会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method and structure for anchoring structural member for supporting
    • 用于支撑结构构件的方法和结构
    • JP2008075385A
    • 2008-04-03
    • JP2006257450
    • 2006-09-22
    • Ohbayashi CorpSumitomo Metal Ind Ltd住友金属工業株式会社株式会社大林組
    • YOSHIDA YOICHITASAKA MIKIOIZAWA MASAYOSHIIWAHASHI MASAYOSHIMORIMOTO ISAHIKOKAMIJO TAKASHI
    • E21D9/04E21D9/01E21D9/06E21D13/02
    • PROBLEM TO BE SOLVED: To provide a method and a structure for anchoring a structural member for supporting capable of supporting a portion to be cut and capable of compactly and easily constructing an anchoring portion. SOLUTION: A sheath pipe 10 is fitted to a segment 12 in each of shield tunnels 2, 4 arranged parallel to each other. Steel pipes 6 for installation are so installed between the second shield tunnel 4 and the first shield tunnel 2 as to be inserted into the sheath pipes 10. A structural member 18 for supporting is inserted into the steel pipes 6 for installation. The end of the structural member 18 for supporting projects from the sheath steel pipe 10. A cover plate 22 is connected to the end. The cover plate 22 is fixed to a predetermined position in the sheath steel pipes 10. A solidifying agent 26 is charged between the sheath pipe 10 and the structural member 18 for supporting. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种用于锚定支撑结构构件的方法和结构,其能够支撑待切割的部分并且能够紧凑且容易地构造锚定部分。 解决方案:护套管10装配到彼此平行布置的每个屏蔽隧道2,4中的段12上。 用于安装的钢管6安装在第二屏蔽隧道4和第一屏蔽隧道2之间以插入护套管10中。用于支撑的结构构件18插入到钢管6中用于安装。 用于从护套钢管10支撑突起的结构构件18的端部。盖板22连接到端部。 盖板22固定在鞘钢管10中的预定位置。固化剂26被填充在护套管10和用于支撑的结构构件18之间。 版权所有(C)2008,JPO&INPIT
    • 5. 发明专利
    • Water cut-off structure and water cut-off method
    • 水切割结构和水切割方法
    • JP2011132692A
    • 2011-07-07
    • JP2009291031
    • 2009-12-22
    • Ohbayashi CorpToso:Kk株式会社トーソー株式会社大林組
    • NAKAMURA TETSUYAIZAWA MASAYOSHINAKANO KOJIKAWAGUCHI TAKUYAKIMURA TSUTOMUKUROMATSU KATSURO
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a water cut-off structure and a construction method of it for solidifying or melting a filler efficiently in a short time and ensuring water cut-off performance.
      SOLUTION: This water cut-off structure 1 includes a bulkhead 4 installed in a pit 3 across a predetermined interval from a pit mouth 2, a cylindrical body 6 having larger inside diameter than outside diameter of a shield machine 5 and having one end and the other end connected with the bulkhead 4 and the pit mouth 2, respectively, the meltable filler 7 provided between an inner peripheral face of the cylindrical body 6 and an outer peripheral face of the shield machine 5, a ring-like elastic sealing material 8 having smaller inside diameter than outside diameter of the shield machine 5 and provided between the inner peripheral face of the cylindrical body 6 and the outer peripheral face of the shield machine 5, an adjusting means 9 provided between the inner peripheral face of the cylindrical body 6 and the outer peripheral face of the shield machine 5 and having a pit mouth side end part connected with the elastic sealing material 8 to turn a central part in the cylindrical body 6, and a melting means 10 supplying a melting agent for melting the filler 7.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种截水结构及其在短时间内有效凝固或熔化填料的结构方法,并确保截水性能。 解决方案:该截水结构1包括从坑口2预定间隔安装在坑3中的隔板4,具有比屏蔽机5的外径更大的内径的圆筒体6,并具有一个 端部和另一端分别与隔板4和凹坑2连接,设置在圆筒体6的内周面与屏蔽机5的外周面之间的可熔填充物7,环状弹性密封 材料8,其内径比屏蔽机5的外径小,设置在圆筒体6的内周面与屏蔽机5的外周面之间;调节机构9,设置在圆筒状的内周面 主体6和屏蔽机5的外周面,并且具有与弹性密封材料8连接的凹坑口侧端部,以使圆筒体6中的中心部分转动, 以及熔化装置10,其供应用于熔化填料7的熔化剂。版权所有:(C)2011,JPO&INPIT
    • 6. 发明专利
    • Method and structure for preventing deformation of ground
    • 防止地面变形的方法和结构
    • JP2010126998A
    • 2010-06-10
    • JP2008303011
    • 2008-11-27
    • Ohbayashi Corp株式会社大林組
    • IZAWA MASAYOSHIMIKI KEIZOYOKOMIZO FUMIYUKIKIMURA TSUTOMUYOSHIDA KIMIHIRO
    • E21D9/04E21D9/02
    • PROBLEM TO BE SOLVED: To provide a method and a structure for preventing deformation of ground, which can inexpensively and easily prevent the deformation of the surrounding ground when a shield machine is propelled. SOLUTION: A tunnel 4, which is to be bored by the shield machine 3 starting from the ground and reaching the ground, includes a down approach section 7 which has a down-grade for reaching a predetermined depth from a ground starting section 5, a tunnel section 8 which is constructed at the predetermined depth, and an up-approach section 9 which has an up-grade for reaching a ground arrival section 6 from a terminal end of the tunnel section 8. Protective barriers 2 for preventing the deformation of the surrounding ground E are provided on both the axial-direction-of-tunnel sides of excavation-planned areas 10 of both the approach sections 7 and 9, respectively. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种用于防止地面变形的方法和结构,其可以廉价且容易地防止当屏蔽机器被推进时周围地面的变形。 解决方案:从地面开始并到达地面的要被屏蔽机3钻孔的隧道4包括一个向下接近部分7,该下部接近部分7具有从地面开始部分达到预定深度的低档 5,以规定深度构造的隧道部8,以及从隧道部8的终端到达地面到达部6的上坡的上部接近部9。 两个接近部分7和9的挖掘规划区域10的隧道两侧分别设置周围地面E的变形。 版权所有(C)2010,JPO&INPIT
    • 8. 发明专利
    • Boring machine and boring device using the same
    • 镗孔机和钻孔装置
    • JP2008121356A
    • 2008-05-29
    • JP2006308480
    • 2006-11-14
    • Alpha Civil Engineering:KkOhbayashi Corp株式会社アルファシビルエンジニアリング株式会社大林組
    • FUKUMOTO KATSUJIMATSUMOTO SHINIZAWA MASAYOSHISAKAI EIJITOKIEDA NAOTOSAKAKIBARA MASATAKAMATSUMOTO FUMIHIKO
    • E21D9/08E21D9/06E21D9/087E21D9/13
    • PROBLEM TO BE SOLVED: To provide a boring machine capable of drilling an underground hole having a rectangular section, and a boring device capable of minimizing bad effects on a tunnel shielding material with a relatively small required space within a tunnel. SOLUTION: The boring device 20 forms a circular underground beam 12 in a natural ground 11 by propelling a rectangular sectional circular short pipe including a thrust transmission pipe provided with the boring machine at the tip from a start mouth 94 opened in a wall surface 10 located near the bottom of a tunnel T. A start frame 30 disposed in a position facing the start mouth 94 within the tunnel T includes a base pushing jack 22 for propelling the thrust transmission pipe from the start mouth 94 toward the natural ground 11, a guide rail and a guide roller for propelling the thrust transmission pipe toward the natural ground 11 along a preset curvature radius, and a retaining means for retaining the circular short pipe in a fixed attitude relative to the thrust transmission pipe. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种能够钻探具有矩形截面的地下孔的钻孔机,以及能够最小化对隧道内具有相对小的所需空间的隧道屏蔽材料的不良影响的钻孔装置。 解决方案:钻孔装置20在自然地面11中形成圆形的地下梁12,该方法通过在从墙壁上开口的起始口94推动包括设置有钻孔机的推力传递管的矩形截面圆形短管 表面10位于隧道T的底部附近。设置在隧道T内面向起始嘴94的位置的起始框架30包括用于将推力传递管从起始口94向自然地面11推动的基座推动孔22 ,用于沿着预设的曲率半径将推力传递管推向自然地面11的导轨和导辊,以及用于将圆形短管相对于推力传递管保持在固定姿态的保持装置。 版权所有(C)2008,JPO&INPIT
    • 10. 发明专利
    • Shape holding device of segment and shape holding method of the segment making use thereof
    • 形状分段的形状保持装置和形状使用其分段的保持方法
    • JP2007092366A
    • 2007-04-12
    • JP2005282244
    • 2005-09-28
    • Ohbayashi Corp株式会社大林組
    • KANAI MAKOTOMIKI KEIZOIZAWA MASAYOSHIHAYASHI SEITAKUSAKAMOTO MASAAKIKOGA HIROSHI
    • E21D11/40
    • PROBLEM TO BE SOLVED: To provide a shape holding device of a segment capable of improving workability of tunnel construction, at the same time, holding the newest shape of the segment in a state to continue a shape holding effect of the segment assembled immediately before and a shape holding method of the segment making use of the shape holding device.
      SOLUTION: The shape holding device 31 is equipped with a supporting frame 35 having one end connected to a vertical beam 33 installed in a tail section 5 of a shield machine 1 and the other end projected backward of the shield machine 1, a pair of right and left vertical expansion means 37 capable of being expanded and contracted in the vertical direction and mounted to the supporting frame 35, each bracket 39 connected to the upper end section of each vertical expansion means 37 in front and behind in the direction of movement of the shield machine 1 in a movable manner by pin connection, two sliding sections 43 connected to the upper parts of the brackets 39, abutted to the inside of the segment 13, at the same time, provided with slidable sliding bodies 41 along the inside and two sliding sections 43 connected to the lower end sections of the vertical expansion means 37.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了提供能够改善隧道施工的可加工性的部分的形状保持装置,同时将段的最新形状保持在状态以继续组装的段的形状保持效果 并且使用形状保持装置的片段的形状保持方法。 形状保持装置31具有支撑框架35,该支撑框架35的一端连接到安装在屏蔽机1的尾部5中的垂直梁33,另一端投射到屏蔽机1的后方, 一对左右垂直扩展装置37,其能够在垂直方向上伸缩,并安装到支撑框架35,每个支架39在每个垂直扩展装置37的上端部分的前后方向上连接 屏蔽机1以可移动的方式通过销连接而移动,与支架39的上部连接的两个滑动部分43相对于节段13的内侧,同时具有可滑动的滑动体41 内部和两个滑动部分43连接到垂直扩展装置37的下端部分。版权所有(C)2007,JPO&INPIT