会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Sheathing work
    • 打理工作
    • JPS59195929A
    • 1984-11-07
    • JP7003183
    • 1983-04-22
    • Taisei Corp
    • FUJINAMI YASUOIKENOTANI KAZUHIKOSONODA KUNIYUKITAKECHI KATSUYUKIKATOU HIROSHI
    • E02D17/04
    • E02D17/04
    • PURPOSE:To easily regulate the depth of back-filling work by a method in which a back-filling concrete formwork made up of a trench-shaped wire mesh is set between a master pile and a wale, and then concrete is placed into the formwork. CONSTITUTION:A trench-shaped wire mesh (a) is cut in such a way as to match its size with the distance between a master pile 1 and a wale 2 to form a back- filling concrete formwork 3. The formwork 3 is set between the master pile 1 and the wale 2 on a waling bracket 4 fixed to the flange of the master pile 1. Concrete or mortar packed in a vinyl bag is packed into the formwork 3, and therefore, the depth of the back-filling concrete can be easily regulated, particularly advantageous in the case of great back-filling work.
    • 目的:通过在主桩和纵行之间设置由沟槽状金属丝网构成的填充填料的混凝土模板,然后将混凝土放入模板中,以便容易地调节后备工作的深度 。 构成:将沟槽状金属丝网(a)切割成将其尺寸与主桩1和纵行2之间的距离相匹配,以形成后填充混凝土模板3.模板3设置在 主桩1和固定在主桩1的法兰上的扳手支架4上的纵行2。包装在乙烯基袋中的混凝土或砂浆被包装在模板3中,因此,填充混凝土的深度可以 容易调节,特别有利的是在良好的后加注工作的情况下。