    • 3. 发明专利
    • Construction method for rising part, and its structure
    • 上升部分的构造方法及其结构
    • JP2005054405A
    • 2005-03-03
    • JP2003284956
    • 2003-08-01
    • Asahi Kasei Construction Materials Co LtdTakenaka Komuten Co Ltd旭化成建材株式会社株式会社竹中工務店
    • SHIMIZU RYOHEIYAMAMOTO HIROYUKIKONDO YOSUKEYOSHIHARA SHINYAYAMAZAKI TADASHIKABEFUSA TADASHIONISHI TAKASHITACHIKAWA JOJIYAMAGUCHI TADASHIOKINO NOBORU
    • E02D27/00
    • PROBLEM TO BE SOLVED: To provide a construction method for a rising block dispensing with the installation of a form for placing the rising block and not only installing the rising block with accuracy but also shortening time required for construction to allow simple and easy installation with few construction man-hours.
      SOLUTION: This construction method combines a block fixing process of fixing an anchor bolt 3 to a floor slab 2, adjusting the position of a level hardware 4 to a prescribed height to mount it to the lower part of the anchor bolt, allowing the anchor bolt 3 to penetrate from a joint part 1a or an intermediate hole part 1b of a block end to dispose the block 1, supporting the block lower face by the level hardware 4 to install the block 1, and fixing the block 1 by providing a hold-down hardware 5 at an anchor bolt projecting part 3a projected from the block upper face; and a grout filling process of injecting a grout material 6 from the joint part 1a or the intermediate hole part 1b to fill the grout material 6 between the floor slab 2 and the block 1.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种用于安装上升块的形式的上升块分配的施工方法,而不仅仅是准确地安装上升块,而且缩短施工所需的时间以允许简单和容易 安装施工时间少。 解决方案:该结构方法结合了将地脚螺栓3固定在地板2上的块固定过程,将水平硬件4的位置调整到规定的高度以将其安装在锚定螺栓的下部,从而允许 锚栓3从块端部的接合部分1a或中间孔部分1b穿透以设置块体1,通过水平硬件4支撑块下表面以安装块体1,并且通过提供块体1来固定块体1 在从块上表面突出的锚定螺栓突出部分3a处的压紧五金件5; 以及从接合部1a或中间孔部1b注入浆料6的灌浆填充处理,以填充落地板2和块体1之间的灌浆材料6.版权所有(C)2005,JPO&NCIPI
    • 6. 发明专利
    • METHOD FOR CONSTRUCTING RETAINING WALL
    • JPH02132226A
    • 1990-05-21
    • JP28651688
    • 1988-11-11
    • TAKENAKA KOMUTEN CO
    • MATSUI OSAMUYAMAGUCHI TADASHIKOJIMA MASAAKI
    • E02D17/04
    • PURPOSE:To aim at the security of the quality of a retaining wall by constructing a guide wall having water stop performance at an inside separated at a required interval from the outer wall of an established underground structure body and drilling the ground between the guide wall and the outer wall deeper than the lower end of the established underground structure body to construct the retaining wall. CONSTITUTION:Pillars 7 and beams 8 provided integral with a base, base beams and the like 6 positioned at the circumference of an established underground structure body 1 and the outer wall 3 of the lowest stairs are removed, a concrete subslab is deposited in grooves formed thereby and guide walls 10a, 10b at the lowest portion are constructed at both sides with plain concrete. The ground between a guide wall (c) and the outer wall 2 are drilled deeper than the lower end of the established underground structure body 1 to construct a retaining wall 3. Drilling liquid or the like to be poured into a bit D is not made to be flowed in the inside space 9 of the established underground structure 1 due to the water stop performance of the guide wall (c). Consequently, the quality of the retaining wall can be secured, its execution becomes easy and the cost of construction can be reduced.