热词
    • 3. 发明专利
    • TEMPORARY POST FIXING METHOD AND DEVICE FOR ERECTING PLUG-IN TYPE POST
    • JPH10311046A
    • 1998-11-24
    • JP13450597
    • 1997-05-09
    • NIPPON STEEL CORPSHINYOU SANKEN KK
    • KOMON TAKESHITAKANO YOSHIHIROMUTAGUCHI SHINICHIFUKUMOTO TATSUYASAWAISHI MASAMICHIKIMURA SHINKICHI
    • E02D5/34E02D27/12E04G21/18
    • PROBLEM TO BE SOLVED: To temporarily fix a post within a steel pipe pile via the wedge action of male and female camber materials even in a small gap by applying the constitution that a temporary fixing device with the male camber material fitted into space between the thick plates of the female camber material having a rod material welded between the thick plates, is inserted in a gap between the internal surface of a steel pipe pile and the external surface of a post, and then the male camber material is hammered. SOLUTION: A female camber material 4 of a temporary fixing device has a rod material welded at the prescribed angle between two rectangular thick plates, and a guide pipe 3 is welded to the external surface of each thick plate. Furthermore, a male camber material 5 made of a square rod material of trapezoidal form or the like is fitted into and inserted into space between the thick plates of the female camber material 4. Then, a guide rod 7 is passed through the guide pipe 3. Also, the temporary fixing device is locked with stoppers 8 at the upper and lower positions of the guide rod 7, and inserted in a gap between a pile and a post in the steel pipe pile by use of the guide rod 7, thereby installing the temporary fixing device at the prescribed position in a gap between the steel pipe pile and the post. Thereafter, the upper surface of the male camber material 5 is driven with a hammer or the like, thereby fastening the post within the steel pipe pile via the wedge action of the male camber material 5 and the female camber material 4.
    • 4. 发明专利
    • Method and apparatus for installing column fixing member in steel pipe foundation pile
    • 在钢管基础桩中安装柱固定构件的方法和装置
    • JP2006291550A
    • 2006-10-26
    • JP2005113014
    • 2005-04-11
    • Nippon Steel CorpShinyo Sanken Kk新日本製鐵株式会社新葉産建株式会社
    • MIZOGUCHI SHINYAKIMURA SHINKICHI
    • E02D27/00E02D27/12E04B1/24E04B1/58
    • PROBLEM TO BE SOLVED: To provide a method for installing a column fixing member in a steel pipe foundation pile, which enables the column fixing member to be easily installed in the steel pipe foundation pile, and which enables the column fixing member to be installed in the state of being accurately positioned. SOLUTION: A hanging jig 10 is detachably attached to the column fixing member 1, and a positioning cross member 50 is attached to the hanging jig 10 after it is positioned. A plurality of attachment jigs 30 are attached to an upper end of the steel pipe foundation pile 20 in such a manner that the upper end is held in a sandwiched state, and a level trestle 40 is attached to the attachment jig 30 in a horizontal attitude at a predetermined height by adjusting its height. Subsequently, the hanging jig 10 is lifted so that the member 1 is inserted into the foundation pile 20; the cross member 50 is placed on the level trestle 40; and the cross member 50 and the level trestle 40 are fixed together after it is positioned, so that the member 1 is temporarily fixed. After the concrete is placed and solidified after that, the member 1 and the hanging jig 10 are separated from each other, and the hanging jig 10, the attachment jig 30, the level trestle 40 and the cross member 50 are removed, so that the member 1 is installed in the foundation pile 20. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种在钢管基础桩中安装柱固定构件的方法,其能够使柱固定构件容易地安装在钢管基桩中,并且能够使柱固定构件 安装在准确定位的状态。 解决方案:悬挂夹具10可拆卸地附接到柱固定构件1,并且定位横向构件50在定位后附接到悬挂夹具10。 多个安装夹具30以使上端保持在夹持状态的方式安装在钢管基础桩20的上端,水平托架40以水平姿态安装在安装夹具30上 通过调整其高度在预定高度。 随后,悬挂夹具10被提起,使得构件1插入基础桩20中; 横向构件50被放置在水平支架40上; 并且横向构件50和水平支架40在定位之后固定在一起,使得构件1暂时固定。 在混凝土放置固化之后,将构件1和悬挂夹具10彼此分离,并且移除悬挂夹具10,安装夹具30,水平托架40和横向构件50,使得 成员1安装在基桩20中。版权所有(C)2007,JPO&INPIT
    • 5. 发明专利
    • Anchor bolt installing method and anchor bolt installing device of steel pipe foundation pile
    • 锚固螺栓安装方法和锚固螺栓安装钢管基础设备
    • JP2006002415A
    • 2006-01-05
    • JP2004179078
    • 2004-06-17
    • Nippon Steel CorpShinyo Sanken Kk新日本製鐵株式会社新葉産建株式会社
    • AKASHI YUZOKIMURA SHINKICHI
    • E02D27/12E02D27/00E04B1/24
    • PROBLEM TO BE SOLVED: To provide an anchor bolt installing method of a steel pipe foundation pile, easy in installation, and installable by highly accurately positioning.
      SOLUTION: A plurality of installing tools 30 are installed in an upper end part of the steel pipe foundation pile 20 by sandwiching its upper end part, and a level stand 40 is installed on these installing tools 30 in a horizontal attitude in the predetermined height by adjusting the height. Afterwards, a positioning horizontal member 50 is positioned and installed on the level stand 40, and a suspender 10 is installed on a set anchor 3 for arranging an anchor bolt 2 in a support member 1. The set anchor 3 is inserted into the steel pipe foundation pile 20 by suspending its suspender 10, and its suspender 10 is positioned and fixed to the positioning horizontal member 50, to temporarily fix the set anchor 3. Afterwards, concrete is placed, and after being solidified, the suspender 10, the installing tools 30, the level stand 40 and the positioning horizontal member 50 are removed.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供钢管基桩的锚栓安装方法,安装方便,高精度定位可安装。 解决方案:多个安装工具30通过夹持其上端部而安装在钢管基础桩20的上端部,并且在这些安装工具30中以水平姿态将水平立柱40安装在 通过调整高度来预定高度。 然后,将定位水平构件50定位并安装在平台40上,并且悬挂件10安装在固定锚固件3上,用于将锚定螺栓2布置在支撑构件1中。将固定锚固件3插入钢管 基础桩20悬挂其悬吊件10,其吊架10定位并固定在定位水平构件50上,以临时固定固定锚固件3.之后,将混凝土放置并固化后,将吊架10,安装工具 如图30所示,水平支架40和定位水平构件50被去除。 版权所有(C)2006,JPO&NCIPI