会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明公开
    • METHOD FOR ORDER RECEIPT PRODUCTION OF WIRE HARNESS AND ITS ORDER RECEIPT PRODUCTION SYSTEM
    • VERFAHREN ZUR BESTELLUNGSQUITTIERUNGSERSTELLUNG EINES KABELBAUMS UND BESTELLUNGSQUITTIERUNGSERSTELLUNGSSYSTEMDAFÜR
    • EP1463066A4
    • 2006-12-27
    • EP02778002
    • 2002-10-30
    • YAZAKI CORP
    • KAMATA TAKESHIKATSUMATA MAKOTOUSHIJIMA HITOSHISUZUKI SHIGEHARUSUGIMURA KEIGOYAGI KIYOSHI
    • H01B13/012
    • H01B13/012Y10T29/49117Y10T29/49169Y10T29/49174Y10T29/49194Y10T29/53209
    • An object of the present invention is to provide a wiring harness job-order production method and a wiring harness job-order production system, wherein a space for producing a wiring harness is reduced and the production efficiency of the wiring harness is improved. The wiring harness job-order production system 1 has a wiring harness assembling portion 15, an electric wire stock portion 13, and a parts stock portion 14. The wiring harness assembling portion 15 outputs wire amount data DT1 to the electric wire stock portion 13 when the wiring harness assembling portion 15 receives an order from a wiring harness ordering side 38. The wiring harness assembling portion 15 outputs parts amount data DT2 to the parts stock portion 14 when the wiring harness assembling portion 15 receives an order from the wiring harness ordering side 38. The electric wire stock portion 13 conveys a non-colored electric wire toward the wiring harness assembling portion 15. The parts stock portion 14 conveys non-colored parts toward the wiring harness assembling portion 15.
    • 一种线束的订单接收生产方法及其订单接收生产系统,其通过抑制工厂所需的空间来抑制生产线束的效率的降低。 线束订单收据制作系统1具有线束组装部15,线材库存部13和元件库存部14.线束组装部15根据来自线束订购更换侧38的订单,输出线量数据DT1 到线材备件部分13.在来自线束订单更换侧38的订单时,线束组件部分15将元件数量数据DT2输出到元件备品部分14.线材备品部分13将未上色的线材输送到线束 组件部分15.部件储备部分14将未着色的部件输送到线束组件部分15。
    • 10. 发明公开
    • CABLE PRODUCTION SYSTEM
    • 电缆生产系统
    • EP1557846A4
    • 2010-06-23
    • EP03809455
    • 2003-10-24
    • YAZAKI CORP
    • KAMATA TAKESHISUZUKI SHIGEHARUSUGIMURA KEIGOYAGI KIYOSHI
    • G06Q50/00G06Q50/04H01B13/012H01B13/34H01B13/00
    • H01B13/345H01B13/012H01B13/34
    • An electric wire production system is provided, by which system a cost of a product which uses electric wires, such as a wiring harness, can be prevented from increasing and resource saving can be achieved. The electric wire production system 1 includes an input department 9, production control department 10, production department 11 and coloring/cutting department 12. An electric production data D indicating a product number, mark, color and length per a shape of necessary electric wire are inputted to the input department 9. The input department 9 forwards the electric wire production data D to the production control department 10. The production control department 10 forwards a first production data, indicating a length per a product number of the electric wire to be produced, to the production department 11. The production control department 10 forwards a second production data, indicating a product number, a shape of a mark and a length per a color of the mark to be produced, to the coloring/cutting department 12. The production department 11 produces an electric wire 3, an outer surface 5a of which is monochrome. The coloring/cutting department 12 marks the outer surface 5a of the electric wire 3 produced by the production department 11 and cuts the electric wire 3.