会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • CONSTRUCTION METHOD FOR CONTINUOS UNDERGROUND WALL
    • JPH10183611A
    • 1998-07-14
    • JP35736496
    • 1996-12-26
    • TOKYO GAS CO LTDTAISEI CORP
    • TAKAGI SADATOKOMATSUBARA TORUTSUTSUMI YOICHITSUBONE YASUOYOSHIDA TAKEYOSHIIZEKI HIDEOAIHARA KOJISONOBE FUMIAKI
    • E02D5/20
    • PROBLEM TO BE SOLVED: To realize complete connection between preceding and subsequent elements, when the end faces of the preceding element are not vertical, by arranging a reinforcing bar cage with the shape of end portion coincided with a non-vertical end face of the excavated channel located close to the non-vertical end face of the channel. SOLUTION: A reinforced bar cage 4 with the end face deformed is shorter than the length of a non-vertical end face channel 1 and is constituted by forming the shape of end portion to a deformed end face 5 coincided with the shape of non-vertical end face channel 2 of the channel 1. In the case of construction work, the cage 4 is suspended and lowered to the inside of the channel 1 while separating the end faces 2 and 5 to a distance permitting no contact between them, then the cage 4 is moved in parallel and the end face 5 is moved close to the end face 2. Next, a rectangular reinforcing bar cage is suspended down to a space from which the cage 4 has been moved, and the preceding element A, cage 4 and rectangular reinforcing bar cage are connected together through joint members. Next, concrete is poured in the channel 1 and a continuos underground wall is formed. By doing this, the preceding and subsequent elements can be completely connected together in one united body even through the situation is so bad that previously no counter-measure was possible.
    • 3. 发明专利
    • BUILD UP METHOD, BUILD UP DEVICE AND BUILD UP JIG FOR REINFORCING CAGE
    • JPH10216878A
    • 1998-08-18
    • JP3269397
    • 1997-01-31
    • TAISEI CORPTOKYO GAS CO LTD
    • TSUBONE YASUOAIHARA KOJITONAMI SOSUKEOKUDA HIDEYUKITAKAGI SADATOKOMATSUBARA TORUTSUTSUMI YOICHI
    • E04C5/18B21F31/00
    • PROBLEM TO BE SOLVED: To provide a build up method, build up device and build up jig for a reinforcing cage which can improve the efficiency of build up work of the reinforcing cage, reduce the cost and restrain the build up site to the min. limit. SOLUTION: Posts 1 projecting arms 12 at plural steps preliminarily putting horizontal reinforcement 21 in the reinforcing cage, are stood on the peripheral surface of a tubular body so as to be rotatable while centering the axial line, and arranged at two lines along both surfaces of the outer shape of constructing scheduled reinforcing cage. The horizontal reinforcement 21 group is preliminarily put to each arm in the condition of mutually facing each arm 12 of the faced parts interposing the reinforcing cage. Reinforcement to shearing and vertical reinforcement groups are connected with the horizontal reinforcement group, and after manufacturing the reinforcing cage, the posts 1 are rotated to swingly shift the arms 12 to the outside of the reinforcing cage and the engagement of the reinforcing cage with the arms is released, and the reinforcing cage is hung upward with a hanging device. Further, the build up jig for the reinforcing cage is composed of a crossing clamp for holding the crossing part between the horizontal reinforcement and the vertical reinforcement in the reinforcing cage and a space holding clamp for holding both of the vertical reinforcements.