会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • POWER GRID STABILIZATION SYSTEM AND POWER GRID STABILIZATION METHOD
    • 电网稳定系统和电网稳定方法
    • US20140365027A1
    • 2014-12-11
    • US14370071
    • 2012-01-06
    • Shigeaki NambaAtsushi HonzawaHiroto TakeuchiKazuyuki TsunodaMika Imai
    • Shigeaki NambaAtsushi HonzawaHiroto TakeuchiKazuyuki TsunodaMika Imai
    • G05F1/66
    • G05F1/66H02J3/32H02J3/46
    • Plural distributed power storage systems are used to stabilize a power system. Plural power storage systems 10 are provided in a power system. The power storage systems 10 are connected to a management system 60 via a communication network CN1. The power storage systems each include a power storage device 11, 12, and a control device 100 for controlling the power storage device. The control device stores performance information about the power storage system including the control device, location information indicating a location in the power system of the power storage system including the control device, and order information indicating an order of operation allocated to the power storage system including the control device. When a disturbance occurs in the power system, the control device performs a predetermined compensation operation based on the location information and the order information, and then returns to a preset stand-by state.
    • 多个分布式蓄电系统用于稳定电力系统。 多个蓄电系统10设置在电力系统中。 电力存储系统10经由通信网络CN1连接到管理系统60。 蓄电系统各自包括蓄电装置11,12和用于控制蓄电装置的控制装置100。 控制装置存储包括控制装置的蓄电系统的性能信息,指示包括控制装置的蓄电系统的电力系统中的位置的位置信息,以及指示分配给蓄电系统的动作顺序的指令信息,包括 控制装置。 当在电力系统中发生干扰时,控制装置基于位置信息和订单信息执行预定的补偿操作,然后返回到预设待机状态。
    • 5. 发明授权
    • Control system for plant
    • 植物控制系统
    • US5410883A
    • 1995-05-02
    • US941897
    • 1992-09-08
    • Seiitsu NigawaraShigeaki NambaHiroshi Kohmoto
    • Seiitsu NigawaraShigeaki NambaHiroshi Kohmoto
    • F01K13/02G05B9/02G05B13/02F01K13/00
    • F01K13/02G05B9/02
    • In a plant for which process control is made, a margin of an operation allowable limit for a process variable is variably established according to situations for each apparatus constituting the plant. In addition, allowable upper limits of operation considering a life consumption state and an operation schedule of each apparatus are established for respective apparatus on the basis of a life of the whole plant. The life of each apparatus and the life of the whole plant are controlled with a goal to expire all equipment substantially at the same time by reflecting the allowable operating conditions of the apparatus constituting the plant on the plant control. Therefore, it is possible to realize rational and useful plant operation.
    • 在进行过程控制的设备中,根据构成设备的每个设备的情况可变地建立过程变量的操作允许极限的余量。 此外,根据整个工厂的使用寿命,针对各个装置建立了考虑到使用寿命状态和每个装置的运行时间表的允许上限运行。 控制每台设备的寿命和整个工厂的使用寿命,目的是通过反映在工厂控制中构成设备的设备的允许运行条件,同时大幅度地使所有设备过期。 因此,可以实现合理有用的设备运行。
    • 6. 发明授权
    • Method of synchronous circuit opening of generator circuit breaker, and its control apparatus
    • 发电机断路器同步开路方法及其控制装置
    • US06501628B1
    • 2002-12-31
    • US09722550
    • 2000-11-28
    • Shigeaki NambaKengo UdaMasayuki Fukai
    • Shigeaki NambaKengo UdaMasayuki Fukai
    • H02H706
    • H02H3/021H01H33/006H02H7/062H02J3/38Y10T307/50
    • To provide a method of synchronous circuit opening of generator circuit breaker and its control apparatus that can protect a sound generator system of a generator main circuit from a phenomenon that current may not pass through current zero for many cycles. There is provided a construction where a generator exciting current control is incorporated into a control mechanism. In case that an occurrence possibility of a phenomenon that current may not pass through current zero for many cycles can be anticipated, time delay is intentionally caused by timer so as to prevent synchronism of the phenomenon, using an output signal of a generator lock-out relay which covers individual element of an electrical fault causing the phenomenon or in which circuit all those elements are integrated. In case that the phenomenon can be anticipated by calculation, a reactive power output of a generator is increased and consequently AC current amplitude of a sound generator is increased so as to eliminate the phenomenon.
    • 提供一种可以保护发电机主电路的发电机系统的发电机断路器的同步电路断开方法和电流不能经过电流零多次的现象。提供了一种结构,其中 发电机励磁电流控制被并入到控制机构中。 在可以预期电流可能不经过许多周期的电流零的现象的发生可能性的情况下,有时由定时器引起时间延迟,以便使用发生器锁定的输出信号来防止该现象的同步 继电器,其覆盖导致现象的电气故障的单个元件或所有这些元件被集成在哪个电路中。 在通过计算可以预期该现象的情况下,发电机的无功功率输出增加,因此增加了声发生器的交流电流振幅,从而消除了这种现象。
    • 7. 发明授权
    • Power generation plant and control apparatus therefor
    • 发电厂及其控制装置
    • US5783932A
    • 1998-07-21
    • US619185
    • 1996-03-21
    • Shigeaki NambaKengo Uda
    • Shigeaki NambaKengo Uda
    • F02C7/26H02J9/06H02J9/08H02J11/00H02P9/04
    • H02J9/066Y10T307/615
    • The object of the invention is to provide an electric power plant and a control apparatus therefor which can obtain an emergency power supply reliably through use of the turbine starter. Another generator different from the main generator coupled to the rotor shaft of the turbine is provided to the input side of the starter via a motor, and a control apparatus is provided for electrically connecting the starter and the generators responsive to a bus voltage from the in-house power supply unit which supplies electricity to a plurality of auxiliary equipment operating in the electric power plant. Thereby, an emergency power supply can be obtained reliably by the simple configuration of the invention without installing emergency power generation facilities such as a diesel engine, gas turbine or the like. In addition, an LCI device which has been utilized only at the time of turbine start up can be utilized advantageously also at the time of emergency when the in-house power supply is lost.
    • 本发明的目的是提供一种能够通过使用涡轮起动器可靠地获得应急电源的发电厂及其控制装置。 通过电动机将与发电机的转子轴相连的主发电机不同的另一发电机通过电动机提供给起动机的输入侧,并且提供控制装置,用于根据来自内燃机的总线电压来电连接起动器和发电机 电力供应单元,其向在电力设备中操作的多个辅助设备供电。 因此,通过本发明的简单结构可以可靠地获得应急电源,而无需安装诸如柴油发动机,燃气轮机等的应急发电设备。 此外,仅在汽轮机启动时才被利用的LCI装置在内部电源丢失时也可以在紧急时有利地利用。
    • 8. 发明授权
    • Power supply system
    • 电源系统
    • US07840829B2
    • 2010-11-23
    • US11562558
    • 2006-11-22
    • Satoshi MizukamiShigeaki Namba
    • Satoshi MizukamiShigeaki Namba
    • G06F1/28
    • H02J13/0062G05B23/027Y02E60/74Y02E60/7838Y04S10/30Y04S10/522Y04S40/124
    • A power supply system is structured, which has a server disposed so that it is capable of communicating through redundant communication media with a user terminal at a user site which is capable of receiving power from one power supply system selected by making a switchover among a plurality of power supply systems; the server collects information about abnormalities caused in the plurality of power supply systems through other redundant communication media from abnormality detectors disposed in a plurality of power generating plants, each of which is part of one of the plurality of power supply systems, and on a plurality of electric transmission/distribution lines, each of which is also part of one of the plurality of power supply systems; the server determines whether the power supply system from which the user is currently receiving power is normal or abnormal; if the power supply system is abnormal, the server sends, to the user terminal, information about normal power supply systems from which the user is able to receive power.
    • 一种电源系统的结构,其具有服务器,其设置为能够通过冗余通信介质与用户终端在用户站点进行通信,用户站点能够从通过在多个之间进行切换而选择的一个电源系统接收电力 供电系统; 服务器通过来自设置在多个发电厂中的异常检测器的其他冗余通信介质收集关于在多个电力供应系统中引起的异常的信息,每个发电厂是多个供电系统之一的一部分, 电力传输/配电线路中的每一个也是多个供电系统之一的一部分; 服务器确定用户当前正在接收的电源系统是正常还是异常; 如果电源系统异常,则服务器向用户终端发送用户能够接收电力的正常供电系统的信息。
    • 9. 发明申请
    • Information disclosure and contracting method for the demander of distributed power supply business
    • 分散式供电业务需求者的信息披露与承包方式
    • US20050010493A1
    • 2005-01-13
    • US10915424
    • 2004-08-11
    • Shigeaki Namba
    • Shigeaki Namba
    • G06Q30/04G06Q30/06G06Q50/00G06Q50/06G06F17/60
    • G06Q30/06G06Q30/0601G06Q50/06
    • An information apparatus of a demander is connected via a communication line to an information apparatus of a power company or enterprise. When a power supply contract is signed between the enterprise and the demander, the enterprise presents information of contract (start) periods and information of a unit price of charge for each contract period. According to the information, the demander sets a customized pattern (load pattern) for each desired one of the periods and sends the pattern to the enterprise. The enterprise presents information of charge for the load pattern. The demander determines a power supply contract for the periods. In the operation, the demander collates the load pattern at a present time with a load pattern in a predetermined period in the past and re-sets values of the load pattern at the present time. The enterprise presents information of charge for the load pattern modified and set by the demander.
    • 要求者的信息装置经由通信线路连接到电力公司或企业的信息装置。 当企业与需求者签订供电合同时,企业在每个合同期内提供合同(开始)期间信息和收费单位信息。 根据信息,需求者为每个期望的一个期间设置定制模式(负载模式),并将模式发送给企业。 企业提供负荷模式费用信息。 需求者确定期间的供电合同。 在操作中,需求者在过去的预定时间段内以负载模式在当前时间整理负载模式,并且重新设置当前负载模式的值。 企业提供由需求者修改和设置的负载模式的费用信息。