会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Tunnel widening method and tunnel widening structure
    • 隧道施工方法及隧道施工结构
    • JP2013221240A
    • 2013-10-28
    • JP2012091167
    • 2012-04-12
    • Ohbayashi Corp株式会社大林組
    • TAKAHAMA TATSUYAFUJII TAKESHIISO YOSHINOBUITO KATSUYA
    • E21D9/06
    • PROBLEM TO BE SOLVED: To enable tunnel widening work with good constructing efficiency.SOLUTION: A tunnel widening method includes executing a first step of driving first anchor bolts 27 into the natural ground side faces of a region 23 formed by excavation in tunnel axial directions to form first trench-shaped regions, and constructing predetermined-width first skeletons in the first trench-shaped regions, a second step of, while excavating a natural ground 1 ranging from widening scheduled positions adjacent to the first trench-shaped regions at predetermined intervals to the outside of a tunnel, into predetermined-width trench shapes, fixing to the natural ground side faces the ends of the first anchor bolts 27 exposed to one natural ground side face of the region formed by the excavation to form tie-rods, driving anchor bolts in the other natural ground side face of the region in the tunnel axial directions to form second trench-shaped regions, and constructing predetermined-width second skeletons in the second trench-shaped regions, and a third step of excavating the natural ground integrated with the tie-rods while removing the tie-rods, and constructing skeletons between the first skeletons and the second skeletons.
    • 要解决的问题:使隧道加宽工作具有良好的构造效率。解决方案:隧道扩宽方法包括执行第一步骤,将第一锚定螺栓27驱动到通过隧道轴向方向挖掘形成的区域23的自然地面侧面, 形成第一沟槽状区域,并且在第一沟槽状区域中构造预定宽度的第一骨架,第二步骤,在以预定间隔从与第一沟槽状区域相邻的预定位置变宽的自然地面1挖掘时, 隧道的外部形成预定宽度的沟槽形状,固定到自然地面,面向暴露于由挖掘形成的区域的一个自然地面侧面的第一锚定螺栓27的端部,以形成拉杆,驱动锚 螺栓在隧道轴向方向上的区域的另一自然地面侧,形成第二沟槽状区域,构成预定宽度 在第二沟槽状区域中的第二骨架,以及在移除拉杆的同时挖掘与拉杆一体化的自然地面并在第一骨架和第二骨架之间构造骨架的第三步骤。
    • 3. 发明专利
    • Method and structure for reinforcing segment
    • 加强分段的方法和结构
    • JP2010101023A
    • 2010-05-06
    • JP2008271267
    • 2008-10-21
    • Ohbayashi Corp株式会社大林組
    • YOSHIDA KIMIHIROKAWAKAMI SUENOBUINA HIROSUKETAKAHAMA TATSUYA
    • E21D11/04
    • PROBLEM TO BE SOLVED: To provide a method for reinforcing a segment which bears a horizontal compressive force during the excavation of a shallow location and can be efficiently installed, and a reinforcing structure constructed by the method. SOLUTION: The structure 2 for reinforcing the segment 1 in a tunnel 3 reinforces the segment 1 which is annularly laid in the tunnel 3 bored by a shield machine 10 and covered with soil in low height. A horizontally-installed permanent beam 4 is provided in the segment 1. The rod-like permanent beam 4 is installed in the segment 1 in such a manner that its longitudinal direction is orthogonal to the axial direction of the tunnel 3. In this embodiment, the permanent beams 4 which comprise first and second permanent beams 4a and 4b installed in the inside lower and upper portions of the segment 1, respectively, are installed in segment rings 1b on a one-by-one basis, respectively. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种用于加强在浅位置的挖掘期间承受水平压缩力并且可以有效地安装的段的方法,以及通过该方法构造的加强结构。 解决方案:用于加固隧道3中的段1的结构2加强了环形铺设在由屏蔽机10钻孔的隧道3中并被低高度的土壤覆盖的段1。 水平安装的永久梁4设置在段1中。杆状永久梁4以其纵向方向与隧道3的轴向正交的方式安装在段1中。在该实施例中, 分别安装在片段1的内侧下部和上部的分别包括第一和第二永久杆4a和4b的永久梁4分别以一个一个的方式安装在节环1b中。 版权所有(C)2010,JPO&INPIT
    • 4. 发明专利
    • Tunnel widening method and tunnel widening structure
    • 隧道施工方法及隧道施工结构
    • JP2013221241A
    • 2013-10-28
    • JP2012091168
    • 2012-04-12
    • Ohbayashi Corp株式会社大林組
    • TAKAHAMA TATSUYAFUJII TAKESHIISO YOSHINOBUITO KATSUYA
    • E21D9/06E21D9/04
    • PROBLEM TO BE SOLVED: To enable tunnel widening work with good constructing efficiency.SOLUTION: A tunnel widening method includes executing a first step of performing the installation of pipe roofs 16 on a natural ground 1 in tunnel axial directions and chemical injection thereinto to apply water stop treatment to widening scheduled positions, a second step of driving first anchor bolts 27 into the natural ground side faces of a region 23 formed by excavation in the tunnel axial directions to form first trench-shaped regions, and constructing predetermined-width first skeletons in the first trench-shaped regions, a third step of, while excavating the natural ground 1 ranging from the first trench-shaped regions into predetermined-width trench shapes, fixing to the natural ground side faces the ends of the first anchor bolts 27 exposed to one natural ground side face of the region formed by the excavation to form tie-rods, driving anchor bolts in the other natural ground side face of the region in the tunnel axial directions to form second trench-shaped regions, and constructing predetermined-width second skeletons in the regions, and a fourth step of excavating the natural ground integrated with the tie-rods while removing the tie-rods, and constructing skeletons.
    • 要解决的问题:使隧道拓宽工作具有良好的构造效率。解决方案:隧道拓宽方法包括执行在隧道轴向上在自然地面1上安装管道屋顶16并在其中进行化学注入以施加水的第一步骤 停止处理以扩大预定位置,第二步骤将第一锚定螺栓27驱动到通过在隧道轴向方向上挖掘而形成的区域23的自然地面侧面中,以形成第一沟槽状区域,并且构建预定宽度的第一骨架 第一沟槽区域,第三步骤,在从第一沟槽状区域到预定宽度的沟槽形状挖掘自然地面1的同时,固定到自然地面,面向第一锚定螺栓27的暴露于 通过挖掘形成的区域的一个自然地面侧面形成拉杆,在t的另一自然地面侧面驱动地脚螺栓 在区域中形成第二沟槽状区域,并且在该区域中构造预定宽度的第二骨架;以及第四步骤,在移除拉杆的同时挖掘与拉杆一体化的自然地面,并构造 骨骼。