    • 1. 发明专利
    • High-water/cement ratio type pile head treatment work
    • 高水/水泥比类型头部治疗工作
    • JPS62117914A
    • 1987-05-29
    • JP25595885
    • 1985-11-15
    • Sanwa Kizai Co LtdTakenaka Komuten Co Ltd
    • AIDA JUNROKONDO HIROHISATAGUCHI IWAOFURUKAWA YUKITAKASAITO TOSHIOSUGIBAYASHI YASUOYAMADA HIROMICHITOFUJI TAKAYOSHISAKUTA SHOJIURANO TOSHIHARUYAMAMOTO TOKUO
    • C04B24/24E02D5/34
    • PURPOSE: To make the chipping operation of pile head easier as well as reduce the occurrence of noise and vibration by a method in which an aqueous solution of a viscous high molecular compound is added to and mixed with the extra- banking portion of the heat of a concrete pile to lower the setting property of concrete in the extra-banking portion.
      CONSTITUTION: Concrete 1 for in-situ pile is placed, and then water mixed with a viscous high molecular compound is injected into the concrete 1. The amount of the high molecular compound to be added is controlled to 0.1W5.0% of the weight of water. When they are mixed while turning a propeller-shaped mixer 2, the concrete 1a of the extra-banking portion becomes of much lower strength. The pile head treating operation is ended by partly using a motor driven pick. The needs for breaker or compressor can thus be eliminated, and the total cost for treating the pile head can be greatly curtailed.
      COPYRIGHT: (C)1987,JPO&Japio
    • 目的:通过将粘性高分子化合物的水溶液加入并与其混合的方法,使桩头的切屑操作更容易,并减少噪声和振动的发生, 一个混凝土桩,以降低外部部分混凝土的固化性能。 构成:放置原位桩的混凝土1,然后将混合有粘性高分子化合物的水注入混凝土1.待加入的高分子化合物的量控制在重量的0.1-5.0% 水。 当旋转螺旋桨式混合器2时混合,混合物的外部部分的混凝土1a的强度要低得多。 桩头处理操作通过部分地使用电动机驱动的接头而结束。 因此可以消除对破碎机或压缩机的需求,可以大大减少处理桩头的总成本。
    • 2. 发明专利
    • Luminaire
    • LUMINAIRE
    • JP2007305472A
    • 2007-11-22
    • JP2006133954
    • 2006-05-12
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SUZUKI KAZUNORISAITO TOSHIOMATSUO TOYOHIRO
    • F21V33/00F21S4/00F21S8/02F21Y103/00H04R1/00H04R1/02
    • PROBLEM TO BE SOLVED: To provide a luminaire with a speaker without impairing a design property of a room space nor degrading illumination intensity of illumination.
      SOLUTION: A reflecting plate 22 is arranged on the back surface side of light sources 26. A part of the reflecting plate 22 is used as a flat vibration plate 32 of a flat speaker 30. The color of the reflecting surface of the reflecting plate 22 is the same as that of the vibration plate 32. Since the vibration plate 32 of the flat speaker 30 is hidden by the light sources 26, and the color of the reflecting surface of the reflecting plate 22 is the same as that of the vibration plate 32, the design property of the room space is prevented from being impaired by the flat speaker 30. Since the vibration plate 32 of the flat speaker 30 function as the reflecting plate 22 of the light sources 26, the illumination intensity of illumination is never degraded even when the flat speaker 30 is arranged.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供具有扬声器的照明器而不损害房间空间的设计特性或降低照明的照明强度。 解决方案:反射板22布置在光源26的背面侧。反射板22的一部分用作平板扬声器30的平板振动板32。 反射板22与振动板32相同。由于平板扬声器30的振动板32被光源26遮住,反射板22的反射面的颜色与 振动板32,防止了空间的设计性能受到扬声器30的损害。由于平板扬声器30的振动板32用作光源26的反射板22,因此照明强度 即使设置扁平扬声器30也不会降级。 版权所有(C)2008,JPO&INPIT
    • 4. 发明专利
    • Fireproof reinforcement structure of concrete-filled steel pipe column
    • 混凝土钢管柱耐火结构
    • JP2013087520A
    • 2013-05-13
    • JP2011229998
    • 2011-10-19
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • NISHIMURA TOSHIHIKOSAITO TOSHIOTAKEUCHI MITSURUNAGAOKA TSUTOMU
    • E04B1/30E04B1/94
    • PROBLEM TO BE SOLVED: To provide a fireproof reinforcement structure of a concrete-filled steel pipe column, capable of suppressing local buckling of the steel pipe column.SOLUTION: A concrete-filled steel pipe column 10 includes a steel pipe column 12, and infilled concrete 14 filled inside the steel pipe column 12. The steel pipe column 12 comprises a rectangular steel tube, and includes upper and lower steel pipe joint parts 12A to which a steel frame beam 16 as a horizontal member is joined, and a steel pipe body part 12B extending between the steel pipe joint parts 12A. A steel pipe upper end (column head) 12BU and a steel pipe lower end (column base) 12BL as axial direction ends in the steel pipe body part 12B are provided with cylindrical members 22U and 22L as buckling suppressing members, respectively.
    • 要解决的问题:提供能够抑制钢管柱的局部屈曲的混凝土填充钢管柱的防火加强结构。 解决方案:混凝土填充钢管柱10包括钢管柱12和填充在钢管柱12内的填充混凝土14.钢管柱12包括矩形钢管,并且包括上下钢管 将作为水平构件的钢框架梁16接合的接头部12A和在钢管接头部12A之间延伸的钢管主体部12B。 钢管上端(柱头)12BU和钢管主体部分12B的轴向端部的钢管下端(列底座)12BL分别设置有作为弯曲抑制构件的圆柱形构件22U和22L。 版权所有(C)2013,JPO&INPIT
    • 5. 发明专利
    • Fireproof reinforcement structure for concrete-filled steel pipe column
    • 混凝土钢管柱的防火加固结构
    • JP2013079553A
    • 2013-05-02
    • JP2011221295
    • 2011-10-05
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • NISHIMURA TOSHIHIKOSAITO TOSHIOTAKEUCHI MITSURUNAGAOKA TSUTOMU
    • E04B1/94E04B1/30
    • PROBLEM TO BE SOLVED: To obtain a fireproof reinforcement structure for a concrete-filled steel pipe column, which can decrease the coating thickness of a heat insulation material while suppressing local buckling of the steel pipe column.SOLUTION: A fireproof reinforcement structure 20 for a concrete-filled steel pipe column 10 includes: a steel pipe column 12; infilled concrete 14 which is infilled into the steel pipe column 12; a vertical stiffening rib 22 which is provided on the outside surface 12S of the steel pipe column 12; a heat insulation material 24 which is arranged adjacently to the vertical stiffening rib 22 to cover the outside surface 12S of the steel pipe column 12; and a finishing material 26 which faces the outside surface 12S of the steel pipe column 12 with the heat insulation material 24 in between and which is supported by at least one of the vertical stiffening rib 22 and the heat insulation material 24.
    • 要解决的问题:为了获得混凝土填充钢管柱的防火加强结构,其可以在抑制钢管柱的局部屈曲的同时降低绝热材料的涂层厚度。 解决方案:混凝土填充钢管柱10的防火加强结构20包括:钢管柱12; 填充到钢管柱12中的填充混凝土14; 设置在钢管柱12的外表面12S上的纵向加强肋22; 绝热材料24,其与垂直加强肋22相邻设置,以覆盖钢管柱12的外表面12S; 以及整理材料26,其与钢管柱12的外表面12S相对,隔热材料24在其间并由至少一个垂直加强肋22和绝热材料24支撑。版权所有 (C)2013,JPO&INPIT
    • 6. 发明专利
    • Concrete and method for producing concrete
    • 混凝土和混凝土生产方法
    • JP2012121764A
    • 2012-06-28
    • JP2010274083
    • 2010-12-08
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SAITO TOSHIOMITSUI TATEOYONEZAWA TOSHIOIKEO YOSAKUHASUMI TAKASHIYANAGIBASHI KUNIOTSUJI DAIJIROWACHI MASAHIRO
    • C04B28/08B07B7/083B09B1/00B09B5/00C04B7/153C04B7/19C04B18/16
    • Y02P40/143Y02W30/95
    • PROBLEM TO BE SOLVED: To provide a method for reproducing concrete raw materials from a dismantled concrete mass, and concrete produced by the method.SOLUTION: In a first separation step 100, the dismantled concrete mass 98 crushed to a diameter of 40 mm or less is pulverized to separate and recover rough aggregates 16 with a particle size of 5 mm or more and fine particles 14 with a particle size below 5 mm, whereby recycling of the rough aggregates 16 can be performed. In a second separation step 102, the fine particles 14 are separated into fine aggregates 20 with a particle size exceeding 0.6 mm and finely-divided powder 18 with a particle size of 0.6 mm or less, and the both are recovered, whereby recycling of the fine aggregates 20 can be performed. In a third separation step 104, the finely-divided powder 18 is separated into fine powder 24 and aggregate powder 26, and the both are recovered, whereby recycling of the finely-divided powder 24 can be performed. In a cement producing step 106, cement 84 is produced by adding blast furnace slag 80 and plaster 82 to the fine powder 24. In a concrete producing step 108, concrete 88 is produced by mixing water 110 to the cement 84, the rough aggregates 16 and the fine aggregates 20.
    • 要解决的问题:提供一种从拆解的混凝土块中再现混凝土原料的方法,以及通过该方法制备的混凝土。 解决方案:在第一分离步骤100中,粉碎至直径为40mm或更小的被拆除的混凝土块98被粉碎以分离并回收粒度为5mm以上的粗粒料16和微粒14与 颗粒尺寸低于5mm,从而可以进行粗骨料16的再循环。 在第二分离步骤102中,将细颗粒14分离为粒径超过0.6mm的细小聚集体20和粒径为0.6mm以下的细粉18,回收二者 可以执行细集料20。 在第三分离步骤104中,将细碎粉末18分离为细粉末24和聚集粉末26,并回收二者,由此可以进行细分粉末24的再循环。 在水泥生产步骤106中,通过将高炉渣80和石膏82加入到细粉末24中来生产水泥84.在混凝土生产步骤108中,通过将水110与水泥84混合,粗骨料16 和精细骨料20.版权所有(C)2012,JPO&INPIT
    • 7. 发明专利
    • Work shop power controller
    • 工作电源控制器
    • JP2012060719A
    • 2012-03-22
    • JP2010199386
    • 2010-09-06
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SAITO TOSHIOMIKAMI TADAO
    • H02J3/00H02J3/32H02J3/38
    • PROBLEM TO BE SOLVED: To reduce electric energy supplied from a power plant of an electric power company through a power line network to a work shop as needed.SOLUTION: A work shop power controller 10 includes: a work process DB 13a for storing work process information for specifying respective work processes of a building construction performed in the work shop 1; a power consumption DB 13b for storing power consumption information for specifying the power consumption of an electric device 40 used in the respective work processes of the work shop 1; a charging state information acquisition part 12a for acquiring charging state information for specifying the charging state of a battery provided in the electric device 40 from the electric device 40 used in the work shop 1; and a power adjustment part 12b for calculating a power supply required amount to the electric device 40 on the basis of the power consumption information stored in the power consumption DB 13b and the charging state information acquired in the charging state information acquisition part 12a, and executing prescribed control for reducing the power consumption of the electric device 40 when it is determined that the adjustment of the calculated power supply required amount is needed.
    • 要解决的问题:根据需要通过电力线网络将电力公司的发电厂提供的电力减少到工作车间。 解决方案:工作车间电力控制器10包括:工作处理DB 13a,用于存储用于指定在工作车间1中执行的建筑施工的各个工作过程的工作处理信息; 功耗DB 13b,用于存储用于指定在工作车间1的各个工作过程中使用的电气设备40的功耗的功耗信息; 充电状态信息获取部件12a,用于从用于工作车间1的电气设备40获取用于指定设置在电气设备40中的电池的充电状态的充电状态信息; 以及功率调整部12b,用于根据存储在电力消耗DB 13b中的功耗信息和在充电状态信息获取部12a中获取的充电状态信息来计算电气设备40的电力需求量,并执行 当确定需要调整所计算的电力需求量时,用于降低电气设备40的功耗的规定控制。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Work shop power control system
    • 工作电源控制系统
    • JP2012060718A
    • 2012-03-22
    • JP2010199385
    • 2010-09-06
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SAITO TOSHIOMIKAMI TADAO
    • H02J3/46G06Q50/08H02J3/00H02J3/32
    • Y02A30/62
    • PROBLEM TO BE SOLVED: To provide a work shop power control system capable of automatically preventing electric energy supplied from a power plant through a power line network to a work shop from exceeding contract power.SOLUTION: The work shop power control system 1 includes individual controllers 10 installed in the respective work shops 2 and an integrated controller 20 connected to the respective individual controllers 10. The individual controller 10 includes a work process DB for storing work process information, a power consumption DB for storing power consumption information, and a charging state information acquisition part for acquiring charging state information. The integrated controller 20 includes a contract power DB for storing contract power information, a contract power excess determination part for determining whether or not the power supply required amount of each work shop 2 exceeds the contract power, and a power adjustment part for performing predetermined control for supplying the power to the work shop 2 or for reducing the power consumption of the work shop 2 so that the power supply required amount of the work shop 2, for which it is determined that the power supply required amount exceeds the contract power, does not exceed the contract power.
    • 要解决的问题:提供一种能够通过电力线网络自动阻止从电厂提供给工厂的电能超过合同能力的工作车间电力控制系统。 解决方案:工作车间电力控制系统1包括安装在相应工作车间2中的独立控制器10和连接到各个控制器10的集成控制器20.独立控制器10包括用于存储工作过程信息的工作过程DB 用于存储功耗信息的功耗DB,以及用于获取充电状态信息的充电状态信息获取部分。 集成控制器20包括用于存储合同电力信息的合同电力DB,用于确定每个工作车间2的电力需求量是否超过合同电力的合同电力过剩判定部分,以及用于执行预定控制的功率调节部件 为了向工作车间2供电或减少工作车间2的电力消耗,使得确定供电所需量超过合同电力的工作车间2的供电所需量量 不超过合同权力。 版权所有(C)2012,JPO&INPIT
    • 9. 发明专利
    • Earthquake-controlled building
    • 地震控制楼宇
    • JP2009007881A
    • 2009-01-15
    • JP2007171870
    • 2007-06-29
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • MIYAZAKI KENICHITAKANASHI KOICHISAITO TOSHIOYAMAGATA HIROSHI
    • E04H9/02
    • PROBLEM TO BE SOLVED: To provide an earthquake-controlled building composed of a building part for a long-period, an outer-shell structure part with high strength having a shorter period than the building part and an earthquake control device for shifting a horizontal force of an earthquake or the like working on the building part to the outer-shell structure. SOLUTION: The invention is composed of a building part 1 of a long-period structure supporting its own weight and a long-term vertical load, an outer-shell structure 2 of high strength constructed separately in such a position as to surround the building part 1 and having a structure of a shorter period than the building part 1, and an earthquake control device 10 connecting the building part 1 and the outer-shell structure 2 for transmitting and shifting a horizontal force of an earthquake or the like working on the building part 1 to the outer-shell structure 2. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了提供一种由建筑物长时间构成的地震控制建筑物,具有比建筑物部分短的周期的高强度的外壳结构部分和用于移动的地震控制装置 在建筑部件上对外壳结构进行地震等的水平力。 解决方案:本发明由长周期结构的建筑部分1构成,其支撑其自重和长期垂直载荷,高强度的外壳结构2分开地构成在围绕 建筑部分1具有比建筑物部分1短的结构;以及地震控制装置10,连接建筑物部分1和外壳结构2,用于传播和移动地震等的水平作用 在建筑部分1到外壳结构2.版权所有(C)2009,JPO&INPIT