会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Construction management system in ground improvement method
    • 地基改良方法施工管理系统
    • JP2012246658A
    • 2012-12-13
    • JP2011118234
    • 2011-05-26
    • Shimizu Corp清水建設株式会社Fudo Tetra Corp株式会社不動テトラTenox Corp株式会社テノックスAomi Construction Co Ltdあおみ建設株式会社
    • KAMIMURA KAZUYOSHITONISHI YUKIOTAKAHASHI TATSUOFUKADA HISASHIKAMI SHUJITAKAHASHI TSUYOSHI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a construction management system in a ground improvement method, which enables speedy calculating an estimated amount of excavated soil with high reliability.SOLUTION: An inventive construction management system is applied to a ground improvement method in which a screw rod equipped with an agitation blade at its tip is penetrated into the ground, a ground improvement material is injected into the ground, the screw rod is pulled out while the ground improvement material and sediment are agitated/mixed together by rotation of the agitation blade, and the sediment equivalent to the amount of the injected ground improvement material is removed. In the construction management system, a depth, the number of revolutions, penetration speed, and pulling-out speed of the screw rod, and an injection amount of the ground improvement material are detected and monitored. Then, a ratio of the injection amount of the ground improvement material slurry to the ground to be improved is regarded as a ground improvement material mixing ratio, an earth removal factor is set on the basis of a predetermined ground improvement material mixing ratio from a relationship between a preliminarily obtained ground improvement material mixing ratio and earth removal factor, an estimated amount of soil excavated by the screw rod is calculated on the basis of the set earth removal factor and the number of revolutions, and the estimated amount of excavated soil is monitored as a management item.
    • 要解决的问题:提供一种地面改进方法中的施工管理系统,其能够以高可靠性快速计算出挖土的估计量。 解决方案:将本发明的施工管理系统应用于其顶端装有搅拌叶片的螺杆穿入地面的地面改良方法中,将地面改良材料注入地面,螺杆为 通过旋转搅拌叶片将地面改良材料和沉淀物搅拌/混合在一起而拉出,并且去除与注入的地面改良材料的量相当的沉积物。 在施工管理系统中,检测和监视深度,螺杆的转数,穿透速度和拉出速度以及地面改进材料的喷射量。 然后,改善地面改性材料浆料与地面的喷射量的比例被认为是地面改良材料混合比,基于从关系式的预定的地面改良材料混合比设定土壤去除率 在预先获得的地面改良材料混合比和除土因子之间,根据设定的土方去除因子和转数来计算由螺杆挖出的土壤的估计量,并且监测挖掘土壤的估计量 作为一个管理项目。 版权所有(C)2013,JPO&INPIT
    • 2. 发明专利
    • Ground improvement method
    • 地面改良方法
    • JP2012246659A
    • 2012-12-13
    • JP2011118235
    • 2011-05-26
    • Shimizu Corp清水建設株式会社Fudo Tetra Corp株式会社不動テトラTenox Corp株式会社テノックスAomi Construction Co Ltdあおみ建設株式会社
    • KAMIMURA KAZUYOSHITONISHI YUKIOTAKAHASHI TATSUOFUKADA HISASHIKAMI SHUJITAKAHASHI TSUYOSHI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a ground improvement method which enables improving construction efficiency while securing construction quality.SOLUTION: In an inventive ground improvement method, a rod 3 equipped with an agitation blade 2 is penetrated into the ground to a predetermined depth being rotated without a ground improvement material injected, and the rod is pulled out being rotated while the ground improvement material is injected from the rod and the ground is agitated/mixed by the agitation blade 2. An adjustment blade cutting frequency is obtained by reckoning a blade cutting frequency of the agitation blade in inserting the rod without injecting the ground improvement material into a blade cutting frequency of the agitation blade in pulling out the rod while injecting the ground improvement material. The adjustment blade cutting frequency is set on the basis of a target variation coefficient of soil improvement body intensity from a relationship between a preset variation coefficient of soil improvement body intensity and the adjustment blade cutting frequency, and ground improvement is performed with the set adjustment blade cutting frequency as a construction management item.
    • 要解决的问题:提供一种能够在确保施工质量的同时提高施工效率的地面改进方法。 解决方案:在本发明的地面改进方法中,装备有搅拌叶片2的杆3被穿入地面以预定的深度被旋转而没有注入地面改善材料,并且杆被拉出以在地面旋转 改进材料从杆上注入,地面通过搅拌叶片2搅动/混合。调节叶片切割频率是通过推算搅拌叶片在插入棒的切割频率而不将地面改良材料注入叶片 在注入地面改良材料的同时拉出杆的搅拌叶片的切割频率。 基于土壤改善体强度的预设变化系数和调整叶片切割频率之间的关系,基于土壤改善体强度的目标变异系数设定调整叶片切割频率,并且利用设定的调整叶片 切割频率作为施工管理项目。 版权所有(C)2013,JPO&INPIT
    • 7. 发明专利
    • Ground improvement method and device for the same
    • 接地改进方法及其设备
    • JP2014177797A
    • 2014-09-25
    • JP2013051702
    • 2013-03-14
    • Fudo Tetra Corp株式会社不動テトラ
    • FUKADA HISASHIISOTANI SHUJIWATANABE EIJI
    • E02D3/08
    • PROBLEM TO BE SOLVED: To reduce the displacement of a proximity structure caused by change in ground density or the like accompanying a ground improvement to zero.SOLUTION: In a ground improvement method, a ground is compacted, without giving displacement to an existing structure as an object, by repeating an operation of press-fitting a fluidized material through pumping by pump means from a predetermined depth to a ground surface side so that the volume of the fluidized material becomes the same as a reduced amount of volume resulting from compaction of an original ground part by excitation to the original ground part by means of a vibrator at the predetermined depth.
    • 要解决的问题:减少由地面密度等的变化引起的接近结构的位移,伴随着地面改善为零。解决方案:在地面改进方法中,地面被压实,而不会使现有结构发生位移,因为 目的是通过重复通过泵装置将流化材料压入预定深度到地表面侧的操作,使得流化材料的体积变得与通过压缩所产生的减小的体积量相同 原始地面部分通过在预定深度处的振动器通过激励到原始地面部分。
    • 8. 发明专利
    • Underground reinforcement construction method and reinforcement structure constructed therewith
    • 地下加固施工方法和加固结构
    • JP2013234499A
    • 2013-11-21
    • JP2012107740
    • 2012-05-09
    • Fudo Tetra Corp株式会社不動テトラ
    • OBAYASHI ATSUSHIFUKADA HISASHIISOTANI SHUJINAGAISHI MASAHIRO
    • E02D27/34E02D3/08
    • PROBLEM TO BE SOLVED: To prevent a mounted structure from being settled unevenly, by remaining a perpendicular degree of a pile even when liquefaction occurs.SOLUTION: According to an underground reinforcement construction method, a number of piles are installed in the ground around an existent structure. The method includes a penetration step, a tilting step and a connecting step. In the penetration step, pile members 10 and steel members 12 are installed in the ground as an integrated body by using the perpendicular pile members 10 which are installed at predetermined intervals around the existent structure as piles and one or more orthogonal steel members 12 which are connected to lower portions of the pile members 10 in such a manner that the lower end side thereof is rotatable via a support shaft, and disposed along side portions of the pile members. In the tilting step, the steel member 12 installed together with the pile member 10 in the penetration step is rotated while directing the upper portion side of that steel member toward an upper portion of an adjacent pile member which is installed separately, with a support shaft 14 as a fulcrum. In the connecting step, the upper side of the steel member 12 tilted at a predetermined angle in the tilting step is connected to the upper portion of the adjacent pile member 10.
    • 要解决的问题:为了防止安装结构不均匀,即使在发生液化时也保持垂直桩的垂直度。解决方案:根据地下加固施工方法,在现有的地面周围安装了多个桩 结构体。 该方法包括穿透步骤,倾斜步骤和连接步骤。 在穿透步骤中,桩构件10和钢构件12通过使用以预定间隔围绕现有结构安装的垂直桩构件10作为一体体安装在地面中,并且一个或多个正交钢构件12 连接到桩构件10的下部,使得其下端侧能够经由支撑轴旋转,并且沿桩构件的侧部配置。 在倾斜步骤中,与穿孔步骤中的绒头构件10一起安装的钢构件12旋转,同时将钢构件的上部侧朝着与单独安装的相邻桩构件的上部一起引导,支撑轴 14为支点。 在连接步骤中,在倾斜步骤中以预定角度倾斜的钢构件12的上侧连接到相邻的桩构件10的上部。
    • 9. 发明专利
    • Relay shaft for digging agitation shaft
    • 继电器轴用于移动轴承
    • JP2014125765A
    • 2014-07-07
    • JP2012282159
    • 2012-12-26
    • Fudo Tetra Corp株式会社不動テトラ
    • TANAKA HATSUICHIISOTANI SHUJIFUKADA HISASHI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a relay shaft for a digging agitation shaft capable of surely preventing the outflow of solidifying agent and preventing the occurrence of pollution at sea due to the solidifying agent.SOLUTION: A relay shaft 30 for the digging agitation shaft is used in a ground improvement device which includes the digging agitation shaft supported movably up and down along a leader erected on a hull, a driving machine for moving up and down the digging agitation shaft while rotating it, and a plurality of short relay shafts 30 to be additionally jointed to the digging agitation shaft, and in which the plurality of relay shafts are additionally joined to the upper end of the digging agitation shaft and to an upper end 33 of the relay shaft 30 additionally joined to the upper end of the digging agitation shaft on a hull, in sequence, until the digging agitation shaft can freely penetrate into an improved ground in a sea down to a predetermined depth, the solidifying agent is discharged from the discharge port of the digging agitation shaft and filled into the improved ground, and dug soil and the solidifying agent in the improved ground are agitated and mixed to construct an improvement pile with the solidifying operation of the solidifying agent. A flow path 32 passing from the upper end to the lower end of a shaft body 31 of the relay shaft 30 is provided for supplying the solidifying agent thereto, and a selector valve 35 is provided in the lower part of the shaft body 31 for opening/closing the flow path 32.
    • 要解决的问题:提供一种能够可靠地防止固化剂流出并防止由于凝固剂而在海上发生污染的挖掘搅拌轴的继电器轴。解决方案:用于挖掘搅拌轴的中继轴30 用于地面改进装置,其包括沿着竖立在船体上的引导件可上下移动的挖掘搅拌轴,用于使挖掘搅拌轴同时上下移动的驱动机构,以及多个短的中继轴30〜 另外连接到挖掘搅拌轴,并且其中多个继电器轴另外连接到挖掘搅拌轴的上端以及另外连接到挖掘搅拌的上端的中继轴30的上端33 轴上的顺序,直到挖掘搅拌轴可以自由地穿透到海里的改进的地面到预定的深度,凝固的 从挖掘搅拌轴的排出口排出并填充到改进的地面中,将改性土中的土壤和固化剂搅拌混合,以固化剂的固化操作构成改良桩。 设置有从中继轴30的轴体31的上端向下端延伸的流路32,用于向其供给凝固剂,在轴体31的下部设有选择阀35, /关闭流路32。
    • 10. 发明专利
    • Ground improvement device
    • 接地改进设备
    • JP2014125764A
    • 2014-07-07
    • JP2012282153
    • 2012-12-26
    • Fudo Tetra Corp株式会社不動テトラ
    • TANAKA HATSUICHIISOTANI SHUJIFUKADA HISASHI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a ground improvement device which is used for marine work, and in which short shafts can be additionally joined in a well-balanced and efficient manner, in sequence.SOLUTION: In a ground improvement device 10, a plurality of short relay shafts 30 are additionally joined to the upper end of the short relay shaft 30 additionally joined to the upper end of a digging agitation shaft 20 on a hull 2, in sequence, until the digging agitation shaft 20 can freely penetrate into an improved ground C in a sea A down to a predetermined depth, solidifying agent is discharged from the discharge port of the digging agitation shaft 20 and filled into the improved ground C, and dug soil D and the solidifying agent are agitated and mixed to construct an improvement pile F. A joint shaft 13 is provided on a driving machine 12 for connecting the upper end of the short relay shaft 30 thereto, a shaft storage stand 40 for storing the plurality of short relay shafts 30 being erected is provided in a reciprocatingly movable manner from a standby position on the hull 2 to a connection position below the joint shaft 13 of the driving machine 12 located at a rising position, and a fixing tool is detachably provided at the connection position on the hull 2 for preventing the fall of the digging agitation shaft 20 from the hull 2.
    • 要解决的问题:提供一种用于海上作业的地面改进装置,并且其中短轴可以按照良好平衡和有效的方式另外连接。解决方案:在地面改进装置10中,多个 短继电器轴30另外连接到短继电器轴30的上端,该短继电器轴30依次连接到船体2上的挖掘搅拌轴20的上端,直到挖掘搅拌轴20可以自由地穿透到改进的 在海A中的地面C到达预定深度,固化剂从挖掘搅拌轴20的排出口排出并填充到改进的地面C中,并且将土壤D和固化剂搅拌和混合以构成改进 在连接短继电器轴30的上端的驱动机12上设置有接合轴13,用于存储多个短继电器轴30的轴收纳支架40 以可往复运动的方式从船体2上的待机位置设置到位于上升位置的驱动机器12的关节轴13下方的连接位置,并且固定工具可拆卸地设置在船体上的连接位置 2,用于防止挖掘搅拌轴20从船体2的下落。