会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • METHODS OF COMPLETING A WELL AND APPARATUS THEREFOR
    • 完成井的方法和装置
    • WO2017176312A1
    • 2017-10-12
    • PCT/US2016/059476
    • 2016-10-28
    • THRU TUBING SOLUTIONS, INC,
    • WATSON, Brock, W.FERGUSON, Andrew, M.SCHULTZ, Roger, L.FUNKHOUSER, Gary, P.ROBERTSON, Jenna, N.
    • E21B33/13E21B33/12E21B43/11
    • A system for use with a well can include a perforating assembly with at least one perforator, the perforating assembly conveyed through a wellbore with fluid flow through the wellbore, and plugging devices spaced apart from the perforating assembly in the wellbore, the plugging devices conveyed through the wellbore with the fluid flow. A method of deploying plugging devices in a wellbore can include conveying a perforating assembly including a dispensing tool through the wellbore, the dispensing tool including a container, and then releasing the plugging devices from the container into the wellbore at a downhole location. Another method of deploying plugging devices in a wellbore can include conveying the plugging devices through the wellbore with fluid flow through the wellbore, and conveying a perforating assembly through the wellbore while the plugging devices are being conveyed through the wellbore.
    • 与井一起使用的系统可包括具有至少一个穿孔器的穿孔组件,穿过穿过具有流体流过井筒的井筒的输送组件,以及与穿孔组件隔开的堵塞装置, 井筒中,堵塞装置通过井筒与流体流动一起输送。 一种将封堵装置布置在井眼中的方法可以包括:将包括分配工具的穿孔组件传送通过井筒,分配工具包括容器,然后在井下位置将封堵装置从容器释放到井筒中。 在井筒中布置堵塞装置的另一种方法可以包括:当堵塞装置通过井筒输送时,使堵塞装置通过井筒输送通过井筒的流体,并且穿过井筒输送穿孔组件。
    • 6. 发明申请
    • WELL COMPLETION
    • 好完成
    • WO2016081263A1
    • 2016-05-26
    • PCT/US2015/060280
    • 2015-11-12
    • THRU TUBING SOLUTIONS, INC.
    • FERGUSON, Andrew, M.LOVING, Stanley, W.SCHULTZ, Roger, L.BRITTON, Mark, S.WATSON, Brock, W.
    • E21B43/16E21B43/26E21B23/00
    • E21B43/261E21B33/138E21B43/14
    • A well completion method can comprise, in a single trip into a wellbore, the following steps being performed for each of multiple zones penetrated by the wellbore: abrasively perforating the zone with a tubing deployed perforating assembly, fracturing the perforated zone with flow from surface via a well annulus, and then plugging the fractured zone with a removable plug substance, the perforating assembly displacing in the wellbore while the fractured zone is being plugged. Another well completion method can comprise, in a single trip into a wellbore, the following steps being performed for each of multiple zones penetrated by the wellbore: perforating the zone using an abrasive perforator, then displacing the perforator in the wellbore away from the earth's surface, then fracturing the zone, and plugging the fractured zone with a flowable plug substance.
    • 完井方法可以包括在进入井眼的单次行程中,对由井眼穿透的多个区域中的每一个进行以下步骤:用配置有穿孔组件的管道对该区域进行磨损性穿孔, 井环,然后用可移除的塞子物质堵塞断裂区域,穿孔组件在断裂区域被堵塞的同时在井筒中移位。 另一个完井方法可以包括在单次进入井筒之后,对由井筒穿透的多个区域中的每一个进行以下步骤:使用磨料穿孔器对该区域进行穿孔,然后将井筒中的穿孔器移离地球表面 ,然后压裂区域,并用可流动的塞子物质堵塞断裂区域。
    • 7. 发明申请
    • WELL TOOL WITH INDEXING DEVICE
    • 具有索引设备的工具
    • WO2016068882A1
    • 2016-05-06
    • PCT/US2014/062651
    • 2014-10-28
    • THRU TUBING SOLUTIONS, INC.
    • WATSON, Brock, W.
    • E21B17/00E21B23/00
    • E21B33/1291E21B23/006
    • A well tool can include an operator device with an operator profile and at least two routes, and an indexing device with a cam and a cam follower including a structure. The structure engages the routes in succession in response to relative displacement between the operator profile and cam. A method can include causing relative displacement between an operator device and an indexing device in one direction, thereby causing a structure to disengage from one route of the operator device and displace an initial distance between two routes in response to engagement between the cam follower and a cam, and causing relative displacement between the operator and indexing devices in an opposite direction, thereby causing the structure to displace a remaining distance between the routes in response to engagement between the cam follower and an operator profile of the operator device, and to displace along the second route.
    • 良好的工具可以包括具有操作者轮廓和至少两个路线的操作装置,以及具有凸轮和凸轮从动件的分度装置,所述凸轮跟随器包括结构。 响应于操作者轮廓和凸轮之间的相对位移,结构连续地接合路线。 一种方法可以包括在一个方向上引起操作者装置和分度装置之间的相对位移,从而导致结构与操作装置的一个路径脱离,并响应于凸轮从动件和一个 凸轮,并且在相反方向上引起操作者和分度装置之间的相对位移,从而导致结构响应于凸轮从动件和操作者装置的操作者轮廓之间的接合而移动路线之间的剩余距离,并且沿着 第二条路线。