    • Earthquake strengthening structure
    • 地震强化结构
    • JP2012007303A
    • 2012-01-12
    • JP2010141768
    • 2010-06-22
    • Takenaka Komuten Co LtdTokyo Electric Power Co Inc:TheTokyo Electric Power Services Co Ltd東京電力株式会社東電設計株式会社株式会社竹中工務店
    • KINOSHITA HIDEOSAITO TSUYOSHIICHIKAWA KOJIKANEKO HIROFUMIONO YOSHINOBUTANIMOTO EISUKEDOI YASUO
    • E04G23/02
    • PROBLEM TO BE SOLVED: To execute earthquake strengthening of steel frame members by a simple configuration and with excellent workability.SOLUTION: An existing brace 14 comprising two angles 12 is combined in a T shape by putting one flange each of the angles 12 together back to back and bonded 18 with a bolt holding an intermediate plate 16 therebetween. The brace 14 is surrounded by a stiffening pipe 22 except both ends and through-holes 20 are provided on both ends. The stiffening pipe 22 is turned to a pipe shape surrounding the brace 14 by two stiffeners 23 having a joint surface in the longitudinal direction. A recess 23A is molded on the stiffeners 23 by press working, and a flange 23B is projected from both sides of the recess 23A. Spacers 28, 30 are provided at a predetermined interval inside the stiffening pipe 22, and a predetermined gap is provided between the spacers 28, 30 and the brace 14. A locking bolt 24 to be abutted with the end face of the stiffening pipe 22 is provided on one end of the brace 14.
    • 要解决的问题:通过简单的结构和优异的可加工性来执行钢框架构件的抗震加固。 解决方案:将包括两个角12的现有支架14通过将每个角度12的一个凸缘一起背靠背并且用固定在其间的中间板16的螺栓18接合而组合成T形。 支架14由加强管22围绕,除了两端,通孔20设置在两端。 加强管22通过在长度方向上具有接合面的两个加强件23转动成围绕支柱14的管状。 凹部23A通过冲压加工成型在加强件23上,凸缘23B从凹部23A的两侧突出。 间隔件28,30以加强管22内的预定间隔设置,并且在间隔件28,30和支柱14之间设置预定的间隙。与加强管22的端面抵接的锁定螺栓24是 提供在大括号14的一端。版权所有(C)2012年,JPO&INPIT
    • 6. 发明专利
    • Construction method for extension, repair, or extention and repair while existing building being at work
    • 在现有建筑工程中进行延伸,修理或维护和维修的施工方法
    • JP2007009642A
    • 2007-01-18
    • JP2005195129
    • 2005-07-04
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • ISHIKAWA YOSHIHIROYUASA YOICHIHOSHINO HARUOSUGATA MASAHIROTABAI HIROSHIUEJIMA YASUSHIYUDE TOSHIAKIICHIKAWA KOJIISHIKAWA ATSUO
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a construction method for extension, repair or extension and repair while an existing building being at work capable of properly performing the rebuilding construction of mass commercial facilities in cities forested with buildings without causing troubles in the businesses of tenants.
      SOLUTION: This construction method comprises a step for forming a space part vertically passed through an existing building 1 by dismantling a part of the existing building and building a mega-column 3 of such a height and scale that can construct a high rise part building 4 over the top of the existing building 1 in the space part by utilizing an existing foundation 2, a step for newly building the high rise part building 4 in the upper space of the existing building 2 by utilizing the mega-column 3, and a step for rebuilding the existing building 1 by vertically dividing the existing building 1, moving tenants, offices, and dwelling houses to the newly built high rise part building 4 for each vertically divided district, performing the dismantling construction and newly building construction (or rebuilding construction) in the vertically divided districts, and advancing the movement, dismantling construction, and newly building construction (or repair construction) for each vertically divided district sequentially.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种扩建,维修或延伸和修理的施工方法,同时在正在进行工作的现有建筑物能够适当地进行建筑物的大规模商业设施建设,而不会造成业务困扰的城市 的租户。 解决方案:该施工方法包括通过拆除现有建筑物的一部分来形成垂直通过现有建筑物1的空间部分的步骤,并且构建可构造高层的这种高度和尺度的大柱3 通过利用现有基础2,在现有建筑物1的顶部的部分建筑物4,通过利用大柱3在现有建筑物2的上部空间中新建高层建筑物4的步骤, 并通过将现有建筑1,将租户,办公室和住宅搬迁到每个垂直分区的新建高层建筑4,将拆除建筑和新建筑施工(或 重建工程),纵向分割地区,推进运动,拆除施工,新建筑施工(或维修施工) 盟军分区顺序。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • METHOD AND DEVICE FOR EXECUTION STATE DRAWING OUTPUT AND RECORD MEDIUM
    • JP2000110350A
    • 2000-04-18
    • JP28083298
    • 1998-10-02
    • TAKENAKA KOMUTEN CO
    • TAKAO TAKESHIICHIKAWA KOJI
    • E04G21/00
    • PROBLEM TO BE SOLVED: To show an execution state so as to save the discussion and confirmation of the execution plan of construction work. SOLUTION: When a reference crossing the three-dimensional execution space of a construction and the output of an execution state drawing with regard to the reference face is designated in a specified time within an execution period, a member and a temporarily set material existing in a display range (the range shown by being surrounded in (A) by a broken line) having prescribed width in the direction of including and intersecting the reference face is extracted within the specified time on the basis of information expressing the execution time of the information and a member or the use period of the temporarily set material expressing the disposition position of each member constituting the construction and each temporarily set material used during execution, and an execution state drawing showing the extracted member and the temporarily set material at a position corresponding a projection position for a projection face substantially parallel with the reference face as a diagram corresponding to the kind of the individual member or the temporarily set material is output (referring to (C) and (D).