    • 1. 发明专利
    • TRANSFERRING METHOD OF RAILLOADING LINE ON GROUND TO UNDERGROUND SECTION
    • JPH11336471A
    • 1999-12-07
    • JP14103698
    • 1998-05-22
    • TODA CONSTRUCTION
    • SHISEKI AKIOKUBOTA TAKAAKI
    • E02D5/20E21D9/04
    • PROBLEM TO BE SOLVED: To shorten the term of works and reduce the term of works by maximally conducting ground operation in an underground section while providing a transferring method of a railloading line on a ground to the underground section. SOLUTION: In the transferring method of the radilloading line installed on the ground to the underground section, shield tunnels 4 are built at the specified places of the lower ground of the above-mentioned railloading line. A plurality of column members 5 are disposed in upright towards a ground surface to the outsides of both side faces in the longitudinal direction of the above-mentioned railloading line from the insides of the shield tunnels 4. Girder members are bridged among the column members 5, the track facility of the above- mentioned railloading line are borne to the above-mentioned girder members, and a space surrounded by the above-mentioned girder members and the column members 5 is excavated up to specified depth while the above-mentioned column members 5 are used for the combination of soldier-pile walls. A tunnel building frame 3 having a tunnel space in the longitudinal direction of the above-mentioned railloading line is constructed into the excavated space, and the track facility 2 is anew constructed into the tunnel space of the tunnel building frame 3. The track facility 2 borne to the above-mentioned column members 5 is removed.
    • 4. 发明专利
    • CONSOLIDATED ACCELERATION METHOD FOR COHESIVE SOIL GROUND
    • JPH03281817A
    • 1991-12-12
    • JP8091690
    • 1990-03-30
    • TODA CONSTRUCTION
    • YAMADA TOMOUMITADA KOJITANIGUCHI TORUNAKAGAWA MASAHIROTACHIKAWA YUJIOCHIAI MASAMIKUBOTA TAKAAKI
    • E02D3/10
    • PURPOSE:To accelerate the consolidation of a cohesive soil ground by piercing the cohesive soil ground with a cohesive soil layer to form latticed drain ditches in plane reaching a lower water permeable layer, and draining underground water forcedly from the drain ditches to lower the ground-water level. CONSTITUTION:A cohesive soil ground (n) is pierced with a cohesive soil layer (n1) to reach a lower water permeable layer (n2), and latticed drain ditches 1 are formed in succession in plane. Underground water is forcedly drained by underwater pumps P and P. etc. from the drain ditches 1, and the ground-water level W is lowered to the consolidated phenomenon of the cohesive soil layer (n1) is accelerated. In addition, the drain ditches 1 are constituted of latticed thin type ditches 1a, circular holes 1c, 1b and 1b excavated in the intersection parts and midst parts, and the drain ditches 1 are filled with water permeable materials. The ultimate outside drain ditches 1A and 1A are excavated deeper than another drain ditches 1, and impermeable members 7 and 7 are provided over the full lengths of them. In addition, condenser wells (m) are excavated in the outside of a section of the cohesive soil ground (n) surrounded by the drain ditches 1, and the underground water pumped from the cohesive soil ground (n) is returned to normal circulation.