会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Production system for wafer
    • 晶圆生产系统
    • US07637708B2
    • 2009-12-29
    • US11327336
    • 2006-01-09
    • Toshihiko AokiShunichi ImaoAkihiko KosugiKiichi Uchino
    • Toshihiko AokiShunichi ImaoAkihiko KosugiKiichi Uchino
    • B65H1/00
    • H01L21/67727H01L21/67276H01L21/6773H01L21/67733H01L21/67736H01L21/67769H01L21/67775Y10S414/137
    • The system includes a first conveying vehicle for holding and conveying wafers as products finished with an inspection step from a stock storage shelf group 11 to a reloading device 17, and a second conveying vehicle for holding and conveying a transporting container from a reloading device to a transporting storage shelf group: wherein a traveling course of the first conveying vehicle is provided on one side of the reloading device and a traveling course for the second conveying vehicle is provided on the other side; the reloading device includes a first mounting table for mounting the conveying container, a second mounting table for mounting the transporting container, and a reloading device for reloading wafers in the conveying container mounted on the first mounting table to the transporting container mounted on the second mounting table; and the installed number of the first mounting tables is larger than that of the second mounting tables.
    • 该系统包括第一输送车辆,用于将产品从库存仓架组11到重新装载装置17的完成检查步骤的产品中保持和输送晶片;以及第二输送车辆,用于将运送容器从重装装置保持和输送到 运送存储架组:其中第一输送车辆的行驶路线设置在再装载装置的一侧,另一侧设置有用于第二输送车辆的行进路线; 重新装载装置包括用于安装输送容器的第一安装台,用于安装输送容器的第二安装台和用于将安装在第一安装台上的输送容器中的晶片重新装载到安装在第二安装件上的输送容器的再装载装置 表; 并且第一安装台的安装数量大于第二安装台的安装数量。
    • 4. 发明申请
    • Production system for wafer
    • 晶圆生产系统
    • US20070157878A1
    • 2007-07-12
    • US11327336
    • 2006-01-09
    • Toshihiko AokiShunichi ImaoAkihiko KosugiKiichi Uchino
    • Toshihiko AokiShunichi ImaoAkihiko KosugiKiichi Uchino
    • B05C13/00B32B37/00
    • H01L21/67727H01L21/67276H01L21/6773H01L21/67733H01L21/67736H01L21/67769H01L21/67775Y10S414/137
    • The system includes a first conveying vehicle for holding and conveying wafers as products finished with an inspection step from a stock storage shelf group 11 to a reloading device 17, and a second conveying vehicle for holding and conveying a transporting container from a reloading device to a transporting storage shelf group: wherein a traveling course of the first conveying vehicle is provided on one side of the reloading device and a traveling course for the second conveying vehicle is provided on the other side; the reloading device includes a first mounting table for mounting the conveying container, a second mounting table for mounting the transporting container, and a reloading device for reloading wafers in the conveying container mounted on the first mounting table to the transporting container mounted on the second mounting table; and the installed number of the first mounting tables is larger than that of the second mounting tables.
    • 该系统包括第一输送车辆,用于将产品从库存仓架组11到重新装载装置17的完成检查步骤的产品中保持和输送晶片;以及第二输送车辆,用于将运送容器从重装装置保持和输送到 运送存储架组:其中第一输送车辆的行驶路线设置在再装载装置的一侧,另一侧设置有用于第二输送车辆的行进路线; 重新装载装置包括用于安装输送容器的第一安装台,用于安装输送容器的第二安装台和用于将安装在第一安装台上的输送容器中的晶片重新装载到安装在第二安装件上的输送容器的再装载装置 表; 并且第一安装台的安装数量大于第二安装台的安装数量。
    • 7. 发明授权
    • Engagement chain
    • 订婚链
    • US08585015B2
    • 2013-11-19
    • US12625165
    • 2009-11-24
    • Toshihiko Aoki
    • Toshihiko Aoki
    • B66F13/00B66D1/20B66F1/00F16G13/04
    • F16G13/20B66F3/06B66F13/005
    • There is provided an engagement chain whose driving force per occupied space is increased, whose durability is improved by reducing stress in a direction of bending a connecting pin and whose engagement noise during driving is reduced. The engagement chain includes a large number of outer and inner link plates, each having hook-like portions, which are connected in a chain longitudinal direction by connecting pins, the large number of outer and inner link plates are connected flexibly without gap in the chain width direction while the back surfaces of the link plates opposite to the hook-like portions engage with driving sprockets.
    • 提供了一种接合链,其每个占用空间的驱动力增加,其耐久性通过减小连接销弯曲方向上的应力而得到改善,并且其驱动期间的接合噪声减小。 接合链包括大量外链板和内链板,每个具有钩状部分,其通过连接销连接在链条纵向方向上,大量外链条和内连接板在链条中无间隙地灵活连接 而与钩状部分相对的链板的后表面与驱动链轮啮合。
    • 9. 发明授权
    • Clamping apparatus
    • 夹紧装置
    • US07621514B2
    • 2009-11-24
    • US11279468
    • 2006-04-12
    • Ryu OkuboToshihiko AokiHiromi Ohshima
    • Ryu OkuboToshihiko AokiHiromi Ohshima
    • B23Q3/08
    • B23Q1/0063
    • A clamping apparatus detachably clamps a work on a pallet. When a second pressing plate moves down from the unclamped state of a first position, elastic force of a first elastic member acts on a shaft through a first retainer and first operating balls so that a clamping arm is pressed down. When a first pressing plate moves down by a short distance, the first operating balls shift to the position of an unlocking segment of a sleeve, and a second operating balls are also located at an unlocking segment of a clamping case, to realize a releasing position. When the shaft is located at the releasing position where the first and second operating balls are not engaged with the shaft, the shaft can be removed from the clamping case.
    • 夹紧装置可拆卸地夹紧托盘上的工件。 当第二压板从第一位置的未夹紧状态向下移动时,第一弹性构件的弹力通过第一保持器和第一操作球作用在轴上,使得夹紧臂被按压。 当第一按压板向下移动短距离时,第一操作球移动到套筒的解锁段的位置,并且第二操作球也位于夹紧壳体的解锁段处,以实现释放位置 。 当轴位于第一和第二操作球不与轴接合的释放位置时,轴可以从夹紧壳体移除。