会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • TURBINE BLADE
    • 涡轮叶片
    • WO2008080854A3
    • 2009-01-29
    • PCT/EP2007064237
    • 2007-12-19
    • SIEMENS AGGLOS STEFANHEUE MATTHIASPFITZINGER ERNST-WILHELMPIEPER NORBERT
    • GLOS STEFANHEUE MATTHIASPFITZINGER ERNST-WILHELMPIEPER NORBERT
    • F01K13/02
    • F01K13/02
    • The invention relates to a method (10) for increasing the steam mass flow of a high-pressure steam turbine (14) of a steam power plant (10), particularly a steam power plant (10) having reheating (38), during a start-up phase of the steam power plant (10), particularly also during an idle period of the steam power plant (10), wherein at least one electric consumer (46) is connected upstream of a generator (20) of the steam power plant (10) before synchronization with a power supply grid. The invention further relates to a steam power plant (10), comprising a generator (20), a high-pressure steam turbine (14), and at least one electric consumer (46), which can also be connected during a start-up phase of the steam power plant (10), particularly also during an idle period of the steam power plant, in order to increase a steam mass flow of the high-pressure steam turbine (14) before a synchronization process of the generator (20) with a power supply grid.
    • 本发明涉及一种方法,(10),以增加蒸汽发电站(10)的高压蒸汽涡轮机(14)的蒸汽质量流量,特别是蒸汽发电设备(10),在蒸汽发电设备(10)的启动阶段再加热(38),特别是还 蒸汽发电设备(10),其中,所述蒸汽发电设备(10)的与供电网络的至少一个电负载(46)的同步之前的发电机(20)被接通的怠速期间。 本发明怠速期间还涉及一种蒸汽发电设备(10),与在蒸汽发电设备(10)的启动阶段的发电机(20),高压蒸汽涡轮机(14)和至少一个电负载(46),特别是 蒸汽发电站,所述发电机(20)可以被连接到供电网络同步发电机(20)包括高压蒸汽涡轮机(14)的蒸汽质量流量之前增加。