    • Countermeasure construction method of earthquake time horizontal force in base isolation work
    • 基础隔离工作中地震时间水平力的相对测量方法
    • JP2007085021A
    • 2007-04-05
    • JP2005272259
    • 2005-09-20
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHIODAJIMA ATSUSHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a countermeasure construction method for securing aseismatic safety of an existing structure in base isolation work by restricting the existing structure by sharing earthquake time horizontal force and vertical force in the base isolation work of the existing structure. SOLUTION: A bearing wall 5 is constructed between an existing foundation 3 of the existing structure and an existing foundation beam 4 on its foundation. After curing the bearing wall 5, a base isolation device 7 is arranged between the existing foundation beam 4 and a new foundation separately constructed in a just under position of the existing foundation 3 or the existing foundation beam 4. After completing installation work of the base isolation device 7, the bearing wall 5 is disassembled. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种通过在现有结构的基础隔离工作中共享地震时间水平力和垂直力来限制现有结构来确保现有结构在基础隔离工作中的抗震安全性的对策施工方法。 解决方案:在现有结构的现有基础3和其基础上的现有基础梁4之间构造一个轴承壁5。 在固定轴承壁5之后,在现有的基础梁4和分别构造在现有基座3或现有的基础梁4的正下方的新基座之间布置有基部隔离装置7.在完成基座的安装工作之后 隔离装置7,分解轴承壁5。 版权所有(C)2007,JPO&INPIT
    • 3. 发明专利
    • Method of reconstructing under portion of apparatus while operating the apparatus
    • 在操作设备时重新设计的方法
    • JP2007070874A
    • 2007-03-22
    • JP2005258691
    • 2005-09-07
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHISAITO YUICHIKAMIURA NAOKIARAI MITSUNORI
    • E04G23/06E02D27/08E02D27/34
    • PROBLEM TO BE SOLVED: To provide a method of reconstructing the under portion of an apparatus while operating it in which the reconstruction of the under portion of concrete floor on which the very heavy apparatus is installed is performed while safely and surely operating it without suspending the apparatus from a ceiling portion. SOLUTION: This method comprises a step of dismantling skeletons 5 such as floor concrete around the apparatus 3 and excavating the ground to a predetermined depth, a step of depositing a foundation concrete 6 on the bottom face of the excavated portion and installing temporary receiving materials such as steel columns on the foundation concrete 6, a step of transferring the support of the apparatus 3 to the temporary receiving material 7 by joining a base member 2 supporting the apparatus 3 to the temporary receiving material 7, a step of excavating the under portion 4 of the apparatus 3 and performing reconstruction by constructing newly installed skeletons such as base isolation members and foundations at the excavated portion or reinforcing an existing foundation, and a step of removing the temporary receiving material 7 and the foundation concrete 6 after curing. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种在安装和确定操作的同时执行装置的重新装置的方法,其中在其中安装重型装置的混凝土地板的下部的重建被执行 而不会使设备从天花板部分悬挂下来。 解决方案:该方法包括将设备3周围的地板混凝土等骨架5拆除到预定深度的步骤,将基础混凝土6堆放在挖掘部的底面上并安装临时 在基础混凝土6上接收诸如钢柱的材料,通过将支撑设备3的基座构件2接合到临时接收材料7而将设备3的支撑件转移到临时接收材料7的步骤, 在装置3的下部4处,并且通过在挖掘部分处构造诸如基础隔离构件和基座的新安装的骨架或加强现有的基础来进行重建,以及在固化后移除临时接收材料7和基础混凝土6的步骤。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Base isolation construction method for existing building
    • 现有建筑的基础隔离施工方法
    • JP2007070844A
    • 2007-03-22
    • JP2005257365
    • 2005-09-06
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHISAITO YUICHIODAJIMA ATSUSHI
    • E04G23/02E04G23/08
    • PROBLEM TO BE SOLVED: To provide a base isolation construction method for an existing building by cutting off a column or a base by a predetermined height and installing a base isolation device at the cut portion.
      SOLUTION: The upper end part of a temporary receiving jack disposed around the column or the base on which the base isolation device is installed is abutted on a beam on a right above floor positioned right above the jack. An axial force supported by the column or the base on which the base isolation device is installed is supported by the temporary receiving jack by using a reaction force from columns on upper floors more than the right above floor through a diagonal support joining the generally right above porion of the temporary receiving jack on the right above floor beam and a column-beam joining part on the upper side of the just above floor column positioned right above the column or the base. The column or the base is cut off by a predetermined height, and the base isolation device is installed at the cut portion.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了通过将塔或基座切割预定高度来为现有建筑物提供基础隔离施工方法,并且在切割部分安装基座隔离装置。

      解决方案:设置在基座隔离装置的基座或基座周围的临时接收插座的上端部抵接在位于插座正上方的地板的右上方的梁上。 由安装基座隔离装置的支柱或基座支撑的轴向力由临时接收千斤顶通过使用来自位于地板右上方的上层楼层上的列的反作用力通过大致正上方的对角支撑支撑 位于地板梁上方的临时接收千斤顶的孔和位于立柱或基座正上方的正上方的上侧的柱梁接合部分。 柱或基座被切断预定的高度,基部隔离装置安装在切割部分。 版权所有(C)2007,JPO&INPIT

    • 5. 发明专利
    • Technique for reforming and constructing underfloor portion of hanging body of existing structure
    • 改造和建造现有结构体系的下放部分的技术
    • JP2007063903A
    • 2007-03-15
    • JP2005253353
    • 2005-09-01
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHISAITO YUICHIARAI MITSUNORIKOSAKA NORIONISHIMURA TAKUYATAYA YUJIODAJIMA ATSUSHI
    • E04G23/06E04G23/02
    • PROBLEM TO BE SOLVED: To provide a technique for excavating an underfloor portion of a hanging body of an existing structure having the hanging body under a ground in a structurally stable condition and reforming and constructing a new underground body without leaving the site. SOLUTION: The technique comprises a step of constructing a bordering wall 2 on the outer periphery of the hanging body 1 of the existing structure 10 and primarily excavating a ground between the bordering wall 2 and the hanging body 1 to the extent that a foundation 4 of the hanging body 1 is exposed, a step of installing a pile body 5 in an excavation site to support the foundation 4 of the hanging body 1, constructing a concrete retaining wall 6 to integrate the hanging body 1, the pile body 5 and the bordering wall 2 together, and shifting the support of the hanging body 1 to that of the pile body 5 and the bordering wall 2, and a step of secondarily excavating the ground up to a requires depth thereafter and reforming and constructing the new underground structure in the excavation site. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种技术,用于在结构稳定的条件下,将具有悬挂体的现有结构的悬挂体的底部底部挖掘并重新构建新的地下体而不离开现场。 解决方案:该技术包括在现有结构10的悬挂体1的外周上构造边界壁2的步骤,并且主要在边界壁2和悬挂体1之间挖掘地面, 悬挂体1的基座4露出,将桩体5安装在挖掘部位的步骤,以支撑悬挂体1的基座4,构成将悬挂体1,桩体5 并且接合壁2在一起,并且将悬挂体1的支撑件移动到桩体5和边界壁2的支撑件,并且此后将地面二次挖掘到需要深度的步骤,并重新构建新的地下 挖掘现场的结构。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Technique for transmitting supporting reaction of additional wall
    • 用于发送附加壁支持反应的技术
    • JP2007063853A
    • 2007-03-15
    • JP2005251523
    • 2005-08-31
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHIODAJIMA ATSUSHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a countermeasure technique for safely and reliably transmitting supporting reaction to upper structures during work for the base isolation of a structure when installing a temporarily supporting jack or a base isolation device on a position of bias from a column to support the vertical load of the upper structures.
      SOLUTION: In the supporting reaction transmitting technique, the temporarily supporting jack 4 is installed on the position of bias from the column, and when shifting the vertical load of the upper structures 6B, 7B if the upper structures 6A, 7A right over the temporarily supporting jack cannot support the axial force of the temporarily supporting jack, an additional wall is provided on an upstairs body right over the jack to transmit the supporting reaction of the temporarily supporting jack to the upper structures and the column with the assistance of the additional wall.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种对策技术,用于在工作期间安全可靠地将支撑反应传递到结构的基部隔离,当将临时支撑的千斤顶或基座隔离装置安置在偏置的位置时 柱支撑上部结构的垂直载荷。 解决方案:在支撑反应传输技术中,临时支撑千斤顶4安装在从塔的偏压位置,并且当上部结构6A,7A正好移动时移动上部结构6B,7B的垂直载荷 临时支撑千斤顶不能支撑临时支撑千斤顶的轴向力,附近的壁设置在位于千斤顶上方的楼上的身体上,以将临时支撑的千斤顶的支撑反作用于上述结构和塔的支撑反作用力 额外的墙。 版权所有(C)2007,JPO&INPIT
    • 9. 发明专利
    • Technique for reforming and constructing underfloor portion around column leg portion of existing structure
    • 在现有结构的柱状部分改造和构造底层部分的技术
    • JP2007063911A
    • 2007-03-15
    • JP2005253582
    • 2005-09-01
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHISAITO YUICHIARAI MITSUNORI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a technique for constructing a new beam and a new slab with high quality reliably integrated with an existing floor even in work for reinforcement at the underfloor side and performing safe reforming work such as base isolation or earthquake-proof reinforcement for an underfloor portion while keeping an overfloor portion around a column leg portion of an existing structure in an usable condition. SOLUTION: The technique comprises a step of excavating the underfloor portion 8, a step of assembling a formwork in the underfloor portion 8, filling concrete in the formwork to construct the new beam 1 integrated with an existing floor 3 with no gap, curing the new beam 1 until developing its predetermined strength, and then removing the formwork therefrom, a step of assembling a formwork in a position adjacent to the new beam 1, and filling concrete in the formwork to construct the new slab 2 integrated with the existing floor 3 and the new beam 1 with no gap, and a step of curing the new slab 2 until developing its predetermined strength, removing the formwork therefrom, and performing reforming work such as base isolation or earthquake-proof reinforcement for the underfloor portion 8. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于构造新的梁和新的具有高质量可靠地与现有地板一体化的新的板坯的技术,甚至在地板下方的加强作业中进行基础隔离或地震的安全改造工作 同时在现有结构的柱腿部分周围保持可使用状态的地板部分。 解决方案:该技术包括挖掘底板部分8的步骤,在地板下部分8中组装模板的步骤,在模板中填充混凝土以构造与现有地板3一体化而没有间隙的新梁1, 固化新梁1直到发展其预定的强度,然后从其中移除模板,将模板组装在与新梁1相邻的位置的步骤,并将模具中的混凝土填充以构造与现有的 地板3和没有间隙的新梁1,以及固化新板坯2直到达到预定强度的步骤,从其中移除模板,并对地板下部分8进行诸如基础隔离或抗震加固的重整工作。 版权所有(C)2007,JPO&INPIT
    • 10. 发明专利
    • Base isolation device installing method and its device
    • 基座隔离装置安装方法及其装置
    • JP2007063900A
    • 2007-03-15
    • JP2005253278
    • 2005-09-01
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YOKOMIZO KATSUYUKIKANO MAMORUHIRAO KENICHIARAI MITSUNORIKOSAKA NORIONISHIMURA TAKUYA
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a method of installing a base isolation device between an upper body and a lower body when reforming an existing building for base isolation or replacing the base isolation device.
      SOLUTION: On the side of the lower body, a frame is assembled so that the height of the upper end of a steel ball to be arranged later on a steel plate is almost equal to that of the upper face of the lower body. On the frame, the steel plate is arranged continuously with the upper face of the lower body in the approximately horizontal direction. The steel ball is arranged on the steel plate, and the base isolation device is placed on the steel ball to slide until inserted between the upper body and the lower body. An epoxy resin is filled in a gap between the upper side flange of the base isolation device and the upper body and in a gap between the lower side flange and the lower body to fix the base isolation device.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种在重建现有建筑物以进行基础隔离或更换基础隔离装置时,在上部主体和下部主体之间安装基座隔离装置的方法。 解决方案:在下体的一侧,组装框架,使得稍后设置在钢板上的钢球的上端的高度几乎等于下体的上表面的高度 。 在框架上,钢板与下体的上表面在大致水平方向上连续配置。 钢球布置在钢板上,基座隔离装置放置在钢球上,以滑动直到插入上身和下体之间。 环氧树脂填充在基体隔离装置的上侧凸缘与上体之间的间隙中,并且在下侧凸缘和下体之间的间隙中填充以固定基部隔离装置。 版权所有(C)2007,JPO&INPIT