会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Apparatus and method for monitoring the transfer of a material web
    • 用于监测材料网的传送的装置和方法
    • US07473335B2
    • 2009-01-06
    • US11233966
    • 2005-09-23
    • Tobias WankeUwe Joos
    • Tobias WankeUwe Joos
    • D21F11/00
    • D21G9/0063D21F5/042D21F7/04
    • A machine for producing and/or treating a material web, in particular of paper or board, in which the material web can be guided along a material web guide path by means of at least one material web guide device from a material web production section or material web input section, in order to pass at least one material web treatment device, having an apparatus for forming a transfer strip of the material web and transferring the transfer strip through the machine, it being possible for the material web to be transferred along the material web guide path in that, by means of the apparatus for forming and transferring the transfer strip, a leading transfer strip of the material web is formed and guided through the machine, and the width of the transfer strip is increased to the full material web width (what is known as “tail widening”), and having an apparatus for detecting a break in the material web. The apparatus for detecting a break in the material web is provided and designed for the purpose of responding to a break in the transfer strip or the material web during the transfer of the material web, in particular during the increase in the width of the transfer strip.
    • 一种用于生产和/或处理材料纤维网,特别是纸或纸板的机器,其中材料幅材可以通过至少一种材料幅材引导装置从材料幅材生产部分沿着材料幅材引导路径被引导或 材料幅材输入部分,为了通过至少一个材料幅材处理装置,具有用于形成材料幅材的转印带并将转印带传送通过机器的装置,材料幅材可以沿着 材料幅材引导路径,其中通过用于形成和传送转印带的装置,形成材料幅的前导转印带并将其引导通过机器,并且转印带的宽度增加到完整的材料幅材 宽度(所谓的“尾部加宽”),并且具有用于检测材料网中的断裂的装置。 用于检测材料幅材中的断裂的装置被提供和设计用于在材料幅材的转移期间响应于转印带或材料幅材中的断裂的目的,特别是在转印带宽度的增加期间 。
    • 6. 发明申请
    • APPARATUS AND METHOD FOR MONITORING THE TRANSFER OF A MATERIAL WEB
    • 用于监测材料网转移的装置和方法
    • US20090101299A1
    • 2009-04-23
    • US12330884
    • 2008-12-09
    • Tobias WankeUwe Joos
    • Tobias WankeUwe Joos
    • D21F7/04D21F7/06
    • D21G9/0063D21F5/042D21F7/04
    • A machine, for at least one of producing and treating a web of fibrous material in which the web is guided along a web guide path by at least one web guide device from one of a web production section and a web input section to pass at least one web treatment device, includes a first apparatus configured for forming a transfer strip of the web and for transferring the transfer strip through the machine, the machine being configured for transferring the web along the web guide path in that the first apparatus is configured for forming the transfer strip which is a leading transfer strip of the web, for guiding the transfer strip through the machine, and for increasing the transfer strip to a full width of the web and thereby performing tail widening; and a second apparatus configured for detecting a break in the web, the second apparatus being configured for responding to a break in one of the transfer strip and the web during a transfer of the web and during an increase in a width of the transfer strip.
    • 一种机器,用于生产和处理纤维材料纤维网中的至少一种,其中纤维网沿着幅材引导路径由至少一个幅材引导装置从幅材生产部分和幅材输入部分之一引导至少通过 一个卷材处理装置包括第一装置,该第一装置构造成用于形成幅材的转印带并用于将转印带传送通过机器,所述机器被配置为沿着幅材引导路径传送纸幅,因为第一装置被构造成用于形成 转印带是作为纸幅的导向转印带,用于引导转印带通过机器,并且用于将转印带增加到幅材的整个宽度,从而执行尾部加宽; 以及第二装置,其被配置为检测幅材中的断裂,第二装置被配置为响应于在幅材的转印期间和转印带的宽度增加期间在转印带和幅材之一上的断裂。
    • 7. 发明授权
    • Guidance system and process for controlling the lateral inclination on a
rail vehicle
    • 用于控制轨道车辆侧向倾斜的引导系统和过程
    • US5775230A
    • 1998-07-07
    • US687410
    • 1996-10-15
    • Uwe Joos
    • Uwe Joos
    • B60G99/00B61F5/22B61F5/00
    • B61F5/22
    • Upon the measurement of lateral acceleration conditions on a rail vehicle and the optimizing accordingly of the inclination of the load-bearing floor, problems result due to time delays between the measurement and the setting as well as to disturbances which are included in the measurement. They are eliminated in the manner that track data relevant to lateral inclination are stored in a track modeling memory (27) together with the actual position (I) detected, the track data relevant at that time or in the future are called up and the precise floor inclination (.alpha..sub.1) necessary at the time is calculated (29) as a function of the detected instantaneous speed (9) of the vehicle and set (11).
    • PCT No.PCT / CH95 / 00289 Sec。 371日期1996年10月15日 102(e)日期1996年10月15日PCT 1995年12月5日PCT PCT。 WO96 / 17761 PCT出版物 日期1996年6月13日在测量轨道车辆的横向加速度条件并相应地优化承载地板的倾斜度时,由于测量和设置之间的时间延迟以及包含的干扰而导致问题 在测量中。 它们以与横向倾斜相关的跟踪数据与检测到的实际位置(I)一起存储在轨道建模存储器(27)中的方式被消除,在那时或将来调用与之相关的轨迹数据, 根据车辆和组(11)的检测到的瞬时速度(9),计算(29)当时所需的地面倾斜度(α1)。