    • 1. 发明专利
    • TENSION GRIP FOR HOLLOW PC STEEL BAR
    • JPH07139173A
    • 1995-05-30
    • JP30708793
    • 1993-11-15
    • ORIENTAL CONSTR CO LTDHIGH FREQUENCY HEATTREAT
    • YOKOTA TSUTOMUTEZUKA MASAMICHIIMAI AKIFUMI
    • E04C5/12E04G21/12
    • PURPOSE:To give prestress to a hollow PC steel bar through a pre-tension system by a small-sized tension grip having a simple structure. CONSTITUTION:A bearing base 3 having a hollow PC steel-bar inserting groove 2 is fixed at one end section of a support base 1, a jack cradle bearing the cylinder of a jack for pushing-in is fastened at the other end section of the support base 1, and a bearing base having a hollow PC steel-bar inserting groove 7 is settled to the intermediate section of the support base 1. A bearing pressure board 10 engaged with the bearing base 3 and a stopper 12 engaged at one end section of a PC steel bar 11 inserted into a hollow PC steel bar 9 are fixed detachably at one end section of the hollow PC steel bar 9. A bearing cylinder 15 having a female screw at one end section is screwed to a male screw on the outside of the other end section of the hollow PC steel bar 9, and a pushing engaging piece 16 fitted at the other end section of the PC steel bar 11 is arranged into the intermediate section of the bearing cylinder 15. An annular engaging piece 17 is screwed at the other end section of the bearing cylinder 15, and a pushing member 19 pushed by a piston lever 18 for the jack 4 for pushing-in is inserted to the annular engaging piece 17.
    • 6. 发明专利
    • Connection structure of pc steel bar and prestressed concrete construction
    • PC钢条和预制混凝土结构的连接结构
    • JP2005282023A
    • 2005-10-13
    • JP2004094731
    • 2004-03-29
    • High Frequency Heattreat Co LtdOriental Construction Co Ltdオリエンタル建設株式会社高周波熱錬株式会社
    • YOKOTA TSUTOMUOSHIDA HIDEJIGO SHIYOUNEITANAKA NORIO
    • E04C5/08E04C5/18
    • PROBLEM TO BE SOLVED: To provide a connection structure of a PC steel bar and a prestressed concrete construction capable of lessening possibility of the interference with reinforcement in a joint part between compressed PC steel bars and, at the same time, decreasing the partial loss of area for connecting the compressed PC steel bars to each other as much as possible.
      SOLUTION: In the connection structure of the PC steel bars 4 and 5 used for introducing tensile pre-stress to the compression side of a concrete member, a plurality of PC steel bar insertion pipes 6 and 7 are respectively inserted in both ends of a thick short pipe 8 to screw them to each other, a plurality of PC steel bars are respectively inserted in the PC steel bar insertion pipes so that the front end faces can be abutted on each other in the middle part of the inside of the thick short pipe, spaces among the PC steel bar insertion pipes, the thick short pipe and a plurality of PC steel bars are filled with anticorrosives, and when compressive stress is introduced to a plurality of PC steel bars, the front end faces are closely connected to each other.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供PC钢筋和预应力混凝土结构的连接结构,能够减轻压缩PC钢筋之间的接合部分中的加强干扰的可能性,并且同时减少 尽可能地将压缩的PC钢筋彼此连接的部分损失区域。 解决方案:在用于将拉伸预应力引入混凝土构件的压缩侧的PC钢棒4和5的连接结构中,多个PC钢棒插入管6和7分别插入两端 一个较厚的短管8将它们彼此拧紧,多个PC钢筋分别插入PC钢棒插入管中,使得前端面可以在内侧的中间部分彼此抵接 粗短管,PC钢棒插入管,粗短管和多个PC钢条之间的空间填充有防腐蚀剂,当压缩应力引入多个PC钢筋时,前端面紧密连接 对彼此。 版权所有(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Post-compressing system and post-compressing construction method
    • 后压系统和压缩后施工方法
    • JP2005282022A
    • 2005-10-13
    • JP2004094719
    • 2004-03-29
    • High Frequency Heattreat Co LtdOriental Construction Co Ltdオリエンタル建設株式会社高周波熱錬株式会社
    • YOKOTA TSUTOMUOSHIDA HIDEJITANAKA NORIO
    • E04G21/12
    • PROBLEM TO BE SOLVED: To provide a system for a post-compressing construction method capable of pushing in a PC steel bar by a jack, even if a recessed part as a jack installing space is not formed in a concrete member.
      SOLUTION: The concrete member 4 is provided with the recessed part 3 for operating an anchoring nut 2 threadedly engaged with the compressed PC steel bar 1. A pipe body 6 for inserting a rod 5a of the jack 5 is arranged in the concrete member so that one end of the pipe body projects from an end part of the concrete member on the same axis as the compressed PC steel bar. A first receiving part 7 is arranged on the projecting end of the pipe body, and a second receiving part 5b is arranged in a position opposed to the first receiving part in the jack. The jack for inserting the rod into the pipe body is detachably fixed by a connecting member 8 having engaging parts 8a and 8b detachably locking on the first and second receiving parts.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:即使在混凝土构件中没有形成作为千斤顶安装空间的凹部,也能够提供能够通过千斤顶将PC钢棒推压的后压缩构造方法的系统。 解决方案:混凝土构件4设置有用于操作与压缩PC钢棒1螺纹接合的锚固螺母2的凹部3.用于插入千斤顶5的杆5a的管体6布置在混凝土中 使得管体的一端从与混凝土构件的端部在与压缩PC钢棒相同的轴线上突出。 第一容纳部7布置在管体的突出端上,第二接收部5b布置在与插座中的第一接收部相对的位置。 用于将杆插入管体的千斤顶通过具有可拆卸地锁定在第一和第二接收部分上的接合部分8a和8b的连接构件8可拆卸地固定。 版权所有(C)2006,JPO&NCIPI