会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Overhead traveling crane
    • OVERHEAD行驶起重机
    • JP2005132557A
    • 2005-05-26
    • JP2003369915
    • 2003-10-30
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • KIKUCHI KIMIOMORITA MASASHIMITSUEDA MAKOTOSHIMIZU KENJI
    • B66C17/00B66C9/14
    • PROBLEM TO BE SOLVED: To enable lifting operation under the entire area of a base roof by minimized number of overhead traveling cranes when the base roof covering a building such as temples, shrines, and towers is constructed and repair work is performed under the raw roof.
      SOLUTION: In this overhead traveling crane, a girder 1 formed in a roughly chevron shape in side view which is tilted so that its center part is positioned higher than its both parts and a plurality of parallel traveling rails orthogonal to the girder are installed on the underside of the raw roof B. A traveling device 3 for horizontally moving the girder along the traveling rails and a trolley 4 with a hoist running along the girder are installed on the girder.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:当建造覆盖建筑物如寺庙,神社和塔的基座屋顶时,通过最小数量的桥式起重机在底座的整个区域上的升降作业,并进行维修工作 原始屋顶。 解决方案:在这种架空行驶起重机中,以侧视图形成为大致人字形的梁1,其中心部分位于高于其两个部分的位置上,并且多个平行的行进轨道与梁连接, 安装在原始屋顶B的下侧。用于沿着行进轨道水平移动梁的行进装置3和沿着大梁运行的起重机的手推车4安装在该大梁上。 版权所有(C)2005,JPO&NCIPI
    • 4. 发明专利
    • Reconstruction method of structure
    • 结构重建方法
    • JP2009174281A
    • 2009-08-06
    • JP2008016956
    • 2008-01-28
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • MIYAMOTO NAOKISHIMANO YUKIHIROSHIMIZU KENJISENOKUCHI KOJI
    • E04G23/02E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To make construction in a state that adverse effects to the surrounding can hardly be caused hardly restricted by a structure of a new overground structure, and to allow reconstruction work to be efficiently carried out.
      SOLUTION: A reconstruction method of a structure is for replacing an existing underground structure A1 with a new underground structure B1 by a top-down construction method. A plurality of piles 1a are integrally driven under an existing bottom plate 3 and made resistant to extraction against water pressure acting on the existing bottom plate 3. Upper parts of the plurality of the piles 1a and framed-stud permanent substructual columns 1 are made to be integrated with one another, and a vertical support 2 is installed between the existing bottom plate 3 and the vicinity of the floor A1a of an existing first basement to resist the water pressure. The first basement of an existing overground demolition residue G is removed while demolishing the floor A2a of an existing first floor, and the vertical support 2 is extensively installed between the existing bottom plate 3 and the floor B2a of a new first floor by adding a new support to the existing support accompanied by the construction of the floor B2a of the new first floor of a new overground structure B2. Thereafter, the existing underground structure A1 deeper than the floor A1a of the existing first basement is replaced by the new underground structure B1.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:在几乎不会受到新的地上结构的结构的限制的情况下,难以引起对周围的不利影响的施工,并且能够有效地进行重建工作。 解决方案:一种结构的重建方法是通过自上而下的施工方法用新的地下结构B1来代替现有的地下结构A1。 多个桩1a在现有的底板3的下方一体地驱动,并且能够抵抗作用在现有底板3上的水压而被提升。多个桩1a和框架螺柱永久子柱1的上部制成 彼此集成,并且现有的底板3和现有的第一基底的地板A1a附近之间安装有垂直支撑件2以抵抗水压。 拆除现有地下室拆除残渣G的第一个地下室,同时拆除现有一楼的地板A2a,将垂直支撑2广泛地安装在现有的底板3与新一楼的地板B2a之间, 支持现有的支持,同时建设新的地上结构B2的新一楼的地板B2a。 此后,现有的地下建筑物A1比现有的第一地下室A1a更靠近地下结构B1。 版权所有(C)2009,JPO&INPIT
    • 5. 发明专利
    • Two-step earth retaining wall and its construction method
    • 两步接地墙及其施工方法
    • JP2007162266A
    • 2007-06-28
    • JP2005357607
    • 2005-12-12
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SUGAWARA TOSHIAKIAOKI MASAMICHISATO EIJIKONO TAKAOSHIMIZU KENJIOKABASHI MINORU
    • E02D17/04E02D29/02
    • PROBLEM TO BE SOLVED: To provide a two-step earth retaining wall which enables the shortening of a construction period and reduction in cost by enabling the smooth progress of excavation work because timbering such as a ground anchor is not required during the internal excavation of an inside earth retaining wall, and a construction method for the two-step earth retaining wall.
      SOLUTION: In this two-step earth retaining wall, a connecting material 4 makes an outside earth retaining wall 1 connected to the upper end of the inside earth retaining wall 2 which is constructed via a stepped excavation section 3 inside the outside earth retaining wall 1. The internal ground of the outside earth retaining wall 1 is excavated up to an upper-end level of the inside earth retaining wall 2, and a vertical intermediate section of the outside earth retaining wall 1 and the upper end of the inside earth retaining wall 2 are connected to each other by means of the connecting material 4. After that, the internal ground of the inside earth retaining wall 2 is excavated for the construction of the two-step earth retaining wall.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种两步式土挡土墙,能够缩短施工周期,降低成本,使挖掘工作顺利进行,因为在内部不需要诸如地锚的木材 内侧土挡土墙的开挖及两步式土挡墙的施工方法。 解决方案:在这个两步式的挡土墙中,连接材料4形成一个外接土挡土墙1,它连接到内侧土挡土墙2的上端,该内侧土挡土墙是通过外侧土层内的阶梯式挖掘段3构造的 外墙土挡土墙1的内部地面被挖掘到内侧土挡土墙2的上端,外侧土挡土墙1的垂直中间部和内侧的上端 接地挡土墙2通过连接材料4彼此连接。之后,挖出内侧土挡土墙2的内部地面,以构造两级土挡土墙。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Rebuilding method
    • 改造方法
    • JP2008255645A
    • 2008-10-23
    • JP2007098580
    • 2007-04-04
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • NAGANO KOICHISHIMIZU KENJI
    • E02D29/045E04G23/06E04H9/02E21D13/00
    • PROBLEM TO BE SOLVED: To economically perform the reconstruction of a base-isolated building by rapid construction.
      SOLUTION: In this rebuilding method, an existing building B0 equipped with an underground structure section D0 is demolished, and a new base-isolated building is constructed thereon. A foundation section 7 is formed in a state in which a batholith section 1 and an underground exterior wall 2 of the underground structure section D0 are left and in which a lower end of a temporary steel column 8a for being erected in the underground structure section D0 can be supported on the batholith section 1, along with the demolition of the underground structure section D0; the temporary steel column 8a is erected on the foundation section 7; the temporary steel column 8a is erected on the foundation section 7; a floor section 9 of the new base-isolated building is formed at the upper end of the temporary steel column 8a via a base-isolating device M; and respective structure sections of the new base-isolated building are concurrently constructed above and below the floor section 9, respectively.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:通过快速建设经济地实施基地隔离建筑物的重建。

      解决方案:在这种重建方法中,拆除了一座装有地下结构段D0的现有建筑物B0,并在其上构建了一个新的基地隔离建筑物。 基础部分7形成在地下结构部分D0的地层部分1和地下外壁2留下的状态下,并且其中竖立在地下结构部分D0中的临时钢柱8a的下端 可以支撑在地下部分1,同时拆除地下结构部分D0; 临时钢柱8a竖立在基础部分7上; 临时钢柱8a竖立在基础部分7上; 通过隔离隔离装置M,在临时钢柱8a的上端部形成新的基底隔离建筑物的底板部9; 并且新的基础隔离建筑物的各个结构部分分别同时构造在地板部分9的上方和下方。 版权所有(C)2009,JPO&INPIT