    • 6. 发明专利
    • WATER PURIFYING STRUCTURE OF STEEL SHEET PILE REVETMENT
    • JPH0975909A
    • 1997-03-25
    • JP23235495
    • 1995-09-11
    • NIKKEN METAL KKNIPPON SOLID CO LTD
    • YONEZAWA MITSUYOSHIHATANO HITOSHI
    • E02B3/04C02F1/00E02D5/04
    • PROBLEM TO BE SOLVED: To make it possible to easily install the structure of water purification and to obtain a revetment having excellent appearance by mounting projecting water passage frames of which the plane shapes project to a river-side via supporting frames on the river-side of the revetment formed by continuously driving steel sheet piles and packing water purifying materials into the cavities thereof. SOLUTION: Stud bolts 2 are mounted horizontally at a prescribed pitch in the arrangement of vertical and horizontal two rows on the river-side of the steel sheet pile revetment formed by the steel sheet piles 1 driven continuously along the river shore. The supporting frames 3 in a walling form are installed in the transverse direction of the river-side of the steel sheet pile revetment by utilizing these stud bolts. Next, both ends of the water passage frames 7 to the two stages of the upper and lower supporting frames 3 are mounted by perpendicular pin connecting structures 14. These water passage frames 7 are precast products made of reinforced concrete and are provided with plural water passage ports 8 of a slit shape long in the longitudinal direction. Stone lumps or shells subjected to an incineration treatment are loaded as the water purifying materials into the cavities of the respective water passage frames 7 installed in such a manner, by which the water purification is executed.
    • 8. 发明专利
    • FORMWORK CLAMPING DEVICE FOR INDEPENDENT CONCRETE COLUMN
    • JPH1046809A
    • 1998-02-17
    • JP22436896
    • 1996-08-07
    • NIKKEN METAL KK
    • TAJIMA NOBUAKIMATSUMOTO KANTAYUKI TAKESHISOYAMA SADAICHIYONEZAWA MITSUYOSHI
    • E04G13/02E04G17/00
    • PROBLEM TO BE SOLVED: To make the construction work easier in a narrow space when clamping from the outer periphery for reinforcing a rectangular column formworks. SOLUTION: A formwork clamp device comprises two lateral joists 11 facing each other around the rectangular column formwork 8 and two lateral joists 12 facing each other is the direction perpendicular to the joints 11. Each lateral joist 11 or 12 comprises a lever member 15 or 18 contacted to the outer surface of the column formwork 8 and a truss 17 or 20 fixed to the outer side surface of the lever member 15 or 18 in a detachable manner. Connections of these members are performed with bolts and nuts for example. The lateral joists 11 and 12 have trusses 17 or 20 in construction so that a sufficient strength can be obtained with a light weight. Also, the trusses 17 and 20 can be separated from the lever members 15 and 17, so that individual member can be made to a small size and a light weight. Therefore, even tough a working area is narrow as in the case where scaffolding for frameworks is located around it, the members can be carried in easily and the work can be performed easily. If the trusses 17 and 18 are made of a plurality of truss pieces 16 and 19 in construction, then individual member can be made much lighter.
    • 9. 发明专利
    • FORM DEVICE FOR REINFORCING CONCRETE LINING AND PROCESS OF REINFORCING CONCRETE LINING CONSTRUCTION METHOD
    • JPH10220031A
    • 1998-08-18
    • JP3843497
    • 1997-02-06
    • NIKKEN METAL KK
    • YONEZAWA MITSUYOSHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To prevent a form from being inclined during filling concrete for reinforcing concrete lining around an existing post in order to reinforce earthquake resistance. SOLUTION: A form 4 is provided around an existing post 1 is formed therein with openings 5 at several positions. Spacer devices 26 are fitted in the openings 5 in the four side surfaces of the post 1 at the second counted from the bottom of the post 1, respectively, jack bolts 14 in the spacer devices 26 are adjusted so as to regulate spaces between the form 4 and the four side surfaces of the post 1. Concrete is filled through the lowermost openings 5, up to a level in the vicinity of the lower edges of the lowermost openings 5. Then, the filling of the concrete is interrupted once, and the spacer devices 26 are removed from the openings 5 at the second counted from the bottom of the post 1 while the openings 5 at the second counted from the bottom of the post 1 are covered, and are then fitted in the openings 5 at the third counted from the bottom of the post 1, and the concrete is filled through the opening 5 at the second. With the repetitions of this work upward along the form 4 from the bottom, the concrete is placed over the entire height of the post 1 therearound.