会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Offshore deployment of extendable draft platforms
    • 离岸部署可扩展的平台
    • US06718901B1
    • 2004-04-13
    • US10292310
    • 2002-11-12
    • Phillip A. AbbottColin HoughStephane Alain Le GuennecJerome Q. BurnsPierre-Armand Thomas
    • Phillip A. AbbottColin HoughStephane Alain Le GuennecJerome Q. BurnsPierre-Armand Thomas
    • B63B3544
    • B63B35/44B63B9/065E02B17/06E02B17/0863
    • Deploying an offshore oil and gas production platform comprises placing a buoyant equipment deck on a buoyant pontoon so that elongated legs on the pontoon, each comprising a buoyant float, extend movably through respective openings in the deck. Chains extending from winches on the deck are reeved through fairleads on the pontoon and connected back to the deck. The chains are tightened to secure the deck to the pontoon for conjoint movement to an offshore location. The chains are loosened and the pontoon and leg floats ballasted so that the pontoon and leg floats sink below the floating deck. The chains are then re-tightened until pawls on the leg floats engage the deck. The buoyancy of at least one of the pontoon and leg floats is increased so that the deck is thereby raised above the surface of the water. The chains are connected to mooring lines around an offshore well site, and the raised deck and submerged pontoon are maintained in a selected position over the site with the winches.
    • 部署海上石油和天然气生产平台包括将漂浮的设备甲板放置在浮力浮筒上,使得浮筒上的细长的腿部(包括浮力浮子)可移动地延伸穿过甲板上的相应开口。 从甲板上的绞车延伸的链条通过浮桥上的通道进行连接并连接回甲板。 链条紧固以将甲板固定在浮桥上,以便联合移动到离岸位置。 链条松动,浮桥和腿部浮球被压载,浮桥和腿部浮动水槽沉没在浮动甲板下面。 然后将链条重新拧紧,直到腿部浮起的爪子与甲板接合。 浮筒和脚浮体中的至少一个的浮力增加,使得甲板从而升高到水面之上。 链条连接到离岸井场周围的系泊线,并且升高的甲板和淹没的浮筒通过绞车在现场保持选定的位置。
    • 2. 发明授权
    • Outer pipe sleeve for sea floor mooring pile
    • 海底系泊套管外套管
    • US08465229B2
    • 2013-06-18
    • US12741853
    • 2008-11-07
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • E02D5/64
    • B63B21/26E21B7/20
    • The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
    • 本公开提供了一种用于增加桩上的锚定力的改进的系统和方法。 关于桩的概念可以适用于桩是否退化并且不再能够支撑其预期载荷,或者桩上的载荷已经增加到可能过度施加桩的水平。 即使在海底条件下也可以安装套筒,并且可以用于为现有桩提供额外的固定力。 套筒可以包括用于将锚定线或其它联接构件联接到要固定的结构的自己的垫。 套筒还可包括与至少一个纵向构件联接在一起的环组件。 具有彼此隔开一定距离的环的组件可以有助于减小套筒上安装在海底上的安装摩擦力。
    • 3. 发明申请
    • OUTER PIPE SLEEVE FOR SEA FLOOR MOORING PILE
    • 用于海面运动桩的外管套管
    • US20110002742A1
    • 2011-01-06
    • US12741853
    • 2008-11-07
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • Alasdair MaconocieJohn OliphantPierre-Armand Thomas
    • E02D5/00
    • B63B21/26E21B7/20
    • The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
    • 本公开提供了一种用于增加桩上的锚定力的改进的系统和方法。 关于桩的概念可以适用于桩是否退化并且不再能够支撑其预期载荷,或者桩上的载荷已经增加到可能过度施加桩的水平。 即使在海底条件下也可以安装套筒,并且可以用于为现有桩提供额外的固定力。 套筒可以包括用于将锚定线或其它联接构件联接到要固定的结构的自己的垫。 套筒还可包括与至少一个纵向构件联接在一起的环组件。 具有彼此隔开一定距离的环的组件可以有助于减小套筒上安装在海底上的安装摩擦力。
    • 10. 发明申请
    • Structure For Transporting, Commissioning and Decommissioning the Elements of a Fixed Oil Platform and Methods For Implementing Such a Structure
    • 固定石油平台要素的运输,调试和停产结构及实施这种结构的方法
    • US20080131209A1
    • 2008-06-05
    • US10587589
    • 2004-12-30
    • Pierre-Armand Thomas
    • Pierre-Armand Thomas
    • E02B17/08
    • B63B35/003E02B17/0818E02B2017/0047E02B2017/0052
    • The invention relates to a structure for transporting, installing and dismantling a fixed oil platform provided with framework elements which are substantially formed by a bridge and at least one supporting pillar. The inventive structure comprises a floating U-shaped shell provided with at least three lifting legs adapted for resting upon the bottom of the sea and a shuttle movable along the lifting legs for displacing a platform element. Said shuttle consists of at least three elements each of which is associated with the lifting leg and is provided with mechanical means for driving on the corresponding lifting leg in a manner independent of the shell of the structure and with means for connecting to displaceable framework element. Methods for transporting, installing and dismantling the bridge or the supporting pillar of a fixed offshore oil platform are also disclosed.
    • 本发明涉及一种用于运输,安装和拆卸固定油平台的结构,该固定油平台设置有基本上由桥梁和至少一个支撑柱形成的框架元件。 本发明的结构包括浮动的U形外壳,其具有适于搁置在海底的至少三个提升腿和沿着提升腿移动的梭子,用于移动平台元件。 所述梭子由至少三个元件构成,每个元件与提升腿相关联,并且设置有用于以独立于结构的壳体的方式在相应的提升腿上行驶的机械装置以及用于连接到可移动的框架元件的装置。 还公开了固定式海上石油平台的桥梁或支柱的运输,安装和拆除方法。