    • Reinforcing construction method for purline-cross beam connection part in under road girder type steel railway bridge, and device therefor
    • 道路交叉梁型钢轨道连接部分的加固施工方法及其设备
    • JP2011047101A
    • 2011-03-10
    • JP2009193740
    • 2009-08-25
    • Railway Technical Res InstTtk Corp株式会社東京鐵骨橋梁財団法人鉄道総合技術研究所
    • SAITO MASAMITSUKOBAYASHI YUSUKESUGIMOTO ICHIROYAGINUMA YASUTOSHIHOSOMI NAOFUMI
    • E01D1/00E01D22/00
    • PROBLEM TO BE SOLVED: To provide a reinforcing construction method for a purline-cross beam connection part in an under road girder type steel railway bridge, capable of reducing remarkably an out-of-plane deformation and a stress of an upper flange of the purline causing a fatigue crack, in order to prevent the fatigue crack from being generated in the purline-cross beam connection part of the steel railway bridge, and a device therefor.
      SOLUTION: Bolt installing holes are drilled respectively in the upper flange 2A of the purline 2 of the purline-cross beam connection part 4 in the under road girder type steel railway bridge, a web 3A of the cross beam 3, and a connection stiffening material 5, and a reinforcement member having respectively corresponding joining faces in the upper flange 2A of the purline 2, the web 3A of the cross beam 3, and the connection stiffening material 5 are attached by bolts 7A, 7B, 7C fastened to the bolt installing holes, in the reinforcing construction method for the purline-cross beam connection part in the under road girder type steel railway bridge.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 解决的问题:为了提供一种在道路下大梁式铁路桥下的桁条横梁连接部的加强施工方法,能够显着地减少面外变形和上凸缘的应力 的迂回线引起疲劳裂纹,以防止在铁路桥梁的桁条横梁连接部分中产生疲劳裂纹及其装置。 解决方案:在公路横梁式铁路桥梁,横梁3的腹板3A和横梁3的桁条横梁连接部4的迂回线2的上部法兰2A中分别钻有螺栓安装孔, 连接加强材料5,以及在迂回线2的上凸缘2A,横梁3的腹板3A和连接加强材料5上分别具有对应的接合面的加强构件,通过紧固到 在铁路横梁连接部分的加固施工方法中,在公路大梁型钢铁路桥梁下的螺栓安装孔。 版权所有(C)2011,JPO&INPIT
    • 9. 发明专利
    • Method of manufacturing bridge part track
    • 制造桥梁零件轨迹的方法
    • JP2009013681A
    • 2009-01-22
    • JP2007177212
    • 2007-07-05
    • Railway Technical Res InstTtk Corp株式会社東京鐵骨橋梁財団法人鉄道総合技術研究所
    • WATANABE TSUTOMUASANUMA KIYOSHIOKUDA HIROYUKISOGABE MASAMICHISUGIMOTO ICHIROHOSHIKAWA MASAAKIKANEO KOJI
    • E01B19/00E01B1/00E01B2/00E01D19/12
    • PROBLEM TO BE SOLVED: To provide a method of constructing a bridge part track, which easily constructs a track with high vibrationproof performance in a bridge part.
      SOLUTION: This method of manufacturing a bridge part track comprises: a releasing means stacking step of installing a steel plate 7 as a releasing means on the upper surface of each of the vertical beam and the lateral beam 2 of the bridge part 1; a formwork forming step of forming a formwork for preventing the main beam web 3 of the bridge part 1 to be integrated when concrete is placed and forming the concrete in a plate shape on the laid steel plates 7 stacked on the vertical beam and the lateral beam 2; a jackup step of jacking up a floor slab concrete 9; a vibrationproof material installation step of disposing a vibrationproof material 10 in the gaps between the jacked up floor slab concrete 9 and the vertical beam and the lateral beam 2; and a jack-down step of jacking down the floor slab concrete 9. The vibrationproof material is easily installed between the vertical beam and the lateral beam of the bridge part and the floor slab concrete.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种构造桥接部分轨道的方法,其可以在桥接部分中容易地构建具有高防振性能的轨道。 解决方案:制造桥梁部件轨道的方法包括:释放装置堆叠步骤,在每个垂直梁和桥梁部分1的横梁2的上表面上安装作为释放装置的钢板7 ; 模板形成步骤,形成用于防止桥接部分1的主梁网3在形成混凝土时被整合的模板,并且在叠置在垂直梁上的铺设钢板7上形成板状的混凝土,并且横梁 2; 顶起一层楼板混凝土9的上升步骤; 防震材料安装步骤,将防震材料10设置在起升楼板混凝土9与垂直梁和横梁2之间的间隙中; 以及顶起落地板混凝土9的起落步骤。防振材料容易安装在垂直梁和桥梁部分和地板混凝土的横梁之间。 版权所有(C)2009,JPO&INPIT