会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • Management of Network Capacity to Mitigate Degradation of Network Services During Maintenance
    • 管理网络容量,以减轻网络服务在维护过程中的退化
    • US20110122768A1
    • 2011-05-26
    • US12624947
    • 2009-11-24
    • Sanjini GeorgeJames Gordon Beattie, JR.Stephen J. Griesmer
    • Sanjini GeorgeJames Gordon Beattie, JR.Stephen J. Griesmer
    • G06F11/00
    • H04L45/22H04L41/0677H04L41/145H04L41/147H04L43/0852H04L43/0882H04W16/22H04W24/02
    • In accordance with a method of managing network capacity, simulation data is received from a simulation system based on at least one metric associated with a plurality of communication links interconnecting at least two endpoints. The simulation data indicates impact of a communication link to be taken offline a plurality of alternate communication links. It is determined whether the simulation data associated with at least one communication link satisfies at least one predetermined criterion. Further, at least one metric of the simulation system is periodically updated based on real-time data associated with the plurality of communication links. The simulation data from the simulation system based on the updated at least one metric is received. Thereafter, load from the communication link to be taken offline is selectively moved to an alternate communication link based on whether the simulation data associated with the alternate communication link satisfies the at least one predetermined criterion.
    • 根据管理网络容量的方法,基于与互连至少两个端点的多个通信链路相关联的至少一个度量,从仿真系统接收模拟数据。 模拟数据指示要使多个备用通信链路脱机的通信链路的影响。 确定与至少一个通信链路相关联的模拟数据是否满足至少一个预定标准。 此外,基于与多个通信链路相关联的实时数据,周期性地更新模拟系统的至少一个度量。 基于更新的至少一个度量的来自仿真系统的仿真数据被接收。 此后,基于与替代通信链路相关联的模拟数据是否满足至少一个预定标准,从要脱机的通信链路的负载选择性地移动到备选通信链路。
    • 2. 发明授权
    • Management of network capacity to mitigate degradation of network services during maintenance
    • 管理网络容量,以减轻维护期间网络服务的退化
    • US08363543B2
    • 2013-01-29
    • US12624947
    • 2009-11-24
    • Sanjini GeorgeJames Gordon BeattieStephen J. Griesmer
    • Sanjini GeorgeJames Gordon BeattieStephen J. Griesmer
    • H04L12/26
    • H04L45/22H04L41/0677H04L41/145H04L41/147H04L43/0852H04L43/0882H04W16/22H04W24/02
    • In accordance with a method of managing network capacity, simulation data is received from a simulation system based on at least one metric associated with a plurality of communication links interconnecting at least two endpoints. The simulation data indicates impact of a communication link to be taken offline a plurality of alternate communication links. It is determined whether the simulation data associated with at least one communication link satisfies at least one predetermined criterion. Further, at least one metric of the simulation system is periodically updated based on real-time data associated with the plurality of communication links. The simulation data from the simulation system based on the updated at least one metric is received. Thereafter, load from the communication link to be taken offline is selectively moved to an alternate communication link based on whether the simulation data associated with the alternate communication link satisfies the at least one predetermined criterion.
    • 根据管理网络容量的方法,基于与互连至少两个端点的多个通信链路相关联的至少一个度量,从仿真系统接收模拟数据。 模拟数据指示要使多个备用通信链路脱机的通信链路的影响。 确定与至少一个通信链路相关联的模拟数据是否满足至少一个预定标准。 此外,基于与多个通信链路相关联的实时数据,周期性地更新模拟系统的至少一个度量。 基于更新的至少一个度量的来自仿真系统的仿真数据被接收。 此后,基于与替代通信链路相关联的模拟数据是否满足至少一个预定标准,从要脱机的通信链路的负载被选择性地移动到备用通信链路。