会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • Rim Board Connector Rod
    • 边缘板连接杆
    • US20160237674A1
    • 2016-08-18
    • US15091263
    • 2016-04-05
    • Gary H. KoblaszEric W. Johnson
    • Gary H. KoblaszEric W. Johnson
    • E04B1/00E04B1/19E04B1/48E04B1/61E04B1/58
    • E04B1/003E04B5/10F16B5/0275
    • A connector for connecting an add on building structure to a rim board of an original building structure, including a connector rod including an elongated hollow intermediate portion and smaller breadth externally threaded extensions extending from ends of the hollow intermediate portion. The first externally threaded extension is a length to extend through an opening in the rim board that aligns with an opening in the ledger board, and internally threaded sockets are threaded onto the externally threaded extensions at a positions straddling the rim board at one end and a supportive member within the joists of the add on building structure at the other end for holding add on building at a desired distance from the rim board and preventing rotation of the connector rod.
    • 一种用于将建筑物结构附加到原始建筑结构的边缘板的连接器,包括连接杆,该连接杆包括细长的中空中间部分和从中空中间部分的端部延伸的较小宽度的外螺纹延伸部。 第一外螺纹延伸部是延伸穿过边缘板中与分页板中的开口对准的开口的长度,并且内螺纹插座在一端跨过边缘板的位置被螺纹连接到外螺纹的延伸部上, 在另一端的附加建筑物结构的托梁内的支撑构件用于保持在距离轮辋板所需距离处的建筑物并防止连接杆的旋转。
    • 5. 发明授权
    • Method and system for editing actual work records
    • 编辑实际工作记录的方法和系统
    • US6047297A
    • 2000-04-04
    • US781293
    • 1997-01-13
    • Eric W. JohnsonAlan Aitken Ramaley
    • Eric W. JohnsonAlan Aitken Ramaley
    • G06Q10/10G06K9/54G06F17/30
    • G06Q10/10
    • A method and system for editing actual work records with a start date, an end date and a work value. A period actual is entered, including a period actual start date, period actual end date, and a period actual work value. Before the period actual is stored as an actual work record, it is determined whether there is any overlap between the actual work records and the period actual. If so, any overlap between the actual work records and period actual is eliminated. Any overlapping actual work records that are completely within the period actual, i.e., with a start date and end date between the period actual start date and period actual end date, are deleted. For an overlapping actual work record that surrounds the period actual, i.e., the period actual start date and period actual end date are between the start date and end date, the end date and work value of the overlapping actual work record are modified and a new actual work record is created. For an overlapping period actual with a start date before the period actual end date and an end date equal to or between the period actual start date and period actual end date, the end date and work value are modified. For an overlapping period actual with a start date equal to or between the period actual start date and period actual end date and an end date after the period actual end date, the start date and work value are modified.
    • 用于编辑具有开始日期,结束日期和工作值的实际工作记录的方法和系统。 输入期间实际,包括期间实际开始日期,期间实际结束日期和期间实际工作值。 在实际工作记录实际存储之前,确定实际工作记录与实际周期之间是否存在重叠。 如果是,实际工作记录和期间实际之间的任何重叠都将被消除。 完全在实际期限内,即在实际开始日期和期间实际结束日期之间的开始日期和结束日期之间的重叠实际工作记录被删除。 对于实际期间实际周期重叠的实际工作记录,即期间实际开始日期和期间实际结束日期在开始日期和结束日期之间,重复的实际工作记录的结束日期和工作值被修改,并且新的 创建实际工作记录。 对于具有期间实际结束日期之前的开始日期和结束日期等于或在实际开始日期与期间实际结束日期之间的重复期间,修改结束日期和工作值。 对于实际开始日期等于或在实际开始日期与期间实际结束日期之间的重复期间以及期间实际结束日期之后的结束日期,修改开始日期和工作值。