会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Foundation structure and construction method of the foundation structure
    • 基础结构基础结构与施工方法
    • JP2007113270A
    • 2007-05-10
    • JP2005305774
    • 2005-10-20
    • Nippon Steel CorpNippon Steel Engineering Co Ltd新日本製鐵株式会社新日鉄エンジニアリング株式会社
    • SAEKI EIICHIRONAGATA MAKOTOWADA MASATOSHI
    • E02D27/12E02D5/28E02D5/56E02D27/01
    • PROBLEM TO BE SOLVED: To provide a foundation structure capable of sufficiently ensuring bearing capacity to reduce cost and enlarging an applicable extent regardless of hardness of the ground and a construction method of the foundation structure.
      SOLUTION: The ground near the front end of a pile is loosened after it has been confirmed that the front end of the pile of a steel pipe pile 2 is arrived to a bearing layer, and after then, load of an upper structure 4 is added to make the settlement of the steel pipe pile 2 by a loosening part to display bearing capacity RP1 of the front end of the pile and, at the same time, ground reaction force also acts to the bottom of a pressure resisting slab 3 making the settlement accompanied with the steel pipe pile 2 to obtain bearing capacity RS. Accordingly, bearing capacity of the front end of the pile is sufficiently ensured to enable bearing capacity (RP1+RP2+RS) of the whole foundation structure to rise, it can be also applied to a large scaled building 1 while contemplating the reduction of a cost without increasing a pile diameter or the number of piles. Further, the settlement of the steel pipe pile 2 is hard to occur after the display of the bearing capacity RP1, and differential settlement can be prevented even if a surface layer ground is weak.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种能够充分确保承受能力以降低成本并扩大适用范围的基础结构,而与地面的硬度和基础结构的施工方法无关。 解决方案:在确认钢管桩2的桩的前端到达轴承层之后,桩的前端附近的地面松动,之后,上部结构的载荷 4,通过松动部分进行钢管桩2的沉降,以显示桩前端的承载力RP1,同时地面反作用力也作用于耐压板3的底部 使沉降与钢管桩2一起获得承载能力RS。 因此,充分确保了桩的前端的承载能力,使得整个基础结构的承载能力(RP1 + RP2 + RS)上升,同时也考虑到减小了 成本不增加桩直径或桩数。 此外,在显示承载能力RP1之后难以发生钢管桩2的沉降,并且即使表层地面较弱也能够防止差异沉降。 版权所有(C)2007,JPO&INPIT
    • 2. 发明专利
    • Pile head reinforcing member and pile head reinforcing structure using the same
    • 桩头加固构件和桩头加固结构
    • JP2009091899A
    • 2009-04-30
    • JP2009021321
    • 2009-02-02
    • Nippon Steel CorpNippon Steel Engineering Co Ltd新日本製鐵株式会社新日鉄エンジニアリング株式会社
    • SAEKI EIICHIRONAGATA MAKOTOTOMIMOTO ATSUSHI
    • E02D27/12
    • PROBLEM TO BE SOLVED: To provide a pile head reinforcing member of simple structure for joining the pile head of a foundation pile to a foundation structure by a small number of work in a field and at a low construction cost, and a pile head reinforcing structure.
      SOLUTION: The pile head reinforcing member 1 with a plurality of reinforcements 4 welded to extend upward so as to be connected to an upper structure is joined to the outer periphery of a cylindrical steel ring 2 having an inner diameter slightly larger than the outer diameter of the pile head 3a of the foundation pile 3 by insert-fitting the cylindrical steel ring 2 to the pile head 3a of the foundation pile 3, and filling a filling-solidifying material 6 selected from mortar or cement paste between the outside of the pile head of the foundation pile 3 and the inside of the pile head reinforcing member 1 and solidifying it. An unbonded material 5 is applied to a portion immediately above the steel ring 2, of each reinforcement 4 welded to the steel ring 2.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种结构简单的桩头加强构件,用于通过少量的现场工作和低建筑成本将基础桩的桩头与基础结构接合,并且桩 头部加强结构。 解决方案:具有焊接成向上延伸以与上部结构连接的多个加强件4的桩头加强构件1接合到圆柱形钢环2的外周,圆柱形钢环2的内径略大于 通过将圆柱形钢环2插入基础桩3的桩头3a,将基础桩3的桩头3a的外径填充到填充固化材料6中,该填充固化材料6选自砂浆或水泥浆的外部 基桩3的桩头和桩头加强构件1的内部并固化。 将未粘接材料5施加到焊接到钢环2上的每个加强件4的钢环2正上方的部分。版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • Foundation structure and construction method of the foundation structure
    • 基础结构基础结构与施工方法
    • JP2011047274A
    • 2011-03-10
    • JP2010271538
    • 2010-12-06
    • Nippon Steel CorpNippon Steel Engineering Co Ltd新日本製鐵株式会社新日鉄エンジニアリング株式会社
    • SAEKI EIICHIRONAGATA MAKOTOWADA MASATOSHI
    • E02D27/34E02D27/12
    • PROBLEM TO BE SOLVED: To provide a foundation structure and a construction method of the foundation structure, capable of reducing the cost while securing a sufficient bearing capacity, and extending the application range regardless of the hardness of the ground.
      SOLUTION: The ground in the vicinity of a pile tip of a steel pipe pile 2 is loosened after confirming that the pile tip reaches a support layer, and the load of an upper structure 4 is subsequently added thereto, whereby the steel pipe pile 2 is settled by the loosened portion to cause the pile tip to develop a bearing capacity RP1, and a bearing capacity SR is also obtained by action of ground reaction on the bottom surface of a pressure resisting slab 3 settling with the steel pipe pile 2. Accordingly, the bearing capacity of the pile tip can be sufficiently secured to enhance the overall bearing capacity (RP1+RP2+RS) of the foundation structure, and the foundation structure can be applied to a large-scaled building 1 while reducing the cost without increase of pile diameter or the number of piles. Further, since the settlement of the steel pipe pile 2 is hardly caused after the tip support force RP1 is exerted, uneven settlement can be prevented even if the surface layer ground is soft.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供基础结构的基础结构和施工方法,能够在确保足够的承载能力的同时降低成本,并且延长施加范围,而不管地面的硬度如何。 解决方案:确认桩顶到达支撑层后,钢管桩2的桩顶附近的地面松动,随后将上部结构体4的载荷加入其中,由此钢管 桩2由松动部分沉降,使桩端产生承载力RP1,并且通过在与钢管桩2沉降的耐压板3的底面上的地面反作用来获得承载力SR 因此,可以充分确保桩头的承载力,以提高基础结构的总承载力(RP1 + RP2 + RS),并且可以将基础结构应用于大型建筑1,同时降低成本 不增加桩直径或桩数。 此外,由于在施加末端支撑力RP1之后难以引起钢管桩2的沉降,因此即使表层地面柔软,也可以防止不均匀的沉降。 版权所有(C)2011,JPO&INPIT
    • 4. 发明专利
    • Rotational intrusion steel pipe pile
    • 旋转浸入式钢管
    • JP2007211488A
    • 2007-08-23
    • JP2006032684
    • 2006-02-09
    • Nippon Steel CorpNippon Steel Engineering Co Ltd新日本製鐵株式会社新日鉄エンジニアリング株式会社
    • NAGATA MAKOTO
    • E02D5/56E02D5/28E02D5/72
    • PROBLEM TO BE SOLVED: To provide a rotational intrusion steel pipe pile capable of heightening front end bearing force while suppressing labor, time and cost required for construction.
      SOLUTION: The substrate on the upper side of the inclined plate 4 is constrained with the outer circumferential plate 5 by providing the whole ring-like outer circumferential plate 5 along the outer circumferential edge of an inclined plate 4 of a blade section 3 and, at the same time, it can be hard to have an influence of the slack of the upper substrate, and since the fall of bearing force with the slack of the substrate is relaxed, the front end bearing force can be heightened. Accordingly, since sufficient front end bearing force can be obtained without carrying out consolidation of foundation caused by discharge of cement-milk etc., labor, time and cost required for the construction of a pile can be reduced and, at the same time, an influence on ground water environment by cement etc. can be eliminated.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种能够提高前端承受力的旋转侵入钢管桩,同时抑制施工所需的劳动力,时间和成本。 解决方案:通过沿叶片部分3的倾斜板4的外圆周边缘设置整个环形外周板5,倾斜板4的上侧的基板被外周板5约束 并且同时可能难以影响上基板的松弛,并且由于随着基板的松弛的承载力的下降而松弛,因此可以提高前端承载力。 因此,由于能够在不进行由水泥浆等排出而引起的基础的固结的情况下获得足够的前端承受力,所以可以减少桩的施工所需的劳动力,时间和成本,同时, 可以消除水泥等对地下水环境的影响。 版权所有(C)2007,JPO&INPIT
    • 5. 发明专利
    • Steel pipe pile and construction method for the same
    • 钢管及其构造方法
    • JP2012136823A
    • 2012-07-19
    • JP2009096199
    • 2009-04-10
    • Nippon Steel Engineering Co Ltd新日鉄エンジニアリング株式会社
    • NAGATA MAKOTOSAWAISHI MASAMICHIWADA MASATOSHI
    • E02D5/56E02D5/28E02D7/20E02D7/22E02D7/28
    • E02D5/28E02D5/56
    • PROBLEM TO BE SOLVED: To provide a steel pipe pile capable of securing strength with a simple shape while improving penetration performance to the foundation so as to reduce processing cost; and a construction method for the same.SOLUTION: A steel pipe pile is provided with a hollow steel pipe 112, a first spiral blade 114 formed in spiral shape around the outer periphery of the steel pipe by at least one or more turn from one end side to the other end side of the steel pipe continuously, a first cut-out part 122 formed by cutting out a portion of the circumference in the whole circumference of the steel pipe along the first spiral blade on one end side of the steel pipe, and a second cut-out part 124 in which the circumference other than a portion of the circumference in the whole circumference of the steel pipe is cut out along a line connecting a start end 122a to a terminal end 122b of the first cut-out part.
    • 要解决的问题:提供一种能够以简单的形状确保强度的钢管桩,同时提高对基础的穿透性能,从而降低加工成本; 及其施工方法。 解决方案:钢管桩设置有中空钢管112,第一螺旋叶片114,其从一端侧至另一端至少一个或多个弯曲形成螺旋形状,围绕钢管的外周 在钢管的一端侧沿着第一螺旋叶片在钢管的整个圆周上切割圆周的一部分而形成的第一切割部122,以及第二切割部122, 沿着连接起始端122a与第一切出部的末端122b的线切断钢管的整周的圆周的一部分以外的圆周的外出部124。 版权所有(C)2012,JPO&INPIT
    • 6. 发明专利
    • Structure and method for reinforcing existing retaining wall
    • 用于加固现有保持墙的结构和方法
    • JP2012102580A
    • 2012-05-31
    • JP2010253435
    • 2010-11-12
    • Nippon Steel Engineering Co Ltd新日鉄エンジニアリング株式会社
    • SAWAISHI MASAMICHIOWADA AKIRANAGATA MAKOTOWADA MASATOSHI
    • E02D17/20
    • PROBLEM TO BE SOLVED: To provide a structure and a method for reinforcing an existing retaining wall, which can increase shear strength of ground together with the existing retaining wall by reducing an influence on land except an existing retaining wall portion.SOLUTION: A structure for reinforcing an existing retaining wall includes first and second piles 102A and 102B which each comprise a pile body made of a steel pipe and a spiral blade 110 spirally provided on the leading end and peripheral surface of the pile body and which each have the leading end of the pile body installed deeper than a sliding surface 12 of ground 10, and a connecting portion 120 for connecting pile heads of the first and second piles together in the upper section of the ground. The first pipe is installed in the ground in a vertical direction or an oblique direction in which the leading end of the pile body is directed toward an existing retaining wall 20, and the second pile is installed in the ground in the oblique direction along the existing retaining wall.
    • 要解决的问题:提供一种用于加强现有挡土墙的结构和方法,其可以通过减少对现有挡土墙部分之外的土地的影响而增加地面与现有挡土墙的剪切强度。 解决方案:用于加强现有挡土墙的结构包括第一和第二桩102A和102B,每个桩102A和102B包括由钢管制成的桩体和螺旋形地设置在桩身的前端和外围表面上的螺旋叶片110 并且其每一个都具有比地面10的滑动表面12更深的桩身的前端,以及用于将第一和第二桩的桩头连接在地面上部的连接部分120。 第一管道沿垂直方向或倾斜方向安装在地面上,其中桩身的前端指向现有的挡土墙20,并且第二桩沿着现有的保持壁20沿倾斜方向安装在地面上 挡土墙。 版权所有(C)2012,JPO&INPIT
    • 7. 发明专利
    • Pile head joint structure
    • 桩头接头结构
    • JP2012082620A
    • 2012-04-26
    • JP2010229952
    • 2010-10-12
    • Nippon Steel Engineering Co Ltd新日鉄エンジニアリング株式会社
    • NAGATA MAKOTOWADA MASATOSHI
    • E02D27/00E02D27/12
    • PROBLEM TO BE SOLVED: To provide a pile head joint structure capable of adjusting the construction errors of the vertical direction, horizontal direction and inclination angle of piles and supporting and fixing an upper structure.SOLUTION: The pile head joint structure includes: a cylindrical pile 10 which supports and fixes the upper structure on the upper side; a rod member 104 which is arranged such that the axial direction crosses the hollow part of the pile inside the pile, and is fixed to the pile; a fixing member 110 which has a first end part passing through the lower part of the rod member and a second end part arranged to project from the upper end part of the pile and connected with the upper structure, and adjusts the horizontal direction position of the upper structure within a movable range of the pile; and a hardening member 150 which is filled in the hollow part of the pile and fixes the fixing member in the hollow part of the pile.
    • 要解决的问题:提供一种能够调节桩的垂直方向,水平方向和倾斜角度的构造误差并支撑和固定上部结构的桩头接头结构。 解决方案:桩头接头结构包括:支撑并固定上侧结构的圆柱形桩10; 杆构件104,其布置成使得轴向方向穿过桩内的桩的中空部分,并且固定到桩; 固定构件110具有通过杆构件的下部的第一端部和布置成从桩的上端部突出并与上部结构连接的第二端部,并且调整水平方向位置 桩的可移动范围内的上部结构; 以及硬化构件150,其填充在桩的中空部分中,并将固定构件固定在桩的中空部分中。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Leading end member of foundation pile, and the foundation pile using the same
    • 基金会领导成员,使用基金会的基金会
    • JP2010222853A
    • 2010-10-07
    • JP2009071712
    • 2009-03-24
    • Hinode LtdNippon Steel Engineering Co Ltd新日鉄エンジニアリング株式会社日之出水道機器株式会社
    • NAGATA MAKOTOKAI NOBUHIROYAMAGUCHI TAKAYUKI
    • E02D5/72E02D5/56
    • PROBLEM TO BE SOLVED: To provide a leading end member of a foundation pile for being jacked into ground while being rotated, which can be easily welded to a foundation pile body as a steel pipe, which can surely transfer the force of construction machinery and surely exert a bearing capacity, by functioning without problems against mechanical factors such as tension, compression, shear, bending and twisting, occurring when the foundation pile is jacked or pulled out and when the foundation pile serves as a pile and supports an upper structure, and which enhances productivity; and to provide the foundation pile using the leading end member.
      SOLUTION: The leading end member of the foundation pile includes an approximately cylindrical leading end body 3, the leading end of which is equipped with a blade 4, and an approximately cylindrical steel joint pipe 2 with proper weldability; the joint pipe 2 is molded in the leading end body 3 and protruded from a back end of the leading end body 3.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种基础桩的前端构件,用于在旋转的同时被插入地面,这可以容易地焊接到作为钢管的基础桩体,这可以确定地转移施工力 机械,一定能发挥承载能力,通过功能无问题地抵抗机械因素如张力,压缩,剪切,弯曲和扭转,当基础桩被拉出或拉出时,以及当地基桩作为桩并支撑上部 结构,提高生产力; 并使用前端构件提供基础桩。 解决方案:基础桩的前端构件包括大致圆筒形的前端主体3,其前端配备有叶片4和具有适当可焊接性的近似圆柱形的钢结合管2; 连接管2被模制在前端主体3中并从前端主体3的后端突出。版权所有:(C)2011,JPO&INPIT
    • 10. 发明专利
    • Water sealing structure of steel pipe pile foundation, and method for constructing steel pipe pile foundation
    • 钢管桩基础水封结构及钢管桩基础施工方法
    • JP2011084923A
    • 2011-04-28
    • JP2009237889
    • 2009-10-15
    • Nippon Steel Engineering Co Ltd新日鉄エンジニアリング株式会社
    • FUKUMURA TAKAYOSHINAGATA MAKOTO
    • E02D31/10E02D13/06E02D27/12
    • PROBLEM TO BE SOLVED: To provide a water sealing structure of a steel pipe pile foundation which can enhance construction performance by preventing the leakage of artesian water, and a method for constructing the steel pipe pile foundation.
      SOLUTION: When the artesian water W ascends in a pile body by making a pile end reach a stratum in which the artesian water W is stored, a float 15 can automatically close a vent hole 11 by a rubber ball 13 by floating up by the buoyancy of the artesian water W. Thus, the water can be sealed by inhibiting the ascent of the artesian water W, and construction performance can be enhanced by preventing the leakage of the water to a ground surface. Additionally, a metal cage 18 connected to the float 15 can be hooked and manually pulled up to bring about a closed state of the rubber ball 13 firm, and enhance water sealing performance.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种能够通过防止自流水泄漏来提高施工性能的钢管桩基础的水封结构,以及用于构造钢管桩基础的方法。 解决方案:当自流水W通过使桩端到达存在自流水W的地层而在堆体中上升时,浮子15可以通过浮动自动地通过橡皮球13自动关闭通气孔11 由于自流水W的浮力,因此可以通过抑制自流水W的上升来密封水,并且可以通过防止水泄漏到地面来提高施工性能。 此外,连接到浮子15的金属笼18可以钩住并手动拉起,以使橡胶球13的关闭状态牢固,并提高水封性能。 版权所有(C)2011,JPO&INPIT