会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明申请
    • BUCK-BOOST CONVERTER WITH BUCK-BOOST TRANSITION SWITCHING CONTROL
    • BUCK-BOOST转换器与BUCK-BOOST过渡切换控制
    • WO2014127190A1
    • 2014-08-21
    • PCT/US2014/016369
    • 2014-02-14
    • TEXAS INSTRUMENTS INCORPORATEDTEXAS INSTRUMENTS JAPAN LIMITED
    • IVANOV, Vadim, V.PRAKASHI, Rahul
    • H02M3/158
    • H02M3/1582
    • A buck-boost regulation methodology operable, in one embodiment, with a single inductor (L), four-switch (S1 -S4) buck-boost regulator configured for discontinuous conduction mode (DCM). Buck-boost transition switching control by controller (110) IS operable when inductor charge time exceeds a max charge time, and inductor discharge time exceeds a max discharge time, and includes: (a) during charge transition cycles, at the end of the max charge time, if l L is less than a predetermined peak current I L _MAX, switching S2 on (grounding the output side of the inductor) and S4 off, causing lL to increase (a rapid S1 S2 charging current ramp), until l L reaches I L _MAX, and (b) during discharge transition cycles, at the end of the max charge time, if l L is greater than zero, switching S1 off and S3 on (grounding the input side of the inductor), causing l L to increase (a rapid S3S4 l L discharging current ramp), until l L reaches zero.
    • 在一个实施例中,降压 - 升压调节方法可用单个电感器(L),四开关(S1 -S4)降压 - 升压稳压器配置用于不连续导通模式(DCM)。 当电感器充电时间超过最大充电时间时,控制器(110)的降压 - 升压转换开关控制可操作,并且电感器放电时间超过最大放电时间,并且包括:(a)在充电转换周期期间,在最大值 充电时间,如果lL小于预定的峰值电流IL_MAX,则切换S2(使电感器的输出侧接地)和S4断开,导致lL增加(快速S1 S2充电电流斜坡),直到lL达到IL_MAX,以及 (b)在放电转换周期期间,在最大充电时间结束时,如果lL大于零,则切换S1和S3(接地电感器输入端),导致lL增加(快速S3S4 lL放电 电流斜坡),直到lL达到零。