    • 1. 发明专利
    • Earthquake-resisting wall and construction method of earthquake-resisting wall
    • 地震电阻墙和地震电阻墙的施工方法
    • JP2012112210A
    • 2012-06-14
    • JP2010263897
    • 2010-11-26
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • HIRAI KEIICHIUCHIDA TAKAOMIYAUCHI YASUMASAHIGAKI AYUMU
    • E04G23/02
    • PROBLEM TO BE SOLVED: To improve the earthquake-resisting performance of an earthquake-resisting wall while suppressing the increase of costs.SOLUTION: By a headed stud 140 projected in another out-of-plane direction provided on a steel form 130, stress is transmitted between a reinforced concrete wall 110 and the steel form 130. Further, by a post-construction anchor 120, the stress is transmitted between the reinforced concrete wall 110 and a column 12 and a beam 14. That is, the steel form 130 and the reinforced concrete wall 110 are integrated by the headed stud 140, and the reinforced concrete wall 110, the column 12 and the beam 14 are integrated by the post-construction anchor 120. Thus, since the steel form 130 functions as an earthquake-resisting element, the earthquake-resisting performance of an earthquake-resisting wall 100 is improved while suppressing the increase of costs. Also, in a range in which the earthquake-resisting performance is secured, the thickness of the earthquake-resisting wall 100 is reduced compared to the case that this invention is not applied.
    • 要解决的问题:提高耐震墙的抗震性能,同时抑制成本的增加。 解决方案:通过设置在钢板130上的另外的平面外方向上突出的头螺柱140,应力在钢筋混凝土壁110和钢板130之间传递。此外,通过后施工锚杆120 应力在钢筋混凝土壁110和柱12和梁14之间传递。也就是说,钢板130和钢筋混凝土墙110由头部螺柱140和钢筋混凝土壁110,柱 12,梁14由后施工锚定件120一体化。因此,由于钢板130作为抗震元件起作用,因此提高了抗震墙100的抗震性能,同时抑制了成本的增加 。 此外,在与不施加本发明的情况相比,在确保抗震性能的范围内,抗震壁100的厚度减小。 版权所有(C)2012,JPO&INPIT
    • 2. 发明专利
    • Cone-type failure portion-reinforcing structure, building with the same, and method for computing increment of failure strength
    • CONE型失效部分加固结构,建筑物以及计算失效强度增加的方法
    • JP2011021433A
    • 2011-02-03
    • JP2009169350
    • 2009-07-17
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • ISHIKAWA YUJIIIDA MASANORIMIYAUCHI YASUMASA
    • E04B1/58E02D27/08
    • PROBLEM TO BE SOLVED: To compute an incremental load of a cone-type failure portion, which is increased by a reinforcing linear member arranged at an angle with respect to a linear member undergoing the action of a pull-out force.
      SOLUTION: The incremental load P
      c of main reinforcements 32A and 32B of a column, which is computed from formula (1), is added to design failure strength of the cone-type failure portion 30. In other words, the contributory load of the main reinforcements 32A and 32B is added to the design failure strength of the cone-type failure portion 30. In this case, the amount δ
      s of allowable deflection of the main reinforcements 32A and 32B in the direction of pulling out main reinforcements 18 and 20 of a beam is appropriately adjusted depending on the strength, number, etc. of the main reinforcements 32A and 32B for use. Additionally, when a reinforcing member different from the main reinforcements 32A and 32B is provided in the cone-type failure portion 30, the amount δ
      s of allowable deflection of the main reinforcements 32A and 32B can also be estimated from the strength, proof stress, etc. of the reinforcing member. The incremental load P
      c of the failure strength of the cone-type failure portion 30 is computed by using the amount δ
      s of allowable deflection.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:计算锥形失效部分的增量负载,其通过相对于经受拉拔力的线性构件成一定角度布置的加强线性构件增加。 解决方案:根据公式(1)计算的列的主增强件32A和32B的增量负载P c 被加到锥形失效部分30的设计失效强度 换句话说,主加固件32A和32B的贡献载荷被加到锥形破坏部分30的设计破坏强度上。在这种情况下,允许偏转量δ s 根据使用的主加强件32A和32B的强度,数量等,适当地调整沿着拉伸梁的主加强件18和20的方向的主加强件32A和32B。 此外,当在锥形失效部分30中设置与主加强件32A和32B不同的加强构件时,还可以估计主增强件32A和32B的允许偏转量δ s 来自加强构件的强度,抗力等。 锥形破坏部30的破坏强度的增量负荷P c 通过使用允许偏转量δ s 来计算。 版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Structural member
    • 结构会员
    • JP2009108591A
    • 2009-05-21
    • JP2007281813
    • 2007-10-30
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • FUKUHARA TAKESHIMIYAUCHI YASUMASA
    • E04B1/30E04C5/02
    • PROBLEM TO BE SOLVED: To provide a structural member for a concrete column or beam, which has proper constructibility and facilitates the mounting of a reinforcing member for reinforcing a steel pipe.
      SOLUTION: A restraining steel pipe 10 for reinforcing the column 12 is provided in such a manner as to surround the concrete column 12. Opposed pipe walls of the restraining steel pipe 10 are provided with a plurality of through-holes 14, and long bolts 16 as reinforcing members are inserted in a cross shape in a cross-sectional view into the through-holes 14, respectively. Both ends of the long bolt 16 are extended out with a length L1 to the outside of the restraining steel pipe 10, and fixed by means of a nut 18 in such a manner as to sandwich a washer 20 in between from the outside of the restraining steel pipe 10 through the use of a portion elongated out with the length L1.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供具有适当构造性的混凝土柱或梁的结构构件,并且便于安装用于加强钢管的加强构件。 解决方案:用于加强柱12的约束钢管10以围绕混凝土柱12的方式设置。约束钢管10的相对的管壁设置有多个通孔14,并且 作为加强构件的长螺栓16分别以横截面视图插入到通孔14中。 长螺栓16的两端以长度L1延伸到限制钢管10的外部,并且通过螺母18固定,以将夹紧垫圈20夹在限制钢管10的外侧之间 钢管10通过使用长度为L1的部分伸长。 版权所有(C)2009,JPO&INPIT
    • 4. 发明专利
    • Method and structure for joining precast-concrete construction beam-column
    • 混凝土预应力混凝土结构梁柱的方法与结构
    • JP2009002101A
    • 2009-01-08
    • JP2007166085
    • 2007-06-25
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • KIMURA HIDEKIMOCHIDA TETSUOMIYAUCHI YASUMASAOTA YOSHIHIROISHIKAWA YUJITAKATSU HIROTOOUSALEM HASSANE
    • E04B1/58E04B1/22
    • PROBLEM TO BE SOLVED: To provide a method for joining a precast-concrete construction beam-column saving the labor of a junction system and simplifying the execution of works by making all of the introduction of a prestress by a clamping, a tension or the like useless in the case of a PCa beam-column and enabling the shortening of the term of works and the reduction of a cost.
      SOLUTION: A steel material 3 having a flexibility is bent and inserted into a through-hole 4 formed so as to be penetrated to a column 1 from the external side face of one beam end section 2 and to reach to the external side face of the other beam end section 2 in an arrangement configuring a lap joint with a beam main reinforcement 5 and stretched at both ends of the through-hole 4. The inside of the through-hole 4 is filled with a grout material 6 having a high adhesion.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种连接预制混凝土结构梁柱的方法,节省了连接系统的人力,并且通过通过夹紧引起预应力的全部引入来简化作业的执行,张力 在PCa梁柱的情况下无用,并且能够缩短工程期限和降低成本。 解决方案:具有柔性的钢材3弯曲并插入到形成为从一个梁端部2的外侧面穿入柱1的通孔4中,并到达外侧 另一个梁端部2的表面构成与梁主加强件5的搭接部并且在通孔4的两端处被拉伸的布置。通孔4的内部填充有具有 高附着力。 版权所有(C)2009,JPO&INPIT
    • 5. 发明专利
    • Concrete pile joining method
    • 混凝土桩接合方法
    • JP2007162416A
    • 2007-06-28
    • JP2005363145
    • 2005-12-16
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • TSUCHIYA TOMIOHAMADA JUNJIUSAMI TORUMIYAUCHI YASUMASA
    • E02D5/34E02D27/12E02D27/34
    • PROBLEM TO BE SOLVED: To provide a concrete pile joining method belonging to a technical field of a method for joining a pile head of a concrete pile to a lower part of a structure, more specifically a method for positively reducing bending moment in case of a big earthquake.
      SOLUTION: Pile main reinforcements 3 are arranged lowered to a fixed depth from a pile head level, and concrete 4 is placed to construct a foundation pile 1. An extra fill on the pile head 2 of the foundation pile 1 is removed to the pile head level to leave a center core at the pile head and to form an annular stepped part at the outer periphery. Concrete with low rigidity and a high deforming property is placed at the stepped part of the pile head, and a foundation such as a foundation beam, a foundation slab, footing and a column is constructed in an axial force supportable manner on the upper face of the pile head.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种属于将混凝土桩的桩头与结构的下部接合的方法的技术领域的混凝土桩接合方法,更具体地说,一种用于积极地减小弯矩的方法 大地震的情况 解决方案:桩主加固件3从堆头水平面下降到固定深度,混凝土4被放置成构造基桩1.将基础桩1的桩头2上的额外填充物移除 桩头水平在桩头处留下中心芯,并在外周形成环状阶梯部。 具有低刚性和高变形性的混凝土被放置在桩头的阶梯部分,并且基础梁,基础板,基脚和柱体的基础以可轴向力支撑的方式构造在 桩头。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Method for reinforcing bending proof stress of upper end part of foundation pile or upper and lower end part of column of existing structure
    • 基础桩上部弯曲屈曲应力的方法或现有结构柱的上端和下端部分
    • JP2006328850A
    • 2006-12-07
    • JP2005155545
    • 2005-05-27
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • HAMADA JUNJITSUCHIYA TOMIOUSAMI TORUMIYAUCHI YASUMASA
    • E02D27/34E02D27/12E02D31/08E04G23/02
    • PROBLEM TO BE SOLVED: To provide a method for reinforcing the bending proof stress of an upper end part of a foundation pile at a location corresponding to the lower surface of a foundation structure of an existing structure or upper and lower end parts of a column at a location corresponding to the upper or lower surface of a beam or a slab when the existing structure on which a horizontal force of earthquakes etc. acts is to be extended and increased in quantity.
      SOLUTION: Slits 5 etc. or a notch 7 is provided for the outer circumference of the upper end part 1' of the foundation pile 1 at a location corresponding to the lower surface of the foundation structure 4 of the existing structure 2 to concentrate the burden of a long-period vertical load of the structure 2 on a center part of the upper end part 1' of the pile, reduce normal-time stress acting on the outer circumferential edge of the upper end part 1' of the pile, and reinforce the bending proof stress of the upper end part 1' of the pile.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种在现有结构的基础结构的下表面或上下端部分的基础结构的下表面的位置加强基础桩的上端部的弯曲应力的方法 当水平地震等等作用的现有结构的数量将被扩大和增加时,在对应于梁或板的上表面或下表面的位置处的柱。 解决方案:在与现有结构2的基础结构4的下表面相对应的位置,为基础桩1的上端部1'的外周设置狭缝5等或凹口7, 将结构2的长时间垂直载荷的负担集中在桩的上端部1'的中心部分,减少作用在桩的上端部1'的外周缘上的正时时间应力 并且增强了桩的上端部1'的弯曲应力。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Joint method of members
    • 联合会员方法
    • JP2005009630A
    • 2005-01-13
    • JP2003176391
    • 2003-06-20
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • UMEKUNI AKIRAIKEO YOSAKUSUGATA MASAHIROMIYAUCHI YASUMASAABE TOMIICHIYAMAMOTO KOZOKAMIMURA MASAYUKIKAMICHI MASANORI
    • E04B1/61F16B5/02F16B5/08
    • PROBLEM TO BE SOLVED: To provide a joint method of members of high workability and economical efficiency, and not needing the management and skill of high degree, capable of being properly executed at a job site under severe construction environment, and solving a problem on the increase of the cost for machining, the cost for material and the cost for fastening work, as bolts are not essential components.
      SOLUTION: A plurality of through holes 3 are formed on end parts of joined members 1 and a splint material 2 in an aligned state, end parts of the joined members 1 are butted, the splint material 2 is placed on their side face, the through holes 3 are aligned, a filler material is poured into the aligned through holes, so that the joined members are butted and joined by bearing effect obtained by hardening the filler material.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供高可加工性和经济效益的成员的联合方法,不需要高度的管理和技能,能够在恶劣的施工环境下在工作现场正确执行,并且解决 加工成本增加的问题,材料的成本和紧固工作的成本,因为螺栓不是必要的部件。 解决方案:在接合构件1的端部和夹板材料2上以对准状态形成多个通孔3,将接合构件1的端部对接,将夹板材料2放置在其侧面 通孔3对准,将填充材料注入对准的通孔中,使得通过使填充材料硬化而获得的承载效果使接合部件对接和接合。 版权所有(C)2005,JPO&NCIPI