会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Improvement body for suppressing deformation of earth-retaining wall, and suppression method
    • 改进用于抑制地球保持墙变形的体系,以及抑制方法
    • JP2012017584A
    • 2012-01-26
    • JP2010154644
    • 2010-07-07
    • Toda Constr Co Ltd戸田建設株式会社
    • ISHIMARU TATSUROSANO DAISAKUYASHIRO SHIGEMI
    • E02D17/04E02D3/12
    • PROBLEM TO BE SOLVED: To provide an improvement body for suppressing deformation of an earth-retaining wall capable of achieving reduction of construction period and cost, and construction with less wastage and environmental influence compared to conventional improvement bodies for suppressing deformation of the earth-retaining wall.SOLUTION: During excavation of a ground while constructing earth-retaining walls, improvement bodies prevent the earth-retaining walls from deforming towards the excavation area side. Each of the improvement bodies for suppressing deformation of the earth-retaining walls is formed in a "T" shape including: a parallel part with a required length along an earth-retaining wall; and a perpendicular part perpendicular to the earth-retaining wall, being within the length not to reach an earth-retaining wall opposite the aforesaid earth-retaining wall.
    • 解决问题:提供一种用于抑制能够实现施工周期和成本降低的挡土墙的变形的改进体,并且与用于抑制变形的常规改进体相比,具有较少的浪费和环境影响的结构 挡土墙。 解决方案:在建造挡土墙的同时挖掘地面时,改进体可防止挡土墙向开挖区域侧变形。 用于抑制挡土墙变形的每个改进体形成为“T”形,包括:沿着挡土墙具有所需长度的平行部分; 以及垂直于挡土墙的垂直部分,其长度不能到达与上述挡土墙相对的挡土墙。 版权所有(C)2012,JPO&INPIT
    • 4. 发明专利
    • Fixing device for self-elevation type external curing apparatus, installation method thereof and self-elevation type external curing apparatus
    • 用于自升式外部固化装置的固定装置,其安装方法和自升式外部固化装置
    • JP2013047459A
    • 2013-03-07
    • JP2012262726
    • 2012-11-30
    • Toda Constr Co Ltd戸田建設株式会社Jfe Civil Engineering & Construction CorpJfeシビル株式会社
    • MIWA AKIHIROSUZUKI SHINYAISHIMARU TATSUROTAKUMA MAKOTOSASAKI HAJIMENAITO HITOSHI
    • E04G21/32
    • PROBLEM TO BE SOLVED: To solve the problem of a conventional fixing device, regarding a fixing device for a self-elevation type external curing apparatus, that much time and efforts are required for alignment in the case of bolt fastening in a structure for fitting with the external curing apparatus, and since a bracket or the like for supporting the curing apparatus is expanded while being welded to a column, much time and efforts are required for fixing work.SOLUTION: A fixing device 1 for a self-elevation type external curing apparatus comprises a casing which is fixed in a portion at a building side, and a support bracket of which the distal end portion is expanded outside of the building on a side surface of the casing. On an upper surface of a horizontal member bridging the distal end portion of the bracket, a pin member or a pin hole is provided which is fitted freely removable to an engaging part of an arm part protruded from the external curing apparatus supported by the fixing device, and a tapered part for centering is provided in the pin member or the pin hole.
    • 要解决的问题为了解决现有的定影装置的问题,关于自立式外部固化装置的定影装置,在结构中的螺栓紧固的情况下需要花费大量的时间和精力进行对准 用于与外部固化装置配合,并且由于用于支撑固化装置的支架等在被焊接到柱上的同时被扩大,因此需要花费大量的时间和努力来进行固定工作。 解决方案:一种用于自立式外部固化装置的固定装置1包括固定在建筑物侧的部分中的壳体,以及支撑托架,其远端部分在建筑物的外部扩展到 外壳的侧面。 在桥接支架的前端部的水平构件的上表面上,设置有销部件或销孔,该销部件或销孔可自由移动地配合到从由固定装置支撑的外部固化装置突出的臂部的接合部 并且在销构件或销孔中设置用于对中的锥形部。 版权所有(C)2013,JPO&INPIT
    • 5. 发明专利
    • Base-isolating method for existing building
    • 现有建筑的基础隔离方法
    • JP2011017187A
    • 2011-01-27
    • JP2009162541
    • 2009-07-09
    • Toda Constr Co Ltd戸田建設株式会社
    • ISHIMARU TATSUROYAGINUMA SHUNICHIUENAGA MICHIRONISHIMURA TAKESHIISHIOKA HIROSHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a base-isolating method for an existing building, which enables construction to be performed by utilizing an existing column, when a footing beam and the like for temporarily bearing a load of the building do not exist in the existing building.SOLUTION: In this construction method for base-isolating the whole building by inserting a base-isolating device into the column of the existing building, a lower reinforcing portion 5 reinforcing a downside existing portion, and an upper reinforcing portion 12 formed on the periphery of the existing column midway through the existing column on an upside are formed as reaction members when the load of the existing building is temporarily borne by a temporary bearing support. In the base-isolating method for the existing building, required prestress is imparted to the upper reinforcing portion 12 by a tendon 10 which is embedded in the upper reinforcing portion 12 and which has its both ends exposed on the outside; and subsequently, the load of the existing building is temporarily borne by the temporary bearing support 13a and a jack 13b, which are arranged in a vertical section between the lower and upper reinforcing portions 5 and 12.
    • 要解决的问题:为了提供现有建筑物的基础隔离方法,其能够通过利用现有的塔进行施工,当用于临时承载建筑物的载荷的基脚梁等不存在于现有建筑物中时 建筑物。在这种通过将现有建筑物的柱中插入基底隔离装置来将整个建筑物隔离的施工方法中,加强下部存在部分的下部加强部分5和形成在其上的上部加强部分12 当现有建筑物的载荷暂时由临时轴承支撑件承载时,在上侧的现有列中间的现有列的​​边缘形成为反作用构件。 在现有建筑物的基础隔离方法中,通过嵌入在上加强部12中并且其两端露出在外侧的腱10将所需的预应力赋予上加强部12。 并且随后,现有建筑物的载荷暂时由临时轴承支撑件13a和千斤顶13b承载,该突起部件布置在下部和上部加强部分5和12之间的垂直部分中。
    • 6. 发明专利
    • Slab demolition method and demolition device
    • SLAB拆解方法和拆卸装置
    • JP2013104220A
    • 2013-05-30
    • JP2011248481
    • 2011-11-14
    • Toda Constr Co Ltd戸田建設株式会社
    • MIWA AKIHIROSUZUKI SHINYAISHIMARU TATSUROTAKUMA MAKOTO
    • E04G23/08
    • PROBLEM TO BE SOLVED: To provide a slab demolition method and demolition device capable of solving the problem that a conventional slab demolition method takes labor, costs and time since a slab of a demolition object needs to be supported with a support so as not to fall.SOLUTION: In the slab demolition method for cutting, removing and demolishing a slab, a concrete cutter having an angle adjusting mechanism for a blade is prepared for the slab of a cutting object, cutting is performed with the blade so as to obliquely perform cutting to a cutting object inner side from a floor surface of the slab to the back surface to form oblique cut parts 13a, 13b, a wedge 13 for preventing slipping-down of the slab is implanted to the oblique cut parts, the slab of a cutting object 12 is cut off so as to be lifted from the other slabs having the oblique cut parts in at least part of a cut part, and the slab of the cutting object 12 which is made liftable is removed with a lifting device.
    • 要解决的问题:提供一种能够解决常规板块拆除方法需要劳动的成本和时间的平板拆除方法和拆除装置,因为需要用支撑件支撑拆卸物体的平板,所以需要支撑,因此 不跌倒 解决方案:在用于切割,移除和拆除板坯的板坯拆除方法中,准备具有用于叶片的角度调节机构的混凝土切割机,用于切割物体的板坯,用刀片进行切割以便倾斜 对切​​割对象内侧进行从板坯的地板表面到后表面的切割,以形成倾斜切割部分13a,13b,将用于防止板坯滑落的楔形件13植入到倾斜切割部分中, 在切割部分的至少一部分中切割切割物体12以从具有倾斜切割部分的其他板材提起,并且用提升装置移除可升降的切割物体12的板坯。 版权所有(C)2013,JPO&INPIT
    • 7. 发明专利
    • Method and device for restraining horizontal force in base-isolating work
    • 在基础隔离工作中限制水平力的方法和装置
    • JP2010070941A
    • 2010-04-02
    • JP2008237807
    • 2008-09-17
    • Toda Constr Co Ltd戸田建設株式会社
    • YAGINUMA SHUNICHIUENAGA MICHIROISHIMARU TATSURONISHIMURA TAKESHIIWAMOTO SATOSHI
    • E04G23/02E04H9/02
    • PROBLEM TO BE SOLVED: To provide a method for restraining a horizontal force in base-isolating work, which enables a restraining force to be exerted in all directions by a simple constitution, and which can reduce the cost of members. SOLUTION: In this method for restraining the horizontal force in the base-isolating work, a tubular earthquake-resisting plate 1 for being erected on a lower foundation 2 and an upper foundation 4 is formed in the base-isolating work of an existing building, and set on the lower foundation constructed during the base-isolating work; the upper foundation is constructed on the upper position of the lower foundation; after that, the tubular earthquake-resisting plate 1 is lifted upward from the lower foundation 2 and erected between the upper and lower foundations; subsequently, a grout material is infilled between the inside wall surface of the tubular earthquake-resisting plate 1 and the wall surfaces of the upper and lower foundations, so that they can be integrated together; and the existing building is restrained not to be displaced horizontally during earthquakes. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种限制基础隔离作业中的水平力的方法,其能够通过简单的结构使所有方向施加约束力,并且可以降低构件的成本。 解决方案:在这种用于限制基底隔离作业中的水平力的方法中,在下基座2和上基座4上竖立的管状抗震板1形成在 现有建筑,并设置在基础隔离工作中建造的下层基础; 上基础构造在下基础的上位; 之后,将管状抗震板1从下基座2向上提升并竖立在上下基座之间; 随后,在管状耐震板1的内壁表面和上下基座的壁表面之间填充灌浆材料,使得它们可以集成在一起; 现有的建筑物在地震期间被限制在不能水平位移。 版权所有(C)2010,JPO&INPIT