会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • Workflow executing device, preview creating method
    • 工作流执行装置,预览创建方法
    • US20120096348A1
    • 2012-04-19
    • US13200342
    • 2011-09-23
    • Shoh NagamineHiroki OzakiHiroshi BabaMasateru KumagaiShinsuke Yanazume
    • Shoh NagamineHiroki OzakiHiroshi BabaMasateru KumagaiShinsuke Yanazume
    • G06F17/00
    • H04N1/00244H04N1/00222H04N1/0044H04N1/00498H04N2201/0089H04N2201/0093
    • A workflow executing device includes a workflow executing unit; a first extracting unit that extracts a first preview property including a first element constituting a first data item and first position information; a second extracting unit that extracts a second preview property including a second element constituting a second data item and a second position information item, the second data item being obtained as a result of processing the first data item; a preview property managing unit that saves preview properties; a preview property generating unit that inserts the second element that is the processing result into the first preview property in place of the first element that is the processing target, and generates a new second preview property by associating the first position information with the second element; and a preview creating unit that creates preview images based on preview properties.
    • 工作流执行装置包括工作流执行单元; 第一提取单元,其提取包括构成第一数据项的第一元素和第一位置信息的第一预览属性; 第二提取单元,其提取包括构成第二数据项的第二元素和第二位置信息项的第二预览属性,所述第二数据项是作为处理所述第一数据项的结果而获得的; 预览属性管理单元,用于保存预览属性; 预览属性生成单元,其将作为处理结果的第二元素代入第一预览属性代替作为处理对象的第一元素,并通过将第一位置信息与第二元素相关联来生成新的第二预览属性; 以及基于预览属性创建预览图像的预览创建单元。
    • 8. 发明申请
    • IMAGE PROCESSING APPARATUS FOR SHUTTING DOWN POWER SUPPLY IN SAFE
    • 用于切断电源的图像处理装置
    • US20110205573A1
    • 2011-08-25
    • US13029418
    • 2011-02-17
    • Shinsuke YANAZUMERie NakamuraYoshifumi KawaiMasateru Kumagai
    • Shinsuke YANAZUMERie NakamuraYoshifumi KawaiMasateru Kumagai
    • G06K15/02
    • G06K15/409G06F1/3246
    • In an image processing apparatus, a power control part shuts down power supply after a power shutdown condition is established. A prescript safe state transition part performs a prescript safe state transition process to shift previously set prescript parts to a predetermined safe state. A priority safe state transition part performs a priority safe state transition process to shift previously set priority parts to the safe state. A transition process control part causes the prescript safe state transition process to be executed before execution of the priority safe transition process, and causes the priority safe state transition process to be executed when a predetermined transition change condition is established in the prescript safe state transition process. The power control part shuts down the power supply after the completion of the prescript safe state transition process.
    • 在图像处理装置中,功率控制部在建立停电状态之后关闭电源。 指示安全状态转移部分执行指示安全状态转换处理,以将预先设定的指示部分移动到预定的安全状态。 优先安全状态转移部分执行优先安全状态转移处理以将先前设置的优先部分移动到安全状态。 转移过程控制部分在执行优先权安全转换过程之前执行规定的安全状态转换过程,并且当在规定的安全状态转换处理中建立预定的转变变化条件时,执行优先级安全状态转换处理 。 电源控制部分在完成安全状态转换过程完成后关闭电源。