会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Method for installing cast-in-place steel base column and steel column
    • 用于安装铸钢基座钢柱和钢柱的方法
    • JP2003313862A
    • 2003-11-06
    • JP2002122303
    • 2002-04-24
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • KONO TAKAOWAKAI SHUICHIAOKI MASAMICHITAKEDA TSUTOMU
    • E02D5/34E02D7/00E02D13/04
    • PROBLEM TO BE SOLVED: To provide a method for installing a high strength cast-in-place steel base column and a steel column formable with a simple procedure and capable of performing a high vertical load support by avoiding an inconvenience pro duced by bleeding. SOLUTION: After bleeding water is produced beforehand by leaving the concrete placed at the tip or deeper of a steel column frame 3 built in an excavated hole 2 for a specified time, the steel column frame 3 is fixed. For example, primary concrete 4f and concrete 4r with retarding agent are placed, in order, under a position where the steel column frame 3 is built, and these concretes are left undisturbed for a specified time. Then, before the concrete with the retarding agent is cured, the secondary concrete 4s is placed at the steel column frame 3 portion to fix the frame. Though bleeding occurs also at a fixed portion, the influencing force thereof is small. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种用于安装高强度现浇钢基柱和钢柱的方法,其可以通过简单的程序形成,并且能够通过避免由垂直载荷引起的不便 流血的。 解决方案:通过将混凝土放置在内置于挖掘孔2中的钢柱架3的尖端或较深处预先生产出水,钢柱框架3固定。 例如,将具有阻燃剂的初级混凝土4f和混凝土4r按顺序放置在钢柱框架3构建的位置上,这些混凝土在一定时间内不受干扰。 然后,在具有阻滞剂的混凝土固化之前,将二次混凝土4s放置在钢柱架3部分以固定框架。 虽然在固定部分也发生渗血,但其影响力也很小。 版权所有(C)2004,JPO