会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • REMOTE MONITORING SYSTEM
    • 远程监控系统
    • US20100250453A1
    • 2010-09-30
    • US12739756
    • 2008-10-28
    • Seiji KawaiMasataka Iwata
    • Seiji KawaiMasataka Iwata
    • G06Q10/00G06Q50/00G06F11/30
    • H04Q9/00G06Q10/20H04Q2209/10H04Q2209/30
    • A remote monitoring system includes an operating data receiving device, a failure report transmitting section, a new failure determining section, a repair progress data generating section and a repair progress updating section. The operating data receiving device receives failure data from a facility device or a management device. The failure report transmitting section transmits a failure report to a concerned party. The new failure determining section determines whether or not the failure data are new. The repair progress data generating section generates repair progress data using repair progress of the failure as a first state when the failure data are new. The repair progress updating section is capable of updating the repair progress of the repair progress data from the first state to a second state. The failure report transmitting section stops transmission of the failure report when the repair progress is the second state.
    • 远程监视系统包括操作数据接收装置,故障报告发送部,新的故障判定部,修理进度数据生成部以及修复进度更新部。 操作数据接收装置从设备装置或管理装置接收故障数据。 故障报告发送部分向相关方发送故障报告。 新的故障确定部分确定故障数据是否是新的。 当故障数据为新时,修复进度数据生成部使用故障的修复进度作为第一状态来生成修复进度数据。 维修进度更新部能够将维修进度数据的修复进度从第一状态更新为第二状态。 当维修进度为第二状态时,故障报告发送部停​​止发送故障报告。
    • 4. 发明申请
    • ACCOUNT ABUSE DETECTION OR PREVENTION DEVICE, DATA COLLECTION DEVICE, AND ACCOUNT ABUSE DETECTION OR PREVENTION PROGRAM
    • 帐户滥用检测或预防设备,数据收集设备和帐户滥用检测或预防程序
    • US20090281816A1
    • 2009-11-12
    • US12064977
    • 2006-08-23
    • Shozo HougaSeiji Kawai
    • Shozo HougaSeiji Kawai
    • G06F21/00G06Q99/00
    • H04L63/0846G06F21/55G06Q30/0281H04L63/10H04L63/1425
    • An account abuse detection or prevention device, a data collection device, and an account abuse detection or prevention program, which are capable of promptly detecting or preventing abuse of an account.An account abuse detection device (6) includes an access-amount-related value information receiving unit (11) and a detection unit (12). The access-amount-related value information receiving unit (11) receives access-amount-related value information from a management device (3). The management device (3) manages a specific account. The specific account is used when transmitting data from a plurality of data transmission devices (2) to a data collection device (5) via a public network. Access-amount-related value information is related to an access-amount-related value. The access-amount-related value is related to the amount of access by the public network (4) through the account. The detection unit (12) compares the access-amount-related value to a predetermined threshold value to detect abuse of the account.
    • 帐户滥用检测或预防设备,数据收集设备和帐户滥用检测或预防程序,能够及时检测或防止滥用帐户。 帐户滥用检测装置(6)包括访问量相关值信息接收单元(11)和检测单元(12)。 访问量相关值信息接收单元(11)从管理装置(3)接收访问量相关值信息。 管理装置(3)管理特定帐户。 当从多个数据传输设备(2)经由公共网络向数据收集设备(5)发送数据时,使用特定的帐户。 访问量相关值信息与访问量相关的值相关。 访问量相关值与公共网络(4)通过该帐户的访问量相关。 检测单元(12)将访问量相关值与预定阈值进行比较,以检测帐户的滥用。
    • 6. 发明申请
    • CONTROL DEVICE FOR CONTROLLING FACILITY EQUIPMENT
    • 用于控制设备设备的控制装置
    • US20140114441A1
    • 2014-04-24
    • US14128171
    • 2012-04-26
    • Seiji KawaiNanae Kinugasa
    • Seiji KawaiNanae Kinugasa
    • G05B13/02
    • G05B13/02F24F11/30F24F11/46F24F11/62H02J3/14H02J2003/146Y02B70/3225Y02B70/3275Y04S20/222Y04S20/224Y04S20/244
    • The control device controls facility equipment and includes a receiving unit, first and second decision units and an adjustment control unit. The receiving unit receives time-of-use unit price information of an energy supplied to the facility equipment. The first decision unit decides a first time slot in which an index that includes a factor of an energy unit price approaches a peak in a first period based on the time-of-use unit price information. The second decision unit decides a second time slot prior to the first time slot and a third time slot subsequent to the first time slot in the first period. The adjustment control unit executes an energy adjustment control to adjust an energy consumption of the facility equipment so that an amount of suppression of the energy consumption is higher in the first time slot than in the second and the third time slots.
    • 控制装置控制设备设备并包括接收单元,第一和第二判定单元和调节控制单元。 接收单元接收供应给设备设备的能量的使用时间单位价格信息。 第一决定单元基于使用时间单位价格信息来决定包括能量单价的因子的指标在第一时段中接近峰值的第一时隙。 第二判定单元决定第一时隙之前的第二时隙和第一时段中的第一时隙之后的第三时隙。 调整控制单元执行能量调整控制,以调整设备设备的能量消耗,使得在第一时隙中的能量消耗的抑制量比在第二和第三时隙中更高。
    • 8. 发明授权
    • Manipulator shoulder mechanism
    • 机械手肩部机构
    • US4922782A
    • 1990-05-08
    • US907974
    • 1986-09-16
    • Seiji Kawai
    • Seiji Kawai
    • B25J9/00B25J9/04B25J9/06B25J9/08B25J9/10B25J19/00G21F7/06
    • B25J9/0087B25J19/0025B25J9/0084B25J9/04B25J9/06B25J9/08B25J9/102G21F7/065Y10T29/49352Y10T29/4973Y10T29/531Y10T74/20317
    • In a two-arm type manipulator, it is very rare that two arms develop trouble simultaneously due to malfunction of motors and/or cables. In view of the above fact, motors for actuating manipulator joint mechanisms and cables connected between the motors and the manipulator frame are removably mounted on the shoulder section of the frame of the manipulator. Further, the first arm is so arranged as to be accessible to the second shoulder section or the second arm is so arranged as to be accessible to the first shoulder section. Therefore, it is possible to allow an access of one manipulator arm to the other disabled manipulator elements (motors and/or cables) for removal and replacement of the disabled elements with new elements without aid of another manipulator, in particular, where the manipulator is equipped in atomic facilities which refuse access, thus saving equipment investment.
    • 在双臂式操纵器中,由于电动机和/或电缆的故障,两臂同时发生故障是非常罕见的。 鉴于上述事实,用于致动操纵器接头机构的电动机和连接在电动机和操纵器框架之间的电缆可拆卸地安装在操纵器的框架的肩部上。 此外,第一臂被布置为可以对第二肩部部分进行接近,或者第二臂被布置成可以被第一肩部部分接近。 因此,可以允许一个操纵臂到另一个禁用的操纵器元件(电动机和/或电缆)的接近,以便在没有另一个操纵器的帮助的情况下,用新元件去除和替换残余元件,特别是在操纵器是 装备在原子能设施中,拒绝进出,从而节省设备投资。
    • 10. 发明申请
    • AIR CONDITIONING SYSTEM
    • 空调系统
    • US20110145395A1
    • 2011-06-16
    • US12674934
    • 2008-08-28
    • Seiji Kawai
    • Seiji Kawai
    • G06F15/173
    • H04Q9/02F24F11/30F24F11/52F24F11/58H04Q9/00H04Q2209/10H04Q2209/753
    • An air conditioning system includes one or plural device group monitoring targets including one or plural indoor units and an outdoor unit, one or plural connection devices configured to be communicably connected to the indoor unit/units and the outdoor unit and have a unique ID, and a monitoring device configured to be communicably connected to the connection device/devices and have a monitoring memory that stores data received from the connection device/devices. When power supply is started respectively, the connection device/devices respectively performs communication with the indoor unit/units and the outdoor unit to collect configuration type information representing at least the configuration and the type of the device group monitoring target corresponding to the connection device, and respectively transmits the configuration type information to the monitoring device together with the ID of the connection device corresponding to the configuration type information.
    • 空调系统包括一个或多个装置组监视目标,包括一个或多个室内单元和一个室外单元,一个或多个连接装置,被配置为可通信地连接到室内单元和室外单元并具有唯一的ID,以及 监视装置,被配置为可通信地连接到所述连接装置/装置,并且具有存储从所述连接装置/装置接收的数据的监视存储器。 当分别开始供电时,连接装置/装置分别进行与室内机/单元和室外机的通信,收集至少表示与连接装置对应的设备组监视目标的配置和类型的配置类型信息, 分别将配置类型信息与配置类型信息对应的连接装置的ID一起发送到监视装置。