会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Temporary bridge adjustable in length and its construction method
    • 长期可调节的桥梁及其施工方法
    • KR100948895B1
    • 2010-03-24
    • KR20090048053
    • 2009-06-01
    • O K CONSULTANT CO LTDKIM YUN HWAN
    • KIM SEOK TAEKIM YUN HWANKIM HONG CHUL
    • E01D21/00E01D2/00E04C3/04
    • E01D21/00E01D2/00E01D2/02E04C3/04
    • PURPOSE: A length-variable temporary bridge using steel beams and a construction method thereof are provided to easily control the length of steel beams without loss of material and to enable recycle of the steel beams without area reduction. CONSTITUTION: A construction method of a length-variable temporary bridge(100) is as follows. Studs(112) welded to both ends of a central segment(110) are connected to studs(122) welded to end segments(120) using splice plates(130) and nuts(135). The end segments are connected corresponding to the designated length of the temporary bridge. An intermediate anchoring device(180) is fixed to the central segment and end anchoring devices(150) are installed on the end segments so that the load resistance is enhanced by tension members(152).
    • 目的:提供一种使用钢梁的长度可变的临时桥梁及其施工方法,以便轻松控制钢梁的长度,而不会损失材料,并且能够在不减少面积的情况下回收钢梁。 构成:长距离临时桥梁(100)的施工方法如下。 焊接到中心段(110)的两端的螺柱(112)使用接合板(130)和螺母(135)连接到焊接到端部段(120)的螺柱(122)。 端段相应于临时桥的指定长度连接。 中间锚固装置(180)固定到中心部分,并且端部锚定装置(150)安装在端部段上,使得由张力构件(152)增强负载阻力。
    • 2. 发明授权
    • Bikeway using longitudinal girder with different height and pile and construction method therefor
    • 使用具有不同高度和长度的纵向吉他的BIKEWAY及其构造方法
    • KR101171041B1
    • 2012-08-06
    • KR20120034143
    • 2012-04-02
    • KIM YUN HWANO K CONSULTANT CO LTD
    • KIM SEOK TAEKIM YUN HWANCHUNG WON YONG
    • E01C1/00E01D19/10
    • E01D19/10E01C1/002E01C15/00E01D19/103
    • PURPOSE: A bike lane used a mold in which section height is different with a pile and a method for manufacturing the same are provided to efficiently distribute load by extending a spaced distance of a pile in a longitudinal direction. CONSTITUTION: A bike lane(100) used a mold in which section height is different with a pile comprises a pile(110), a fixing bracket(120), a lower cross beam(130), a girder for a bracket(140), a girder for a pile(150), an upper cross beam(60), a channel member(170), and a deck(180). The pile is installed in a lateral side of an abutment and a pier of a bridge(200). The fixing bracket is in an upper lateral surface of a bridge by being spaced in a longitudinal direction. The lower cross beam is installed in between the pile, the abutment and the pier to a traversal direction, thereby connecting the pile and the bridge. The girder for a bracket is installed to be supported in the fixing bracket, thereby being spaced from each other in the longitudinal direction. The girder for a pile is supported in the pile, thereby being successively installed in the traversal direction. The upper cross beam connects the girder for the bracket and the girder for the pile each other in a longitudinal direction. The channel member is extended to the traversal direction on the top of the cross beam, thereby being installed. The deck is extended to the traversal direction on the top of the channel member, thereby being installed.
    • 目的:自行车道使用一种模具,其中,桩的高度不同,并且其制造方法被提供以通过沿纵向方向延伸桩的间隔距离来有效地分配载荷。 构成:自行车道(100)使用模具,桩的高度不同的模具包括桩(110),固定支架(120),下横梁(130),支架用梁(140) ,用于桩(150)的梁,上横梁(60),通道构件(170)和甲板(180)。 该桩安装在基台的横向侧面和桥(200)的码头上。 固定支架通过在纵向方向间隔开而位于桥的上侧表面中。 下横梁安装在桩,桥台和墩之间穿过方向,从而连接桩和桥。 用于支架的梁被安装成支撑在固定支架中,从而在纵向上彼此间隔开。 桩的支撑被支撑在桩中,从而依次安装在横向上。 上横梁连接用于支架的梁和纵向方向的桩彼此连接。 通道构件在横梁的顶部延伸到横向,从而被安装。 甲板在通道构件的顶部延伸到穿过方向,从而被安装。
    • 3. 发明授权
    • Continuous construction method of psc composite concrete girders by using a precast cross-beam
    • PSC复合混凝土梁的连续施工方法
    • KR100948896B1
    • 2010-03-24
    • KR20090048055
    • 2009-06-01
    • O K CONSULTANT CO LTDKIM YUN HWAN
    • KIM SEOK TAEKIM YUN HWAN
    • E01D2/00E01D21/00
    • E01D2/00E01D2/02E01D21/00E01D22/00E01D2101/28
    • PURPOSE: A continuous construction method of PSC(PreStressed Concrete) girders using a precast cross beam is provided to easily secondarily prestress a bridge with a plurality of spans. CONSTITUTION: A continuous construction method of PSC girders using a precast cross beam comprises the steps of: manufacturing a plurality of PSC girders(110) with first strands(112) and continuation strands(115) drawn out by a certain length, manufacturing a precast concrete cross beam(150) and fixing it on a permanent bearing(122) formed on the top of a pier(120), placing the PSC girders from the inner side to the outer side of the cross beam, filling shrinkage compensating mortar in an empty space between the cross beam and each PSC girder, and settling the continuation strand in the cross beam.
    • 目的:提供使用预制横梁的PSC(预应力混凝土)桁梁的连续施工方法,以容易地对具有多个跨度的桥进行二次预应力。 构成:使用预制横梁的PSC桁架的连续施工方法包括以下步骤:用一定长度拉出的第一股(112)和连续股(115)制造多个PSC桁架(110),制造预制件 混凝土横梁(150)并将其固定在形成在墩(120)的顶部上的永久轴承(122)上,将PSC桁架从横梁的内侧放置到外侧,填充收缩补偿砂浆 在横梁和每个PSC大梁之间的空白空间,并且在横梁中沉降连续股。
    • 4. 发明授权
    • Construction method for supports of temporary bridge dealing with thermal strain
    • 支撑热应变的桥梁桥梁施工方法
    • KR100949292B1
    • 2010-03-23
    • KR20090048054
    • 2009-06-01
    • O K CONSULTANT CO LTDKIM YUN HWAN
    • KIM SEOK TAEKIM YUN HWANKIM JAE SUNG
    • E01D19/04F16F15/02
    • E01D19/04E01D19/042E01D19/043E01D19/046E01D21/00F16F15/02
    • PURPOSE: A construction method for the supports of a temporary bridge dealing with thermal strain is provided to reduce the stress of the supports and prevent the supports from being twisted by effectively removing horizontal load and vertical load which are generated by temperature change. CONSTITUTION: A construction method for the supports of a temporary bridge dealing with thermal strain comprises following steps. A first supporter(135), an elastic bearing(140), and a second supporter(145) are perforated by plural fixing bolts(160) and are fixed by nuts(170) between the bottom of the lower flange(120a) of an upper beam(120) and an upper flange(115a) of a strut(115). The supports are freely moved by controlling the horizontal load and the vertical load due to temperature change using the elastic bearing.
    • 目的:提供一种处理热应变的临时桥梁支撑的施工方法,以减少支撑的应力,防止支架受到扭曲,有效消除温度变化产生的水平荷载和垂直载荷。 构成:处理热应变的临时桥梁的支撑的施工方法包括以下步骤。 第一支撑件(135),弹性轴承(140)和第二支撑件(145)由多个固定螺栓(160)穿孔,并通过螺母(170)固定在下凸缘(120a)的底部 上梁(120)和支柱(115)的上凸缘(115a)。 通过使用弹性轴承控制由于温度变化引起的水平载荷和垂直载荷,自由移动支撑件。
    • 5. 发明公开
    • SYSTEM OF RAISING EACH SPAN BY CONTROLLING COMPUTER MEASUREMENTS IN THE CONTINUOS BEAM
    • 通过控制连续波束中的计算机测量来提高每个跨度的系统
    • KR20070117964A
    • 2007-12-13
    • KR20060052249
    • 2006-06-10
    • O K CONSULTANT CO LTD
    • KIM YUN HWANAN SEOUNG SU
    • E01D19/00E01D19/02E01D19/06E02D19/14
    • E01D22/00B66F3/46B66F2700/05
    • A system of lifting each spans according to measurements and controls by a computer is provided to allow lift differences on each points and on each support points to be within allowable errors while independently compensating for the differences in lift by a main control computer analyzing the differences measured by displacement meters and controlling electric valves built in electric control distributors to compensate for the differences, and to prevent overloading hydraulic jacks by installing contact sensing devices to detect malfunctions of the hydraulic jacks. Electric controlled distributors, displacement meters, and contact sensing devices are directly connected to a main control computer. The electric control distributors are controlled by the main control computer, whereas hydraulic pumps are controlled by the electric control distributors. The hydraulic pumps operate hydraulic jacks to lift the upper structures of a bridge. The hydraulic pumps allow difference in lift on each points and on each support points to be within the allowable error. The difference in lift on each points and on each support points are measured by the displacement meters installed on the measurement reference surfaces. The measurements are then analyzed by the main control computer. The main control computer controls electric valves built in the electric control distributors with the new analyzed data to compensate the errors on each points and on each support points. Lift speed controlling valves and error compensating valves are built in the electric control distributors. The displacement meters have lower ends installed on the measurement reference surface, while upper ends are installed to lower parts of the upper structures. The contact sensing devices are installed on upper ends of strokes of the hydraulic jacks and on lower surfaces of the upper structures.
    • 提供根据计算机的测量和控制提升每个跨度的系统,以允许每个点和每个支撑点上的升力差在允许的误差范围内,同时主要控制计算机分析补偿差异 通过位移仪表和控制内置在电气控制分配器中的电动阀来补偿差异,并通过安装接触检测装置来检测液压千斤顶的故障来防止液压千斤顶过载。 电控分配器,位移计和接触检测装置直接连接到主控计算机。 电控分配器由主控电脑控制,液压泵由电控分配器控制。 液压泵操作液压千斤顶以提升桥的上部结构。 液压泵允许每个点和每个支撑点上的电梯差异在允许的误差范围内。 每个点和每个支撑点上的升力差异由安装在测量参考表面上的位移仪测量。 然后通过主控计算机对测量结果进行分析。 主控电脑控制内置在电控分配器中的电动阀,并附有新的分析数据,以补偿每个点和每个支撑点的误差。 提升速度控制阀和误差补偿阀内置在电气控制分配器中。 位移仪具有安装在测量基准表面上的下端,而上端安装在上部结构的下部。 接触检测装置安装在液压千斤顶的行程的上端和上部结构的下表面上。
    • 7. 发明申请
    • RGB PRINTING METHOD USING PLASMA PRETREATMENT AND PLASMA APPARATUS THEREFOR
    • 采用等离子预处理的RGB打印方法及其等离子体装置
    • WO2012141436A3
    • 2012-12-13
    • PCT/KR2012002208
    • 2012-03-27
    • SEP INCLEE SANG ROKIM YUN HWANYIM CHAN JOO
    • LEE SANG ROKIM YUN HWANYIM CHAN JOO
    • B41M1/14
    • H01L51/0005B41M5/0011G02F1/133516H01L27/3211
    • The present invention relates to an RGB printing method using plasma pretreatment and a plasma apparatus therefor, and specifically to: a RGB printing method using plasma pretreatment which comprises a) forming organic partitions on an inorganic substrate, b) hydrophilizing the surface of the substrate in which the organic partitions are formed, c) hydrophobizing the hydrophilized surface of the substrate using plasma, and d) inkjet-printing RGB organic solvents between the organic partitions on the hydrophobized substrate; and a plasma apparatus therefor. Interference and diffusion phenomena are simply and efficiently prevented in printing solutions when the RGB organic solvents are inkjet printed through the use of the RGB printing method using plasma pretreatment and an atmospheric plasma apparatus of the invention. Therefore, the quality of display devices using RGB organic solvents is substantially enhanced.
    • 本发明涉及使用等离子体预处理的RGB印刷方法及其等离子体设备,并且具体地涉及:使用等离子体预处理的RGB印刷方法,其包括a)在无机基材上形成有机分区,b)将基材表面亲水化 c)使用等离子体将基板的亲水化表面疏水化,以及d)在疏水化基板上的有机分区之间喷墨印刷RGB有机溶剂; 及其等离子体装置。 当通过使用使用本发明的等离子体预处理和大气等离子体装置的RGB印刷方法喷墨印刷RGB有机溶剂时,在印刷溶液中简单且有效地防止干扰和扩散现象。 因此,使用RGB有机溶剂的显示装置的质量大大提高。