会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • UNDERGROUND CONTINUOUS WALL
    • JPH06240664A
    • 1994-08-30
    • JP3096193
    • 1993-02-19
    • SHIMIZU CONSTRUCTION CO LTD
    • KATSUYOSHI CHUICHINAKAHARA KUNIAKI
    • E02D5/20E04B2/56E04B2/66
    • PURPOSE:To reduce the cost and provide a sufficient supporting strength against a structure by a method wherein a notch part is formed in the lower part of a side where landslide protection for an underground continuous wall is carried out and the thickness of the upper part of the side is increased to a value higher than that of a lower part. CONSTITUTION:In an underground continuous wall 1, the thickness of an upper part 4 thereof is increased to a value higher than that of a lower part 5 thereof and a notch part 6 is formed in the lower part 5 and on the side where landslide protection is directly performed. The underground continuous wall 1 is built in a ground 7 and a side wall 8 is built at the inside of the underground continuous wall 1 through reinforcing bars 9. A bottom slab 10 is built at the lower part of the side wall 8 and at the underground continuous wall 1 through reinforcing bars 11 and a structure 12 is built at the upper part of the side wall 8. The notches 6 of the continuous underground wall 1 are formed on the side where the bottom slab 10 is built and on the opposite side on which landslide protection is applied directly and the lower end of a thin lower part 5 is arranged such that it is extended to a non-permeable layer or a support layer. This constitution causes reduction of the whole volume of the underground continuous wall 1 and ensurance of a sufficient support strength against the structure 12.
    • 5. 发明专利
    • COMB TYPE CONTINUOUS WALL AND CONSTRUCTION METHOD THEREOF
    • JPH04149312A
    • 1992-05-22
    • JP27402890
    • 1990-10-11
    • SHIMIZU CONSTRUCTION CO LTD
    • HOSAKA YONOSUKEHAYAKAWA ATSUSHIASAKAWA MASAMIKATSUYOSHI CHUICHIUNO TOSHIRO
    • E02D27/30E02D5/20
    • PURPOSE:To separate ground excavation of both main frame part and projecting parts of the continuous wall to stabilize the construction by arranging partitioning plates made of steel plate, in which one surface multiple number of connecting bar members are planted and in which the other surface reinforcing angle material or the like are provided in the cross direction thereof, in border parts of the main frame part and projecting parts of a comb type continuous wall. CONSTITUTION:An excavating area 10 of each projecting part 10 is excavated for arrangement (a) of reinforcement, and a partitioning plate 5 is located in a border part 11 to connect connecting means 7 and the arrangement (a) of reinforcement, and thereafter, concrete is placed to construct a projecting part 2. Next, simultaneously or late from the described work, an excavating area 9a of a main frame part of the continuous wall, which is not correspondent to the excavating area 10, is excavated for the arrangement (a) of reinforcement, and a partitioning plate 5 is provided in a border part with an excavating area 10a corresponding to the excavating part 9a to connect the connecting means 7 and the arrangement (a) of reinforcement, and thereafter, concrete is placed to construct a main frame 1 of the continuous wall. Next, an excavating area 9 is excavated to perform the arrangement (a) of reinforcement, and concrete is placed to construct the main frame 1 of the continuous wall, and the main frame 1 of the continuous wall is connected to the projecting parts 2 through the partitioning plates 5 to construct a footing pile. Furthermore, the similar work is performed inside of the excavating area 10a, and the projecting part 2 is constructed to be integrated with the preceding main frame 1 of the continuous wall.
    • 8. 发明专利
    • CONSTRUCTION METHOD FOR UNDERGROUND WALL
    • JP2003268763A
    • 2003-09-25
    • JP2002076266
    • 2002-03-19
    • SHIMIZU CONSTRUCTION CO LTD
    • KOMORIDA TETSUYAWAKAYAMA SHIGEMIKATSUYOSHI CHUICHI
    • E02D5/18
    • PROBLEM TO BE SOLVED: To provide a construction method for an underground wall capable of inexpensively restraining generation of industrial waste. SOLUTION: Air blow agitation is performed by using an air hose 3 in a groove 1 filled with a groove inside stabilizing liquid 2, and the groove inside stabilizing liquid 2 is homogenized so as not to cause a variation in a specific gravity in the whole groove 1. A solidifying material input means 6 is inserted into the groove 1, and a suction port of a pump 7 is inserted for recovering the groove inside stabilizing liquid 2 by arranging a prescribed distance from this means. Simultaneously when inputting a solidifying material 4 at a constant speed to the groove 1, the groove inside stabilizing liquid 2 of the same volume quantity as the inputted solidifying material 4 is discharged by the pump 7. At this time, an input speed of the solidifying material 4 and a recovering speed of the groove inside stabilizing liquid 2 are set in the same degree so that a liquid level of the groove inside stabilizing liquid 2 always holds the constant height. After inputting a prescribed quantity of solidifying material 4, the solidifying material input means 6 and the pump 7 are removed, and the solidifying material 4 and the groove inside stabilizing liquid 2 are agitated by the air blow agitation using the air hose 3. COPYRIGHT: (C)2003,JPO
    • 9. 发明专利
    • EXCAVATION DEVICE FOR UNDERGROUND CONTINUOUS WALL
    • JPH06346447A
    • 1994-12-20
    • JP13627693
    • 1993-06-07
    • SHIMIZU CONSTRUCTION CO LTD
    • DEGUCHI TANEOMIAOKI YOSHIKIYOWATANABE TOSHIOKATSUYOSHI CHUICHINAKAHARA KUNIAKI
    • E02D17/13E02F5/02
    • PURPOSE:To promote reliability in attitude control of an excavator main body by accurately grasping coordinates of the excavator main body in the case of downward excavation by a controller and, at the same time, making receiving and transmitting of control signals between an excavator and a control section sure. CONSTITUTION:While receiving supply of data for an angle of inclination from upper inclined meters 16A and 16B and a main body inclined meter 24, excavation is made by an excavator main body 6 while revolving a rotary drum 17. In the case where the excavation is set in an automatic mode with a switch (b), excavation is made while controlling servo motors 26 and 28 as moving devices of slide tables 4A and 4B so that coordinates of C and D points calculated from data for an angle of inclination coincide with target value. By the control like this, excavation for a continuous wall, etc., can be made accurately while keeping the movement of the excavator main body 6 in a specific direction. Supply of angle data to a slide table control box 50 from the upper inclined meters 16A and 16B and main body inclined meter 24 or receiving and transmitting of signals for supply of control data to servo motor control sections 30A and 30B from the box 50 is made by a radio communication device 38.