会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Dismantlement method for structure
    • 结构异议方法
    • JP2014001519A
    • 2014-01-09
    • JP2012135930
    • 2012-06-15
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • ARAI SOSUKENISHIOKA HIROYUKINOGATA KOJI
    • E04G23/08
    • PROBLEM TO BE SOLVED: To efficiently dismantle a structure.SOLUTION: A beam-slab block body 77 consisting of a jump-out part 78 and an indoor part 79 is cut while achieving a weight balance so that its gravity center position G3 becomes the position of a hoisting attachment 113. Thus, the beam-slab block body 77 can be hoisted without the need for a reach balancer or the like to achieve a balance, for example. Particularly, the beam-slab block body 77 can be hoisted without the need for the reach balancer or the like to achieve a balance even when the hoisting attachment 113 of a crane 112 cannot reach the jump-out part 78 or etc. This results in more efficient dismantling work for a building 10 to be dismantled.
    • 要解决的问题:有效地拆卸结构。解决方案:在实现重量平衡的同时切割由跳出部分78和室内部分79组成的梁板块体77,使其重心位置G3成为位置 因此,例如,可以在不需要平衡器等的情况下,提升梁板坯体77。 特别是,即使在起重机112的起吊附件113不能到达跳出部78等的情况下,也可以不需要平衡器等来实现梁板坯块体77的平衡。因此, 更有效地拆除拆除10号楼的拆除工程。
    • 4. 发明专利
    • Dismantlement method for structure
    • 结构异议方法
    • JP2014001510A
    • 2014-01-09
    • JP2012135728
    • 2012-06-15
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • ARAI SOSUKENISHIOKA HIROYUKINOGATA KOJI
    • E04G23/08
    • PROBLEM TO BE SOLVED: To efficiently dismantle a structure.SOLUTION: Two cuts are formed in a slab 32 on an H-steel 30A as part of a beam 30, and impact is given to a removal part 29 between the two cuts by a hammer or the like to remove the removal part 29 so that the H-steel 30A is exposed. Then, the H-steel 30A exposed from an exposure site 27 is cut. Thus, as compared with the case that a breaker or the like is used for breaking off and removing the removal part 29, the removal part 29 is easily removed so that the H-steel 30A can be exposed, and dust and noises are suppressed. This results in more efficient dismantling work for a building 10 to be dismantled.
    • 要解决的问题:有效地拆卸结构。解决方案:在作为梁30的一部分的H钢30A上的板32中形成两个切口,并且通过锤子对两个切口之间的移除部分29进行冲击 以除去去除部29,使得H钢30A露出。 然后,从暴露部位27露出的H钢30A切断。 因此,与使用断路器等拆卸除去部29的情况相比,能够容易地除去除去部29,能够露出H钢30A,并且抑制灰尘和噪声。 这样可以更有效地拆除10号拆除工程。
    • 5. 发明专利
    • Vertical loading testing method of existing pile, and construction method of concrete reaction body
    • 现有桩的垂直加载试验方法和混凝土反应体系的构造方法
    • JP2014080768A
    • 2014-05-08
    • JP2012228523
    • 2012-10-16
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • ARAI SOSUKENISHIOKA HIROYUKIIWASHIMIZU TAKASHIIKEDA HIDEMIMAEDA TATSUHIKOSUGAWARA TOSHIAKI
    • E02D33/00
    • PROBLEM TO BE SOLVED: To provide a vertical loading testing method for testing a support performance of an existing pile of an existing building, such that a concrete reaction body for obtaining a reaction from the existing building is capable of presenting a sufficient reaction.SOLUTION: A vertical loading testing method includes the steps of: separating an existing pile and a foundation skeleton of an existing building; constructing a concrete reaction body connected to the existing building at an upper side of the existing pile; and measuring a support performance by applying a load to the existing pile through a jack installed in an upper end of the existing pile. When installing the concrete reaction body, an installation area is divided into two or more partial layer areas in a vertical direction. For each partial layer area, a management material age is determined which is the number of days required for achieving a predetermined strength from a date of installation through a curing term. A target date is determined commonly for all the partial layer areas and in accordance with the management material ages of the partial layer areas, the date of installation for each partial layer area is determined by inverse calculation from the target date.
    • 要解决的问题:提供一种用于测试现有建筑物的现有桩的支撑性能的垂直装载试验方法,使得用于从现有建筑物获得反应的具体反应体能够呈现足够的反应。解决方案: 一种垂直装载测试方法包括以下步骤:分离现有建筑物的现有桩和基础骨架; 构筑与现有建筑物相连的混凝土反应体; 并通过通过安装在现有桩的上端的千斤顶对现有桩施加载荷来测量支撑性能。 在安装混凝土反作用体时,安装区域在垂直方向上分为两个或更多个部分层区域。 对于每个部分层区域,确定管理材料年龄,其是从安装日期到固化期限之后达到预定强度所需的天数。 目标日期对于所有部分层面共同确定,并且根据部分层区域的管理材料年龄,每个部分层区域的安装日期由目标日期的反算出确定。
    • 6. 发明专利
    • Dismantlement method for structure
    • 结构异议方法
    • JP2014001511A
    • 2014-01-09
    • JP2012135729
    • 2012-06-15
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • ARAI SOSUKENISHIOKA HIROYUKINOGATA KOJI
    • E04G23/08
    • PROBLEM TO BE SOLVED: To efficiently dismantle a structure.SOLUTION: A beam 30 extending from a column 28 is cut so that its position distant from the axial center of the column 28 is a gravity center position in a plan view, and a steel pipe 28A provided on the outer periphery of the column 28 is also cut. Then, a wire 111 is loosened with the operation of a crane 112 applied onto a column-beam block body 50, so that bending stress is generated on the column 28 to fracture an inside concrete 28B. Thus, the column 28 can be easily cut without the need for fracturing the concrete 28B inside the column 28 while using a breaker for striking it at its lateral side, for example. This results in more efficient dismantling work for a building 10 to be dismantled.
    • 要解决的问题:有效地拆卸结构。解决方案:从柱28延伸的梁30被切割成远离柱28的轴向中心的位置是平面图中的重心位置,并且钢管 设置在柱28的外周上的图28A也被切断。 然后,通过施加在柱梁块体50上的起重机112的操作使导线111松动,使得在柱28上产生弯曲应力以破坏混凝土28B内部。 因此,可以容易地切割柱28,而不需要例如使用用于在其侧面打击的断路器来将柱28内的混凝土28B断裂。 这样可以更有效地拆除10号拆除工程。