热词
    • 1. 发明专利
    • ARCUATE UNDERGROUND LAYING METHOD FOR PIPE
    • JPH0941876A
    • 1997-02-10
    • JP21397395
    • 1995-08-01
    • NIPPON STEEL CORP
    • NOZAKI KEITAOSAWA SHINICHISAKUTA KENICHI
    • E21D9/093E21D9/06F16L1/024
    • PROBLEM TO BE SOLVED: To maintain pipe laying track of a pipe with accuracy in work execution and quickly and smoothly conduct the laying work even when the conditions of the soil properties or the like are changed. SOLUTION: A shield machine 2 is installed on the start side, a pipe propelling force applying device 21a is installed on the arrival side, and an advancing pipe 3 is installed in an arc shape by the shield machine 2 and an excavating device 6 provided at the front end of the advancing pipe 3. An expanding pipe 9 is connected to the advancing pipe 3 on the arrival side, the ground is expansively excavated by an expanding device 10 provided at the connection section of the advancing pipe 3 and the expanding pipe 9, and the expanding pipe 9 is drawn by the shield machine 2. When the expanding pipe 9 is connected to an laying pipe 11 and the laying pipe 11 is drawn by the shield machine 2, back tension is applied to the expanding pipe 9 or the laying pipe 11 by the pipe propelling force applying device 21a, and the laying track of a pipe is adjusted, or the backward drawing force is applied by the propelling force applying device 21a, reciprocating action are applied to the pipe together with the forward drawing force of the shield machine 2, and the resistance of the soil properties is reduced.
    • 7. 发明专利
    • UNDERGROUND LEAD-IN CONSTRUCTION METHOD FOR PIPE
    • JPH08326964A
    • 1996-12-10
    • JP15881695
    • 1995-06-02
    • NIPPON STEEL CORP
    • ONO TOSHITAKAOBA NOBUONOZAKI KEITA
    • E21D9/06F16L1/024
    • PURPOSE: To provide a long distance underground laying process of pipe which can prevent the breakage of a drill pipe, in a construction process to lay a large diameter of pipe while expanding a small diameter of hole. CONSTITUTION: The processing device is composed of a hole expanding device which furnishes a rotatable device 3, a large diameter hole expansion head 5, its rotation driving device 7, and a skin plate 10 provided to cover the front end periphery of pipes 14 divided at specific lengths slidable, at the rear end of a drill pipe 2 in a small diameter hole, and a lead-in jack device 11 provided at the front end of the pipes 14. Furthermore, at the rear end of the lead-in jack device 11, divided pipes 14 are connected, and they are combined movable by intermediate drawing jack device 15 respectively, and after a hole expansion process to expand the front part of the pipe at a specific length by rotating the hole expansion head 5 while adding a tensile force to the drill pipe 2 is carried out, the lead-in jack device 11 is operated, and then, the intermediate drawing jack devices 15 are operated in order, so as to repeat a pipe lead-in process to draw in the pipe as one stroke without rotating, alternately.
    • 8. 发明专利
    • UNDERGROUND LEAD-IN METHOD FOR BURIED PIPE
    • JPH07286683A
    • 1995-10-31
    • JP10168594
    • 1994-04-18
    • NIPPON STEEL CORP
    • ONO TOSHITAKAKAWABATA KAZUONOZAKI KEITA
    • E21D9/06F16L1/024
    • PURPOSE:To accomplish an underground lead-in method for a buried pipe by which trouble such as breakage or the like in a drill pipe can be prevented in an installing method for a buried pipe with a large diameter while expanding the diameter of a small bore previously excavated. CONSTITUTION:A buried pipe underground lead-in device consisting of a bore expanding device 3, a rotary swivel device 5, a lead-in jack device provided in the front end part of a buried pipe 10, and a bore wall protecting pipe 12 arranged so as to cover the buried pipe 10 is connected to the rear end of a drill pipe 2 inserted into the previously excavated small diameter bore 1, and tensile force and rotational force are simultaneously applied to the drill pipe 2 by means of an excavating device arranged in the front end of the drill pipe 2, and then, a bore expanding process, in which the buried pipe 10 front part, is expanded to the predetermined length, is carried out while the bore expanding device is rotated. Subsequently, the lead-in jack device 9 is operated by employing the drill pipe 2 as reaction force, and the buried pipe is led into the ground while the buried pipe lead-in process for leading in the buried pipe 10 without any rotation by one stroke is repeated alternately.