会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • HEATING PLANT FOR CONTAINER PREFORMS
    • 用于集装箱预热器的加热设备
    • WO2014132199A1
    • 2014-09-04
    • PCT/IB2014/059262
    • 2014-02-26
    • S.I.P.A. SOCIETA' INDUSTRIALIZZAZIONE PROGETTAZIONE E AUTOMAZIONE S.P.A.
    • EUSEBIONE, ErnestoCHIAROTTO, GiovanniZOPPAS, Matteo
    • B29C49/68B29C49/64B29C49/06B29K67/00B29L31/00
    • H05B3/0057B29C49/06B29C49/6409B29C49/68B29K2067/003B29L2031/7158F27D7/02F27D7/04F27D2007/023F27D2007/045
    • A heating plant (10) for performs (20), comprises: - at least one tunnel (3, 3') for the passage of a plurality of preforms (20) - a plurality of infrared radiation lamps (6) along the tunnel (3, 3'); - forced ventilation means (2) for generating a ventilating air flow (F2, F3) through the tunnel (3, 3'), - at least one recirculation channel (15, 15') arranged to receive the ventilating air flow (F2, F3) exiting from the tunnel (3, 3'), - a mixing member (30), including a first inlet (31 ) for ambient air, a second inlet (32) for the ventilating air (F2, F3) and at least one mixed air flow outlet (F1), in which the mixing member (30) is shaped and arranged so as to convey the mixed air flow (F1) towards the forced ventilation means (2), - at least one mobile shutter (35) for regulating the degree of opening of the inlets (31, 32), - a hot air source (40); - flow means (45) for conveying the hot air from the source (40) towards the mixing member (30).
    • 一种用于执行(20)的加热设备(10),包括: - 至少一个用于多个预成型件(20)通过的隧道(3,3') - 沿隧道的多个红外辐射灯(6) 3,3'); - 强制通风装置(2),用于通过隧道(3,3')产生通风气流(F2,F3); - 至少一个再循环通道(15,15'),其布置成接收通风空气流(F2, F3), - 从混合构件(30)排出的混合构件(30),包括用于环境空气的第一入口(31),用于通风空气(F2,F3)的第二入口(32) 一个混合空气流出口(F1),其中混合构件(30)成形和布置成将混合空气流(F1)输送到强制通风装置(2), - 至少一个移动快门(35) 用于调节入口(31,32)的打开程度, - 热空气源(40); - 用于将热空气从所述源(40)输送到所述混合构件(30)的流动装置(45)。