    • 1. 发明专利
    • Basket for chipping pile head part
    • 。。。。。。
    • JP2008285856A
    • 2008-11-27
    • JP2007130520
    • 2007-05-16
    • Toyo Constr Co Ltd東洋建設株式会社
    • YAMASHITA KASUMIKUMAMOTO MAMORUWATANABE KOJISAKASHITA KATSUHIRO
    • E01D22/00E01D15/24E01D24/00
    • PROBLEM TO BE SOLVED: To smoothly chip a pile head part during the removal of an upper structure, and easily install and remove a scaffold for chipping.
      SOLUTION: A floor board 14, pile bands 16, and a fence 18 are divided into two parts by a vertical cross section extending through the center of the opening of the floor board 14. The upper ends of one fence 18A and the other fence 18B divided into two parts are pivotally attached to each other through a pivot 22. When the scaffold is installed on the pile head part 3, as shown in (a), a basket 12 for chipping a pile head part divided into two parts is suspended by a crane, and put on the pile head part 3 with its lower part opened about the pivot 22. Then, as shown in (b), one 12A and the other 12B of the basket divided into two parts are closed for clamping a pile 2 by the pile bands 16A, 16B.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:在去除上部结构时平滑地打桩桩头部分,并且容易地安装和移除用于切碎的脚手架。 解决方案:地板14,桩带16和围栏18通过延伸穿过地板14的开口的中心的垂直横截面分成两部分。一个围栏18A的上端和 另外,分割成两部分的隔板18B通过枢轴22可枢转地相互连接。如(a)所示,当将脚手架安装在桩头部3上时,将用于将桩头部分分割成两部分的筐12 由起重机悬挂,并将其下部围绕枢轴22打开,并放置在桩头部分3上。然后,如(b)所示,分为两部分的一个12A和另一个12B被关闭以夹紧 由桩带16A,16B组成的桩2。 版权所有(C)2009,JPO&INPIT