会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • APPARATUS AND METHOD FOR ALLOCATING COMPONENT, AND COMPUTER READABLE MEDIUM
    • 用于分配组件的装置和方法以及计算机可读介质
    • US20080104567A1
    • 2008-05-01
    • US11924820
    • 2007-10-26
    • Shigeta KuninobuKeiichi Handa
    • Shigeta KuninobuKeiichi Handa
    • G06F17/50
    • G06F17/5072
    • There is provided an apparatus that creates a component allocation plan for an electronic apparatus including first and second allocation layers in which components are allocated, including: a storage configured to store first and second component information indicating sizes of a plurality of first components and a plurality of second components to be allocated in the first and second allocation layer; an allocation order determiner configured to determine first and second allocation orders in which the first and second components are allocated for each layer; an allocation strategy determiner configured to determine first and second allocation strategies by which the first and second components are allocated, which are different each other; and a component allocating unit configured to allocate the first and second components in the first and second allocation layer in accordance with the first and second allocation orders and the first and second allocation strategies.
    • 提供了一种为包括分配组件的第一和第二分配层的电子设备创建组件分配计划的设备,包括:存储器,被配置为存储指示多个第一组件和多个组件的大小的第一组件信息和第二组件信息 要分配在第一和第二分配层中的第二组件; 配置为确定为每个层分配第一和第二组件的第一和第二分配顺序的分配顺序确定器; 分配策略确定器,其被配置为确定第一和第二分配策略,第一和第二分配策略被分配,所述第一和第二分配策略彼此不同; 以及组件分配单元,被配置为根据第一和第二分配顺序以及第一和第二分配策略来分配第一和第二分配层中的第一和第二组件。
    • 2. 发明申请
    • Demand-and-supply intervening system, demand-and-supply intervening method, and demand-and-supply intervening support program
    • 需求供应干预制度,需求供应干预方式和需求供应干预支持方案
    • US20050065867A1
    • 2005-03-24
    • US10896996
    • 2004-07-23
    • Hideyuki AisuKeiichi HandaToshiaki TanakaTomoshi Otsuki
    • Hideyuki AisuKeiichi HandaToshiaki TanakaTomoshi Otsuki
    • G06Q30/00G06F17/60
    • G06Q30/08G06Q40/04
    • A demand-and-supply intervening system which supports determination of a demand-and-supply relationship between users in association with demand resources and supply resources between a plurality of users, comprises an entry acquisition unit for creating an entry set by collecting a plurality of entries each of which has a plurality of resources as demand/supply objects and a combinatorial condition to be satisfied between resources, and a candidate group determination unit for extracting a candidate group of entries so that all entries included in the candidate group satisfy combinatorial conditions included in each entry when extracting the candidate group having a plurality of entry which includes at least one entry designated as a base point, and determining the presence/absence of demand-and-supply relationships between demand and supply resources between entries which belong to the candidate group and demand-and-supply quantities.
    • 支持确定与多个用户之间的需求资源和供应资源之间的用户之间的需求与供给关系的需求供应中介系统,包括:入口获取单元,用于通过收集多个 其中每个具有作为需求/供给对象的多个资源和要在资源之间满足的组合条件的条目;以及候选组确定单元,用于提取候选组的条目,使得包括在候选组中的所有条目满足包括的组合条件 在提取具有指定为基点的至少一个条目的多个条目的候选组中的每个条目中,并且在属于候选者的条目之间确定需求与供给资源之间的供求关系的存在/不存在 集团和供需数量。
    • 7. 发明授权
    • Element placement method and apparatus
    • 元件放置方法和装置
    • US5465218A
    • 1995-11-07
    • US194389
    • 1994-02-10
    • Keiichi Handa
    • Keiichi Handa
    • G06F17/50
    • G06F17/5072
    • An LSI element placement method of placing elements in accordance with an order in which branches are arranged, each branch being constituted by an element array included in a circuit diagram having first and second terminals, the method including a partial circuit extraction step of sequentially extracting data of a predetermined number of branches included in the circuit diagram from the first terminal side of the circuit diagram so as to overlap the data by a predetermined number, and an element placement step of performing an element placement operation based on a genetic algorithm in the extracted partial circuit data, thereby generating an element placement result including placement coordinate data of all elements included in the partial circuit data.
    • 一种LSI元件放置方法,按照分支排列的顺序放置元件,每个分支由包括在具有第一和第二端子的电路图中的元件阵列构成,该方法包括:顺序提取数据的部分电路提取步骤 从电路图的第一端侧包括在电路图中的预定数量的分支,以使数据与预定数量重叠;以及元素放置步骤,基于提取的遗传算法执行元素放置操作 部分电路数据,从而生成包括部分电路数据中包括的所有元素的放置坐标数据的元素放置结果。