    • 1. 发明专利
    • Tunnel section widening method
    • 隧道段宽带化方法
    • JP2003041882A
    • 2003-02-13
    • JP2001228224
    • 2001-07-27
    • Pacific Consultants Co Ltdパシフィックコンサルタンツ株式会社
    • NAKAMURA HEIJIMASUNO MASAO
    • E21D9/06
    • PROBLEM TO BE SOLVED: To propose a tunnel section widening method which is carried out at a low construction cost while minimizing an influence on an atmosphere on the ground.
      SOLUTION: According to the tunnel section widening method for providing a width-spread tunnel at a partial section in a main tunnel, a width-spread tunnel lining having a U-shaped cross section, is constructed at a location adjacent to a main tunnel lining by arranging an opening surface of the width-spread tunnel in a manner opening toward a virtual construction location of the main tunnel lining. Then, the main tunnel lining is constructed according to a shield tunneling method by making contact with extreme tips of upper and lower floor slabs of the width-spread tunnel lining.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提出以低建设成本进行的隧道段拓宽方法,同时最小化对地面上的气氛的影响。 解决方案:根据用于在主隧道中部分部分设置宽度扩展隧道的隧道截面加宽方法,在与主隧道衬砌相邻的位置处构造具有U形横截面的宽度扩展隧道衬砌 通过以向主隧道衬里的虚拟构造位置开放的方式布置宽度扩展隧道的开口表面。 然后,主隧道衬砌采用屏蔽隧道法,通过与宽幅隧道衬砌上,下层楼板的顶端接触。
    • 3. 发明专利
    • GROUND WATER FLOWING DOWN DEVICE
    • JP2002235333A
    • 2002-08-23
    • JP2001030610
    • 2001-02-07
    • PACIFIC CONSULTANTS CO LTD
    • NAKAMURA HEIJIMASUNO MASAO
    • E02D31/02E02D5/20
    • PROBLEM TO BE SOLVED: To provide a ground water flowing down device capable of eliminating an evil effect in the case a ground water vein is cut off by constructing an underground structure, at the same time, making maintenance and being restored to the initial efficiency. SOLUTION: The ground water flowing down device is constituted of a plurality of upstream side shafts and downstream side shafts set at a predetermined interval along the side of the underground structure, a collecting pipe connected to both upper stream side shafts, collecting the ground water from a sandy soil layer and collected to the upstream side shafts, a water pipe connected to both upstream side shaft and downstream side shaft and making the ground water collected to the upstream side shafts flow down to the downstream side shafts and a drain pipe connected to a plurality of downstream side shafts and making the ground water flow from the upstream side shafts and making the ground water flowing from the upstream side shafts infiltrate into the downstream side sandy soil layer.