会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明授权
    • Method and system for joining structures
    • US10934020B2
    • 2021-03-02
    • US15415172
    • 2017-01-25
    • The Boeing Company
    • Craig A. CharltonBranko LakicJerald A. HullChristopher A. GreerJustin H. Pratt
    • B23P21/00B64F5/10B23B49/00B23B35/00B64C1/10B64C1/06
    • A method includes making a first structure with a first plurality of pre-drilled holes at pre-defined locations, making a second structure with a second plurality of pre-drilled holes at pre-defined locations, making a third structure without pre-drilled full-size holes, measuring the location and orientation of the first and second plurality of pre-drilled holes in the first and second structures, determining the location of a third plurality of holes to be drilled in the third structure that correspond to first and second plurality of pre-drilled holes measured in the first and second structures, creating a program to drill the third plurality of holes in the third structure that align with the measured location and orientation of the first and second plurality of pre-drilled holes in the first and second structures based on the measure location and orientation of the first and second plurality of pre-drilled holes in the first and second structure, drilling the third plurality of holes in the third structure based on the program, positioning the third structure on the first and second structures such that the third plurality of holes in the third structure are aligned with the first and second plurality of pre-drilled holes in the first and second structures, and inserting fasteners through the third plurality of holes and the first and second plurality of predrilled holes that are aligned with the third plurality of holes to secure the second structure to the first structure using the third structure.
    • 9. 发明授权
    • Method and system for joining structures
    • US11370563B2
    • 2022-06-28
    • US17149980
    • 2021-01-15
    • The Boeing Company
    • Craig A. CharltonBranko LakicJerald A. HullChristopher A. GreerJustin H. Pratt
    • B64F5/10B23P21/00B23B49/00B23B35/00B64C1/10B64C1/06
    • A method includes making a first structure with a first plurality of pre-drilled holes at pre-defined locations, making a second structure with a second plurality of pre-drilled holes at pre-defined locations, making a third structure without pre-drilled full-size holes, measuring the location and orientation of the first and second plurality of pre-drilled holes in the first and second structures, determining the location of a third plurality of holes to be drilled in the third structure that correspond to first and second plurality of pre-drilled holes measured in the first and second structures, creating a program to drill the third plurality of holes in the third structure that align with the measured location and orientation of the first and second plurality of pre-drilled holes in the first and second structures based on the measure location and orientation of the first and second plurality of pre-drilled holes in the first and second structure, drilling the third plurality of holes in the third structure based on the program, positioning the third structure on the first and second structures such that the third plurality of holes in the third structure are aligned with the first and second plurality of pre-drilled holes in the first and second structures, and inserting fasteners through the third plurality of holes and the first and second plurality of predrilled holes that are aligned with the third plurality of holes to secure the second structure to the first structure using the third structure.
    • 10. 发明申请
    • METHOD AND SYSTEM FOR JOINING STRUCTURES
    • US20210130010A1
    • 2021-05-06
    • US17149980
    • 2021-01-15
    • The Boeing Company
    • Craig A. CharltonBranko LakicJerald A. HullChristopher A. GreerJustin H. Pratt
    • B64F5/10B23P21/00B23B49/00B23B35/00B64C1/10B64C1/06
    • A method includes making a first structure with a first plurality of pre-drilled holes at pre-defined locations, making a second structure with a second plurality of pre-drilled holes at pre-defined locations, making a third structure without pre-drilled full-size holes, measuring the location and orientation of the first and second plurality of pre-drilled holes in the first and second structures, determining the location of a third plurality of holes to be drilled in the third structure that correspond to first and second plurality of pre-drilled holes measured in the first and second structures, creating a program to drill the third plurality of holes in the third structure that align with the measured location and orientation of the first and second plurality of pre-drilled holes in the first and second structures based on the measure location and orientation of the first and second plurality of pre-drilled holes in the first and second structure, drilling the third plurality of holes in the third structure based on the program, positioning the third structure on the first and second structures such that the third plurality of holes in the third structure are aligned with the first and second plurality of pre-drilled holes in the first and second structures, and inserting fasteners through the third plurality of holes and the first and second plurality of predrilled holes that are aligned with the third plurality of holes to secure the second structure to the first structure using the third structure.