEWABLE ENERGY POWER PLANTS
    • 关于多个可再生能源电厂相互连接的改进
    • WO2017167335A1
    • 2017-10-05
    • PCT/DK2017/050074
    • 2017-03-15
    • VESTAS WIND SYSTEMS A/S
    • GUPTA, ManojLÆRKE, RasmusMA, YuchaoPANNI, RubinVALCAN, Dumitru-Mihai
    • F03D7/02F03D7/04H02J3/38F03D9/25
    • A method of controlling a first renewable energy power plant, comprising: determining power delivery of the first renewable energy power plant to a collector bus;receiving data relating to power delivery from a second renewable energy power plant connected to the collector bus;determining the combined power delivery of the first and second renewable energy power plants to the collector bus;estimating the transmission line power loss on a first transmission line between the collector bus and a power grid point of interconnection (POI) based on the combined power delivery; and regulating the power delivery from the first renewable energy power plant to compensate for the estimated transmission line power loss. Aspects of the invention also relate to a computer program product downloadable from a communication network and/or stored on a machine readable medium, comprising program code instructions for implementing a method as defined above, and to a power plant controller.
    • 控制第一可再生能源发电厂的方法,包括:确定第一可再生能源发电厂向收集器总线的功率输送;接收与来自第二可再生能源发电厂的功率输送有关的数据 ;确定所述第一和第二可再生能源发电厂到所述收集器总线的组合动力输送;估计所述收集器总线和电力网互连点(POI)之间的第一传输线上的所述传输线功率损失 在联合电力传输; 并且调节来自第一可再生能源发电厂的电力输送以补偿估计的输电线路功率损耗。 本发明的各方面还涉及可从通信网络下载和/或存储在机器可读介质上的计算机程序产品,包括用于实现如上定义的方法的程序代码指令以及发电厂控制器。